Repository navigation
Conversation
…e restores the cache the wasm job saved (not to be merged) A throwaway probe of stage 2 of the Build phase: a comment line in .github/actions/build-bundle/action.yml, so that release.yml and deploy.yml run the bundle build in their dry runs (the code path of an rc or a tag build). They should find the cache deploy-release that the wasm job saved on main, and skip compiling worker-build. To be closed unmerged. Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
aRustyDev
temporarily deployed
to
preview-control-plane
November 23, 2026 03:53 — with
GitHub Actions
Inactive
Owner
Author
|
Closed unmerged: a throwaway probe of #356. Its comment in build-bundle made release.yml and deploy.yml run the bundle build in their dry runs: both restored the cache deploy-release that the wasm job saved on main ("Cache hit"), found worker-build already installed (0.25 s, was 106 s), and took 176 s and 165 s (a tag build was 328 and 341 s, an rc build 310 and 313 s). The evidence is recorded in .agents/plans/ci-workflows/phases/0004-build.md. |
aRustyDev
added a commit
that referenced
this pull request
Nov 23, 2026
…): 238 s cold, 79 s warm, and the bundle restores the cache (#359) After #356 merged, main's run saved the cache deploy-release (249.3 MB) and a dispatch of build.yml on main with the plan wasm measured the warm job: 79 s against 238 s cold, the worker-build install 110.7 s to 0.85 s, the Worker 74 s to 44 s, the edge Worker 17 s to 3 s. The stage's purpose was the bundle, and a probe (#358, closed unmerged, a comment in build-bundle) made release.yml and deploy.yml run it in their dry runs: both restored the cache and found worker-build already installed. deploy.yml's build took 165 s (an rc build was 310 s and a dry run 313 s), release.yml's 176 s (the tags v0.4.0 and v0.3.0 were 328 and 341 s): about 145 to 165 s less on a path a release candidate and a tag wait for. The native migrate build is not helped (30.4 s, the cache holds wasm32 dependencies) and the web build is unchanged. What it does not show is said: a pull request's dry run stood in for a release candidate and a tag, which restore the default branch's cache by GitHub's rule, so the first real release candidate proves it; the nightly full run restores the key daily, which keeps it from the seven-day eviction. Passes 6 and 7 change nothing, with numbers: the job is on no critical path (a full run is 711 s, set by the e2e cell), and the one waste in it, the wrangler install (7.8 s, no command calls it), would cost a change to the action every Rust job shares and to the attested bundle build, for 0.15% of a full run. The status lines say stage 2 is done and stage 3, macos, is next. Co-authored-by: Claude Sonnet 5.5 <[email protected]>
This branch was previously deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
A throwaway probe of stage 2 of the Build phase (#356, merged). Do not merge: it will be closed.
A comment line in
.github/actions/build-bundle/action.yml, so thatrelease.ymlanddeploy.ymlrun the bundle build in their dry runs. That is the code path of a release-candidate or a tag build. The question it answers: does the bundle now restore the cachedeploy-releasethat thewasmjob saved onmain, and how much of its 297 s does that take away?🤖 Generated with Claude Code