Skip to content

Runner shutdown during a composite action step ends the job cancelled instead of failed #4890

Backlog

Description

@Akais24

Describe the bug
When the runner receives a shutdown signal while a step inside a composite action is running, and that composite action has another step after it, the job ends cancelled. Since #1792, a runner shutdown ends the job failed, and it still does for a plain run step and for the last step of a composite action.

A cancelled job looks the same as one a person cancelled. On self-hosted runners that are stopped by a node shutdown, a pod eviction or a spot reclaim, tooling that reruns jobs lost to the runner cannot tell these jobs apart from intentional cancellations.

To Reproduce
Repository: https://github.com/Akais24/runner-composite-shutdown-repro (GitHub-hosted runners only)

  1. Each job runs a step that sends SIGTERM to Runner.Listener 15 seconds in, while the step is still in sleep 300.
  2. The same step runs in three places: a plain run step, the last step of a composite action, and a composite step with another step after it.
  3. Run the repro workflow and compare the job conclusions.

Expected behavior
All three jobs end failure, as a runner shutdown does for a plain step.

Runner Version and Platform

2.338.2, ubuntu-latest (GitHub-hosted). Also seen on 2.337.0, Linux, self-hosted ephemeral runners.

What's not working?

Two runs gave the same result: 45765619032 and 45765789878.

Job Where the stopped step runs Conclusion
plain-step plain run step failure
composite-last-step last step of a composite action failure
composite-step-with-next-step composite step with another step after it cancelled

Job Log Output

From composite-step-with-next-step:

##[error]The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
##[error]The operation was canceled.
##[end-action id=__self.__run;outcome=cancelled;conclusion=cancelled;duration_ms=27587]
##[start-action display=Run echo "next step";id=__self.__run_2]
##[end-action id=__self.__run_2;outcome=skipped;conclusion=skipped;duration_ms=0]

Runner and Worker's Diagnostic Logs

On a self-hosted runner, the worker log shows the composite handler setting the result:

Update job result with current composite step result 'Canceled'.

Cause
#1792 made StepsRunner choose the result from the shutdown token (StepsRunner.cs#L152-L154):

jobContext.Result = HostContext.RunnerShutdownToken.IsCancellationRequested
                    ? TaskResult.Failed
                    : TaskResult.Canceled;

CompositeActionHandler still sets Canceled unconditionally in two places:

The second place runs for the step after the stopped one and overwrites the result with Canceled. Applying the same RunnerShutdownToken check in both places should make composite actions match plain steps. I can open a PR with this change and an L0 test if that helps.

I used an AI assistant to analyze the code, build the reproduction and write this report. The results above come from the linked runs.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions