Skip to content

Issue after Bioconductor upgrade #114

Open

Description

@igrisch

Hello,

I've used VISION successfully in the past, but recently upgraded Bioconductor to version 3.14. Since then, I've been getting the following error whenever I try to use the analyze step:

Error in E %*% Cs %*% S - Rog %*% (Roc %*% S) + Cog %*% (Coc %*% (Cs %*% : Matrices must have same number of rows for arithmetic

Any idea what might fix this? This occurred when I was just rerunning an analysis that I've already done (and it worked before-- I'm using the same inputs and everything), so I can only assume it must be some sort of issue with dependencies.

Activity

  1. jordanwhitlock commented on Jun 25, 2023

    @jordanwhitlock

    I also have this error :(

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions