Skip to content

ci: rename e2e-schedule.yml to e2e.yml (migration M6) - #289

Merged
aRustyDev merged 3 commits into
mainfrom
ci/e2e-workflow
Nov 18, 2026
Merged

aRustyDev merged 3 commits into
mainfrom
ci/e2e-workflow

Conversation

@aRustyDev

Copy link
Copy Markdown
Owner

What

M6, the last stage of Phase 1 of the CI split (plan, phase):
e2e-schedule.yml is renamed e2e.yml (name: e2e), which is the plan's layout for the E2E concern. After this the migration's stages are all merged, and
what is left is its acceptance. Three commits: the plan documents (M5b recorded as done, M6 planned in detail), the build, and a one-line note that main's own run on #281's merge commit
was green (42 of 42), which was still running when the first was written.

What changes in the repository

  • e2e.yml (renamed with git mv, so the history follows): name, the paths: filter of its own pull-request trigger, and the concurrency group
    (e2e-schedule-${{ github.ref }} to e2e-${{ github.ref }}). The two jobs e2e and e2e-mail, their calls of contract-cell.yml, their with: and
    their permissions: are not touched. Four comments that ci: move the contract cells and the judging of their markers into test.yml (migration M5b) #281 made false (they said ci.yml runs the cell and that ci.yml's contract job grants
    contents: read; both are test.yml's now) are corrected in the same edit.
  • The name where it is used: the planner test's NO_CHECK_WORKFLOWS, the workflows index (the row of e2e.yml, and contract-cell.yml's list of callers),
    cicd.md (the row, whose note says the file was named e2e-schedule.yml until now, the list of callers of contract-cell.yml, and one sentence),
    testing/techniques/app-and-e2e.md, and two pointers in the contrail plan. The dated records of runs under the old name (testing/status.md G-31,
    cicd-review/FINDINGS.md) stay as written.
  • The planner needs no change. e2e.yml runs no check, so it falls under the generic .github/workflows/ rule exactly as the old file did.

What is particular to this stage

  • It is not a callee, so the callee stages' probes (a planned job skipped, a skipped verdict) cannot show anything about it: gate does not read this workflow.
    Its two probes are the two stale references a rename can leave and the gate does see (below).
  • The run history splits. Runs of the old file stay under e2e-schedule; the new file starts its own. The schedule moves with the file.
  • This is the first stage whose own run is affected-only, because it does not edit ci.yml. It is one real data point for the migration's acceptance, not the whole of it.
  • Its own pull request runs the workflow: the paths: filter names e2e.yml, so the two cells run on this PR, which is what proves that the renamed call is valid.

Proof

  1. Parity, mechanically (scripts/ci-commands.py): 53 jobs before, 53 after: 51 unchanged, 2 moved, 0 changed, 0 appeared, 0 gone; PARITY. e2e and e2e-mail moved
    from e2e-schedule.yml to e2e.yml, "every one identical". The control, on this very change: a copy of the new file whose e2e-mail call runs the wrong pass, and one whose
    e2e-mail call lost its permissions, are each reported CHANGED ... (NOT expected) with exit 1.
  2. Locally: the 37 commands of test.yml's ci-scripts under dash (the list compared with the workflow's mechanically: the gate's 196 cases, the planner's 7,008 checks, the
    wiring test's 136) and the guards of deps (18 workflows and 6 actions, each with its row), and the mutant driver: mutants=226 killed=226 survived=0 broken=0 equivalent-wrong=0. None of the changes adds or removes a check (the planner test's list swaps one name for another), so the counts are ci: move the contract cells and the judging of their markers into test.yml (migration M5b) #281's.

(The run, the e2e workflow's own run and the two probes are added below when they have run.)

What this does not show

  • That the schedule fires under the new file name: it is read from the run list the morning after the merge (the next 04:41 UTC), and said in the migration's acceptance.
  • That a failing e2e blocks nothing: unchanged, not probed.
  • Comments: ci-commands.py does not compare them; the four corrected ones were read in the diff.

aRustyDev and others added 3 commits November 17, 2026 16:53
…e2e-schedule.yml)

M5b merged as #281: parity, the wiring checks, the mutants, two full runs and two probes are recorded in the phase document, with what the stage found (the cost of the default cell job, a cell's new check name, a Cargo.lock swept in by commit -a).

M6 is planned in detail: it is not a callee, so the callee stages' probes cannot show anything about it. Its two probes are the two stale references a rename can leave and the gate does see (the planner test's list, the index row). It is also the first stage whose own run is affected-only, because it does not edit ci.yml, and its pull request runs the renamed workflow through the paths filter.

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
The daily browser-journey workflow takes the name of its concern, as the plan's layout says: the file, name, the paths filter of its own pull-request trigger and the concurrency group change; the two jobs, their calls of contract-cell.yml, with and permissions do not (ci-commands.py: 2 moved, every one identical, with a control that reports a changed call). Four comments that the move of contract into test.yml made false are corrected in the same edit.

The name follows where it is used: the planner test's list of workflows that run no check, the workflows index, cicd.md, app-and-e2e.md and two pointers in the contrail plan. The planner needs no rule: e2e.yml falls under the generic .github/workflows/ rule exactly as the old file did. The dated records of runs under the old name stay as written.

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
42 of 42 jobs succeeded, the first run of the nested cells on main.

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant