Repository navigation
docs(cicd): review CI/CD against the rc/* release flow - #177
Merged
Merged
Conversation
Add the CI/CD review plan (.agents/plans/cicd-review/): which tests run against which crates (3922 in the ci nextest profile, measured), when each workflow and job triggers, the E2E flows and integration points to add, and the gap to the owner's target flow (PRs to main, a bot-owned rc/vX.Y.Z with a git-cliff changelog, staging only from rc/*, a release with an immutable tag and attestation on an rc merge), with the staged PRs that close it. Correct the docs where they had gone stale: the 22-cell matrix (was 16), the deploy bundle's attestation and ADR-0110 being built (were "not built"), the first staging deploy's failure at assets-upload-session, and a section in cicd.md on where the triggers are too wide or too narrow. Co-Authored-By: Claude Opus 5.5 <[email protected]>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
What
PR 0 of the CI/CD review. It is documentation only, so CI runs
changesandgate..agents/plans/cicd-review/:README.md: the target flow and your decisions of 2026-11-14.FINDINGS.md: answers to the five questions:rc/*flow.PLAN.md: the staged PRs and the repository settings, which you apply yourself.standards.md: the contract matrix has 22 cells (it said 16). The deploy bundle's attestation and ADR-0110 are built (it said they were not).deploy.md: the first staging deploy, run 43676097831, failed atassets-upload-session.cicd.md: a new section, "Where the triggers are too wide or too narrow", and the release, fuzzing and coverage gaps.Your decisions recorded here
rc/*, andmainno longer deploys. This replaces the earlier choice in chore(cd): deploy pipeline per ADR-0110 round 29 (expand, deploy 100 %, smoke, auto-rollback) #49.git-cliff --bumped-version. The rc branch writes the workspace version andCHANGELOG.md. The first release is v0.1.0.Not verified
mdbook buildlocally becausemdbook-mermaidis not installed. The book is not built in CI either.Refs: #49
🤖 Generated with Claude Code