Repository navigation
test: wait for project, window, and demo readiness - #189
Merged
Merged
Conversation
Wait for the displayed branch after launch and every project switch before testing owner-removal admission. Keep production refusal behavior and pre-debounce draft assertions unchanged. Coven-Harness: Codex / gpt-6-astra
Reuse the bounded navigation action helper for initial and reset demo opening, and exercise ignored first opening and Back actions. Keep the historical failure cause and native verification gate explicit. Coven-Harness: Codex / gpt-6-astra
|
The latest updates on your projects. Learn more about Vercel for GitHub.
|
Observe one native size transition when renderer dimensions stay stale despite correct native bounds. Preserve the original polling budget, require both sizes to settle, and restore native bounds when the renderer cannot recover. Cover minimum-size recovery, transient divergence, and permanent mismatch. Coven-Harness: Codex / gpt-6-astra
Check that the original thread row has disappeared before querying Back readiness, preserving both destination conditions and the existing retry budget. Coven-Harness: Codex / gpt-6-astra
This was referenced Oct 12, 2026
BunsDev
added a commit
that referenced
this pull request
Oct 18, 2026
Val decided on #290: Known rough edges keeps only open problems. Six fixed incidents move, word for word, to docs/reviews/2026-10-18-resolved-rough-edges.md, each under the PR that fixed it (#153, #189, #190, #197, #204, #265 and #271). The section now links to them. Entries with an open part stay: the layout e2e note, the demo-thread and sizing test corrections whose causes are unproven, and the poisoned ChatGPT threads. Also: node-pty's line says Modex still ships the beta, the demo-thread note no longer waits on a merge that happened (#189), and the tracker pointers list the open CF PRs after #289 landed. Coven-Harness: Claude Code / claude-opus-5-5
BunsDev
added a commit
that referenced
this pull request
Oct 18, 2026
…ycle 1) (#292) * Record what shipped in plans, specs, README and status Docs and plans steward, cycle 1 (#290). - Plans: a status line on each ledger under docs/superpowers/plans/ and on docs/mac-store-preview-plan.md, naming the PRs and release that delivered it. Unticked boxes stay as history rather than being ticked after the fact. - Specs: routines (Phases 0 and 1 on main), sticky Auto routing (shipped in v0.0.11) and approval rules (parts 1 and 2 shipped, gate off). - README: app-owned sign-in, self-updating Macs from v0.0.12, Windows and Linux installers from v0.1.0, Images and Plugins no longer marked unreleased. - status.md: the site's static fallback follows apps/site/release.json; the delivered release-candidates entry leaves In flight for a pointer to tracker #273; Next 3 points to #286. Coven-Harness: Claude Code / claude-opus-5-5 * Bring reference docs in line with main and the releases Docs and plans steward, cycle 1 (#290). Each change was checked against the code on main, a release section of status.md or a review. - Shipped work no longer reads as pending: the approval rules editor (v0.0.7), Modex sign-in (v0.0.9), 1Password filling (v0.0.11), the notes folder (v0.1.0), the hosted native updater scenarios and the first published-to-published upgrade, and Windows/Linux publication. - Behaviour matches the code: Windows and Linux show no update banner; Auto's judge sees a placeholder for assistant replies and runs `jev` with one attempt; Claude's model list is Modex's fixed aliases; the Settings sections and transport labels; Space options → Agent notes; the companion's policy route and current version; the knowledge fence for overlapping folders; CI's e2e runs the unpackaged build. - The Store record and processed 0.0.8 package are recorded under gate 5. Coven-Harness: Claude Code / claude-opus-5-5 * Close the two finished In flight entries and add the GitHub App to Next Val decided on #290: the local work recovery and retired worktrees entries are done, so they leave In flight. The recovery audit and the archive READMEs keep their record. Their one open item, repository authorization through a GitHub App, becomes Next 4, ahead of the out-of-scope Cloud tasks. Coven-Harness: Claude Code / claude-opus-5-5 * Move fixed rough edges into a dated review Val decided on #290: Known rough edges keeps only open problems. Six fixed incidents move, word for word, to docs/reviews/2026-10-18-resolved-rough-edges.md, each under the PR that fixed it (#153, #189, #190, #197, #204, #265 and #271). The section now links to them. Entries with an open part stay: the layout e2e note, the demo-thread and sizing test corrections whose causes are unproven, and the poisoned ChatGPT threads. Also: node-pty's line says Modex still ships the beta, the demo-thread note no longer waits on a merge that happened (#189), and the tracker pointers list the open CF PRs after #289 landed. Coven-Harness: Claude Code / claude-opus-5-5 * Move status.md's release sections into their release reviews Val decided on #290: status.md keeps the Shipped table as the index, and each release's details live in its review. The v0.0.6 to v0.1.0 sections (651 lines) move unchanged to a "Status summary" section at the end of each review. Only link targets change, so they resolve from docs/reviews/. status.md drops from 1,060 to 388 lines. The Shipped rows now link their reviews. Four links that pointed at the old release anchors now point at the reviews. A new convention and step 1 of the release procedure say where a release's details go from now on. Coven-Harness: Claude Code / claude-opus-5-5 * Trim the Mac App Store entry to its current state Val decided on #290. The 52-line In flight entry becomes 15 lines: what Apple shows, what signed acceptance covered, and what is open, each linked to its receipt. The old entry moves unchanged to a "Status summary" section of the October 11 signed-acceptance review, with links re-based to docs/reviews/. The short entry drops two statements that no longer hold. The iPhone CI failures have been diagnosed (resolved rough edges), and the Store recovery changes are on main (edf52fc, #173). Coven-Harness: Claude Code / claude-opus-5-5
This branch was successfully deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
UI tests could continue before a project branch, native window geometry, or iPhone thread destination was ready. Project-removal tests now await the selected branch; the window helper permits one observed native resize transition when renderer dimensions stay stale; and iPhone demo navigation requires the actual destination with one bounded retry. Production behavior is unchanged.
The window helper retains its 15-second budget, 200ms settling check, and rejection of persistent native or renderer mismatches. Tests cover delayed restoration, recovery at the minimum size, independent settling without resize, and persistent failures. The iPhone regression deliberately ignores the first opening and Back actions. Its destination check now first requires the original row to disappear, avoiding repeated accessibility lookups for an absent Back button while preserving both success conditions and the two-attempt, 30-second budget.
Validation: full build, workspace typechecks, and 1,376 unit tests passed (15 skipped). Exact unchanged desktop/site inputs passed 274 desktop and 7 site E2E tests locally, and both hosted macOS jobs passed those counts on a3302b7; all 18 focused window regressions passed locally. Swift parsing and 11 existing pure helper probes passed, and independent review found no issues. These local Swift checks do not establish native acceptance. All six checks passed on a3302b7. Both iPhone jobs passed all 28 UI tests, including the ignored-first-tap regression. Windows passed; Linux passed a same-head retry after an HTTP 504 during packaging.
Failure evidence is retained: an initial local GUI run hit disk exhaustion and passed unchanged after generated-cache cleanup; the previous push iPhone job spent its observation budget inspecting an absent destination before a real retry tap. No underlying product navigation defect is inferred.
Coven-Harness: Codex / gpt-6-astra