CI: run webview tests with four workers
Problem and evidence
Webview CI currently caps Vitest at one worker. Controlled local profiling and a GitHub-hosted benchmark both found four workers substantially faster without reducing the test inventory.
Hosted benchmark run, commit 86197abeb4527c810ed2e523efce8d95bf3056fb, Node 22.23.4 / Vitest 4.1.12, two repetitions per setting:
| Test configuration | 1 worker median | 2 workers median | 4 workers median |
|---|---|---|---|
| Ubuntu with coverage | 283s | 114s | 95s |
| Windows without coverage | 246s | 238s | 105s |
All 12 repetitions ran the same 174 files / 2,269 tests, with all assertions passing and no retries. All six Linux covered-line sets matched (6,579 covered lines). Ubuntu baseline hardware differed (EPYC 7763 versus 9V45); Windows one/four used the same CPU model, but separate VMs. These are observed test-step improvements, not a demonstrated whole-pipeline 50% reduction. Earlier same-machine local profiling independently favored four workers.
One Ubuntu four-worker repetition exited 1 with Closing rpc while "onUserConsoleLog" was pending; its second repetition passed. Matching Vitest issue #11153 was addressed by PR #11619, listed in 5.1.0-beta.1. Our version lacks that fix. This sample does not establish that increasing workers introduced or increased the flake.
Implementation
- Set the webview CI worker budget to four on the measured Ubuntu/Windows hosted runner classes.
- Preserve forks, isolation, assertions, coverage and unhandled-error handling.
- Keep the change independently reversible; the temporary benchmark harness is evidence, not required production infrastructure.
- Track the upstream teardown fix separately; do not expand this change into an unvalidated major-version upgrade or suppress errors.
Acceptance criteria
- Full webview inventory and coverage contract remain intact on both platforms.
- Relevant package checks and full CI pass; retain and investigate any failures.
- Record before/after test duration, job duration, runner minutes and time until required checks turn green.
- Monitor comparable PRs for failures and duration regressions, recording sample sizes; two repetitions do not establish reliability or p95.
- Document a simple rollback to the previous worker budget.
This increases parallelism within existing runner jobs rather than adding runner shards.