The preview provisioner’s wasm32 build was checked only in a standalone workflow that the required gate did not wait for. Run that build check in the gated lint workflow, retain the existing gated script, native and Postgres tests, and remove the duplicate workflow. Route preview infrastructure paths through a tested planner rule.

Validation: wasm32 cargo check, planner and workflow wiring tests, workflow lint and actionlint, and the CI index check. Gate mutation controls are running.

@aRustyDev
aRustyDev temporarily deployed to preview-control-plane November 18, 2026 05:00 — with GitHub Actions Inactive
@aRustyDev
aRustyDev merged commit bbb17f8 into main Nov 18, 2026
45 checks passed
@aRustyDev
aRustyDev deleted the codex/preview-required-ci branch November 18, 2026 05:29
aRustyDev added a commit that referenced this pull request Nov 18, 2026
…this was open

#298 moved the provisioner's wasm32 check into lint and deleted the standalone workflow, so the cicd.md row added here for it is removed, the table names 23 of 23 files, and the record in the phase document says five rows were added (four workflows and the triggerd action), that two of the three corrected statements remain (the third went with the workflow), and that the workflow lint passes on 17 workflows and 6 actions on this head.

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
aRustyDev added a commit that referenced this pull request Nov 18, 2026
…d's file table true (#299)

* docs(plans): correct M6's account of probe B, which two guards refuse

The plan said a stale index row would fail lint / deps alone. The run showed that the guard's own test (test-check-ci-index.sh, which runs the guard on the real repository) fails in test / ci-scripts too, as the planner's rule for an index says; the probe had been checked locally against the guard and not against its test.

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>

* docs(plans): record M6 as done and the migration's acceptance, and measure the cost again

Every criterion of the plan's 'the migration is done when' is shown by a run or a file, in a table in the phase document: ci.yml holds only changes, the calls and gate; a full dispatch run, the nightly, an rc/* run and affected-only pull-request runs are green; the job sets of a full run before and after differ only by the five verdict jobs; flake-hunt.yml is unchanged; and 14 probes turned the real gate red. The parity of the whole migration is attributed, not only counted: 0 jobs gone, and every difference is the migration's by design or another pull request's.

Research 0019 measures the baseline again the way 0017 did: a full run costs 931 runner-seconds more at the median, of which 43 s (0.8%) are the five verdict jobs, and the migration adds 15 to 19 s to the critical path. Three small tools next to ci-baseline.py let a number in it be recomputed.

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>

* docs(ci): give every workflow and action a row in cicd.md, and correct three statements the migration made false

cicd.md's file table named 18 of the 24 workflows and actions on disk: five workflows (the preview control plane and the Cloudflare infrastructure ones) and the triggerd action had a row in the indexes and none in the table. The rows are added, from what each file does.

Three statements the migration had made false are corrected: running.md's row for test.yml (the cells moved into it in M5b), a comment in flagship.yml (deps moved to lint.yml in M4) and the index row of preview-control-tests.yml (its tests run in test.yml since M5a).

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>

* docs(plans): record that the e2e schedule fired under the new name

Run 44239551503, at 04:45 UTC on 2026-11-18 (the cron is 04:41), on main at 40d7fa0: success, e2e-mail in about 11 minutes and e2e in about 15. The dispatch of the same workflow cannot show that the schedule moved with the file.

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>

* docs(ci): follow #298, which removed preview-control-tests.yml while this was open

#298 moved the provisioner's wasm32 check into lint and deleted the standalone workflow, so the cicd.md row added here for it is removed, the table names 23 of 23 files, and the record in the phase document says five rows were added (four workflows and the triggerd action), that two of the three corrected statements remain (the third went with the workflow), and that the workflow lint passes on 17 workflows and 6 actions on this head.

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>

---------

Co-authored-by: Claude Sonnet 5.5 <[email protected]>

This branch was previously deployed

1 inactive deployment
preview-control-plane — 5b834a8a Deployed Nov 18, 2026 by aRustyDev via reconcile #72
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant