Skip to content

[P1][CF-2] Harden Claude Stop, late-message draining, and cancelled-request cleanup on claude -p #275

Closed

Description

@BunsDev

Goal and dependencies

Parent: #273. Priority: P1 — lifecycle correctness. Blocked by: none for reproduction or a narrow native lifecycle patch. Coordinate changes to shared sink/runner interfaces with #274; adopt its contract once available. This issue can ship independently without replacing Claude's runtime.

Make Stop and process shutdown truthful: request interruption, drain supported final messages, withdraw cancelled requests, preserve stderr/exit evidence, and prevent late output from corrupting the next turn.

Evidence and scope

The current status record identifies useful lifecycle work from closed PR #250 while explicitly keeping claude -p. Existing recovery of zero-model-call results from a previously stopped background task must remain intact. Reproduce each proposed regression; this issue does not claim every listed failure currently occurs.

Existing entry points: apps/desktop/src/main/engine/backends/claude.ts, backends/types.ts, engine/runner.ts, and native process/terminal ownership helpers reached from them. Tests to add: apps/desktop/test/claude-lifecycle.test.ts and apps/desktop/e2e/claude-lifecycle.spec.ts; extend existing fake-process fixtures rather than replace the harness. Evidence: docs/reviews/2026-10-18-claude-lifecycle.md.

Implementation steps

  • Read Drive Claude through the Agent SDK instead of claude -p stream-json #250's discussion/diff and current implementation. Capture the installed CLI version and reproduce late notification, cancellation, and process-exit behavior with bounded fake-process scenarios before porting any code.
  • Prefer the native graceful interruption/control path supported by that CLI. Retain bounded escalation to process termination when it does not acknowledge. A Stop click or abort signal is not proof that the subprocess/jobs stopped. Preserve existing timing budgets unless a measured change is justified in the PR.
  • Drain complete late JSONL/UTF-8 messages and final stderr/exit/signal data until confirmed completion or the bounded cleanup path finishes. Tie ownership to the originating turn/runtime generation. Do not let a late prior task's success result complete a new user request.
  • Withdraw native-cancelled approval/question requests; settle outstanding promises once and make old cards inert. Close/delete/quit must retain owned resources until execution is confirmed ended, or clearly report the unresolved state instead of deleting a live worktree.
  • Keep unrelated threads running. Add regressions before each repair, run the applicable suites, update the lifecycle evidence and docs/status.md, and prepare a signed PR. Do not port the SDK execution architecture from Drive Claude through the Agent SDK instead of claude -p stream-json #250.

Acceptance criteria

  • Normal native interrupt, slow acknowledgement, forced termination, and repeated Stop yield explicit outcomes with no duplicate terminal event.
  • Cancelling a pending request removes its actionability; a late answer cannot execute it or satisfy a later request.
  • Late background notifications and zero-model-call results do not finish the next turn; genuine empty outcomes still produce the existing actionable failure rather than hanging silently.
  • Split JSON/UTF-8 and stderr immediately before exit survive bounded draining; debug details report actual exit/signal without leaking credentials.
  • Thread/project deletion waits for the correct owned process/jobs; another active thread is not stopped accidentally.
  • Native/live evidence, scripted fixtures, CI skips, and unperformed platform acceptance are separately identified.

Verification: demonstrate targeted RED → GREEN, then pnpm build, pnpm typecheck, pnpm test, and pnpm test:e2e for the runner/UI changes. Do not solve a reproducible lifecycle error by broadly increasing test timeouts.

Long-running goal prompt — implement

Implement CF-2 for TypeSafeAI/modex under tracker #273. Read this issue, AGENTS.md, docs/status.md, closed PR #250 and its comments, and the current Claude backend/runner before editing. Use an owned worktree and pinned pnpm with Superpowers TDD and systematic debugging. Reproduce the lifecycle shortcomings with the existing fake-process and E2E harness, recording the supported Claude CLI version. Keep claude -p; do not introduce the Agent SDK or an API coding mode.
Make graceful interruption, bounded termination, late-message draining and cancelled-request withdrawal correct for the actual CLI. Preserve the existing stopped-background-task resume fix, job ownership, draft recovery, stderr/exit evidence, and unrelated concurrent threads. A requested Stop is not a stopped process. Guard every late callback by its originating execution. Coordinate shared interface changes with #274 instead of inventing a conflicting identity model. Test every acceptance case here, including split input and a late response to an obsolete card. Make small signed commits and a linked review-ready PR, with fresh targeted/full check outputs and docs/status.md updates. Leave a checkpoint with exact SHAs, process observations, remaining native/platform gates and the next executable step. Do not merge, publish, or force-clean another session's work.

Follow-up long-running goal prompt — verify and finish

Resume CF-2 from current main, its PR and the last checkpoint, verifying worktree ownership first. Do not trust a prior claim that Stop was fixed: run normal interrupt, missing acknowledgement, repeated Stop, cancelled approval, subprocess-exit and late-background-notification scenarios against the actual implementation. Inspect what happens when a new turn starts before an old process emits its final messages, and when project deletion races the drain.
Verify each pending request settles once, old cards stay inert, exit/stderr evidence survives, and a prior zero-model-call result cannot complete the new turn. Confirm no Agent SDK migration or broad timeout relaxation slipped into the patch. Reproduce remaining faults, add failing tests, make the smallest repairs, and rerun applicable build/typecheck/unit/E2E checks. Integrate the landed #274 identity contract when needed without widening scope. Update the evidence receipt with exact tested SHAs and CLI versions, retaining failures/skips and unperformed live acceptance. Prepare the signed PR for review or leave a precise blocked checkpoint; do not merge or release.

Activity

  1. added
    bug
    on Oct 18, 2026
  2. self-assigned this
    on Oct 18, 2026
  3. BunsDev commented on Oct 18, 2026

    @BunsDev
    ContributorAuthor

    CF-2 checkpoint — 2026-10-18

    PR: #286, branch cf2-claude-lifecycle, worktree .worktrees/cf2-claude-lifecycle (owned by this session). It keeps claude -p: no Agent SDK, no API mode.

    SHAs

    • Base: 89c98f280292b13fd9b1c7af1bf2fe65cd2fa0d1. The branch merges main at 7780093, which is CF-1 (Carry native message identity, phases and outcomes from the CLIs into the transcript (CF-1) #282).
    • 62fccb9: red regressions, with the new interfaces declared type-only.
    • 7e78eb9: backend.
    • feb2166: runner and UI.
    • 62ac15c: fixes from independent review.
    • d11cdb6: the title-naming E2E fixture answers the native interrupt. Fixture only.
    • f0b383b: receipt and status.
    • 6856bf3: merge of main with CF-1's conversation-event contract.
    • 172b13f0586853924a390953281adafdd3649fea: a tool call Stop interrupted reads interrupted. This is the tested code.
    • 20a1eea: final records. Docs only. This is the PR head.

    All commits are signed (SSH, verified locally).

    Process observations (live, Claude Code 2.1.302, Haiku, 06:19–06:28 UTC)

    • Interrupt acknowledgement: within 2–10 ms. A pending can_use_tool gets control_cancel_request before the ack. A late answer to it is ignored.
    • Streaming interrupt: final partial assistant, then result error_during_execution, is_error: true, aborted_streaming, within 29 ms.
    • Running Bash tool: no result until stdin ends. With interrupt plus EOF, the result came at 2.65 s and the CLI exited at 3.15 s.
    • Exit code: after an interrupt, the CLI exits with code 1 once stdin ends.
    • Usage limit: the account hit its weekly limit on the seventh probe, so nothing after that is live.
    • Captures and the probe script are in docs/reviews/2026-10-18-claude-lifecycle/.

    Checks at 172b13f (macOS arm64, Node 24.18.1, pnpm 10.34.5, 08:19–08:46 UTC)

    • Frozen install, pnpm build and pnpm typecheck pass.
    • pnpm test passes:
      • worktrees 109/109;
      • core 16/16;
      • desktop 1,521 passed, 16 skipped (15 Windows-only, 1 opt-in OpenKnowledge), of 1,537;
      • desktop native/update 21/21;
      • site 10/10;
      • store-desktop 16/16.
    • pnpm test:e2e: desktop 318 passed, 3 skipped (opt-in real Open Knowledge), 0 failed; site 7/7.
    • Earlier E2E history: the first full run at 62ac15c failed titles.spec's manual-rename case. Its fixture recorded a cancelled naming run only on SIGTERM; d11cdb6 fixes the fixture. The site suite also needed the Chromium headless shell installed on this Mac. Both are in the receipt.
    • After that run, main gained CF-4 (Lay out each turn from its typed items: final answer by phase, live items, attempts, Jump to latest (CF-4) #284). The branch merges with it without conflicts, and PR CI covers that merge.
    • Red first:
      • all 20 new unit cases failed for the intended reasons against main's behaviour;
      • the new Electron case failed at its first step ("Denied");
      • the 3 review regressions failed before 62ac15c;
      • the post-Stop tool-outcome check failed (failed) before 172b13f.

    Acceptance criteria: all six are mapped to tests in the receipt.

    Remaining native and platform gates

    1. Live-model Stop through the Modex UI on Claude 2.1.302, once the account's weekly limit resets (midnight America/Chicago, 2026-10-19):
      • Agent mode: sleep 20 && touch x, approve, then Stop.
      • Expect the thread idle within about 3 s with one stop notice and no failure card. With a Bash call running, that notice is likely "…so Modex terminated it.", since 2.1.302 took 3.2 s to abort one.
      • A following --resume turn should answer normally.
      • Repeat while a permission card is pending. Expect the card to read "Not answered — the turn was stopped".
    2. Windows and Linux: the SIGTERM/SIGKILL escalation and the unconfirmed-pid probe are unexercised. Windows goes through cli-supervisor.exe.
    3. Companion: it still renders withdrawn cards as "Denied", though they are inert (409). Carrying withdrawn to paired clients is CF-6 ([P1][CF-6] Extend the existing event journal and paired-client replay to preserve typed conversation state #279).
    4. CF-1 ([P1][CF-1] Preserve native turn/item identity, message phases, and execution outcomes end to end #274): merged into this branch, so CF-2 now runs on its contract. The one mapping change, post-Stop error results becoming interrupted, is in docs/conversation-events.md.

    Next executable step:

    1. Watch Make Claude Stop truthful on claude -p: native interrupt, bounded exit, withdrawn prompts (CF-2) #286's CI on the merge with current main.
    2. After the limit resets, run gate 1 and append the result to the receipt.
    3. Review and merge Make Claude Stop truthful on claude -p: native interrupt, bounded exit, withdrawn prompts (CF-2) #286 with ~/.claude/scripts/gh-merge-when-green.sh 286 --squash. This session will not merge on its own.

    Coven-Harness: Claude Code / claude-opus-5-5

  4. BunsDev commented on Oct 18, 2026

    @BunsDev
    ContributorAuthor

    CI on #286: all 13 checks pass at head 20a1eea, including the required unit + e2e (macOS) and the iPhone companion job.

    Merge blocker: the PR is BEHIND main, because CF-4 (#284) landed after verification. The branch merges with CF-4 without conflicts, but it needs a branch update and a new CI run before gh-merge-when-green.sh 286 --squash will merge it. This session has not merged.

    Coven-Harness: Claude Code / claude-opus-5-5

  5. BunsDev commented on Oct 18, 2026

    @BunsDev
    ContributorAuthor

    CF-2 reconciliation repair is now PR #291, targeting cf2-claude-lifecycle as Val requested. Original PR #286 and its worktree were not modified. Owned repair worktree: .worktrees/cf2-reconcile; base a6ea0b03df2eb2d93512fa2ea1fc85db65595b7d; signed repair head 9fdaf403697130a2e08af3d25abcada61ae7e610.

    The failure-before-Stop deletion race was reproduced and repaired test-first: retain the original error, wait for exit or bounded Stop confirmation, then retain any unconfirmed PID regardless of turn outcome. Both new backend/runner regressions pass. Local signature verification passed; the prohibited-attribution check printed nothing.

    Verification on the repaired source tree: pinned pnpm 10.34.5 frozen install, full build and typecheck passed. Final pnpm test passed 1,709 tests with 16 existing skips. An earlier full run failed five unchanged Knowledge cases; the isolated file passed 11/11 and the complete rerun passed. The receipt preserves those failures.

    Fresh live acceptance through Modex with Claude Code 2.1.302 / Haiku passed all four scenarios: pending-card Stop (936 ms), approved-command Stop (2,336 ms, command file never written), resume (resumed), and streaming Stop (2,182 characters retained, no failure card). Captured report is committed in the repair. Failure-before-Stop with a process surviving SIGKILL remains simulated; Windows/Linux escalation and live native withdrawal outside Stop remain unperformed.

    pnpm test:e2e is currently running locally on the signed repair head; exact-head CI is being checked. These are not yet passing claims. Logs and red/green evidence are in /tmp/modex-cf2-reconcile; the durable receipt is docs/reviews/2026-10-18-claude-lifecycle.md in #291.

    Main advanced to CF-5 (d3711c6) during verification. Read-only git merge-tree --write-tree a6ea0b0 origin/main found no conflicts; #286 is behind main and its owner must reconcile that branch. This repair introduces no policy-default or timing-budget changes. No merge or release performed. Next step: finish local E2E and #291 CI, then update both PRs with exact results before a separate merge decision.

  6. BunsDev commented on Oct 18, 2026

    @BunsDev
    ContributorAuthor

    CF-2 repair verification is complete at signed head 9fdaf403697130a2e08af3d25abcada61ae7e610 in #291, targeting this branch as Val requested. The failure-before-Stop race retains the original failure and the live process's ownership until exit is confirmed; both regressions failed before the repair and pass afterward.

    • Local build, typecheck and complete unit suite passed: 1,709 passed, 16 existing skips. The initial five unchanged Knowledge-test failures, passing isolated rerun and final passing suite remain documented.
    • Local desktop E2E: 322 passed, 4 opt-in skips, 1 fixture setup failure (ENOSPC, before app startup). That exact cross-origin case passed unchanged on rerun, 1/1. Site E2E: 7/7.
    • macOS CI passed: desktop E2E 326 passed / 1 opt-in live skip, site 7/7, complete units green. iPhone CI passed, including 43 UI tests. Windows/Linux CLI/installer and coverage-upload checks also passed.
    • Live Claude report: pending approval Stop, running command Stop, resume and streaming Stop passed with actual stopped notices. Native withdrawal outside Stop and Windows/Linux native escalation remain unperformed; the stuck-process regression is simulated.

    Important integration boundary: CI checked #291 against base a6ea0b0 (macOS merge checkout d740801). During verification, #286 advanced to 7c9d62c with CF-5, and main advanced to f6976df with CF-7. The new combined tree is not covered by those earlier checks. The owning session's next step is to integrate #291, reconcile current main, and verify the resulting signed head before a separate #286 merge decision. This session has not modified the owner's worktree or merged either PR. CF-3 remains gated on #286 landing.

  7. 13 remaining items

  8. BunsDev commented on Oct 18, 2026

    @BunsDev
    ContributorAuthor

    CF-2 checkpoint — 2026-10-18 14:45 UTC

    PR #286 head: ee496e20cb614ef20f9337a2b15967ee2d923507. All commits are signed. Worktree .worktrees/cf2-claude-lifecycle belongs to this session. claude -p is kept: no Agent SDK and no API mode.

    SHAs since the last checkpoint

    Checks

    Live acceptance at 61cc65d (Claude Code 2.1.302, Haiku, through the app). Every step ended "Stopped." and none left a failure card.

    Step Result
    Card waiting idle in 0.85 s
    Running command idle in 2.37 s, via SIGTERM
    Resume replied "resumed"
    Stream idle in 0.98 s, text kept

    Open items for the owner

    Gates, still unproven

    Next executable step

    1. Val decides on test: reconcile CF-2 evidence checks with current main #298. Merge it into the branch, or update the branch with main.
    2. CI runs at the new head.
    3. Merge with ~/.claude/scripts/gh-merge-when-green.sh 286 --squash, but only when authorized.
    4. Move CF-2 to "On main, unreleased" in docs/status.md.
    5. Release the worktree following docs/worktree-hygiene.md.

    Coven-Harness: Claude Code / claude-opus-5-5

  9. BunsDev commented on Oct 18, 2026

    @BunsDev
    ContributorAuthor

    CF-2 exact-head verification update: #298 is now integrated into #286 at 4c850f3f7beb98dd0a5c31c0938155ab5a2a6acb.

    Parent CI run 39137918193 passed macOS build/unit/E2E and coverage upload. Logs identify checkout d10cd480ed0c2dfabc1d4769447c841a1bd9a923, the merge of this head into main db0bbfdd33b528e44c47e3aaceed3e3f8f0d1069.

    • Unit suites: 1,720 passed, 16 existing skips, zero failures.
    • Desktop E2E: 336 passed, 1 skipped (14.4 minutes); all four conversation-evidence and four conversation-fidelity cases passed. Store passed in 5.6 seconds.
    • Site E2E: 7 passed.
    • Windows and Linux CLI/installer checks passed.

    The parent iPhone companion job 117706122006 remains queued, so final readiness is still pending. Earlier failures and live/native platform limitations remain recorded in the committed lifecycle receipt; these successful checks do not replace those distinctions. Next step: inspect the companion result and recheck current head/reviews before the separate merge decision. No merge or release performed.

  10. BunsDev commented on Oct 18, 2026

    @BunsDev
    ContributorAuthor

    Parent CI at 4c850f3f7beb98dd0a5c31c0938155ab5a2a6acb is now fully successful: run 39137918193. The companion job passed native tests and all 43 UI tests with zero failures. Its checkout was d10cd480ed0c2dfabc1d4769447c841a1bd9a923, matching the macOS job. Previously reported macOS totals stand: 1,720 unit passes / 16 skips, 336 desktop E2E passes / one live opt-in skip, and seven site passes; coverage and Windows/Linux checks passed.

    A new reconciliation gate appeared during final verification: main advanced to ce7549574e176ea4eacfbb3f6bfdd5ce6ffcd19f via #297, and GitHub now marks #286 behind. That main delta changes only conversation-evidence.spec.ts and typed-turns.spec.ts; #297 adopted #298's evidence spec byte for byte, while adding its theme-test render wait. The green run above tested main db0bbfd, not this newly landed main.

    Next step is to integrate current main through the owning session or a separate repair PR, then verify the resulting head. This session continues to preserve ownership of the CF-2 branch. No merge/release performed; the recorded live/native platform limitations remain unchanged. CF-3 remains gated on #286 landing.

  11. BunsDev commented on Oct 18, 2026

    @BunsDev
    ContributorAuthor

    CF-2 checkpoint — 2026-10-18 17:15 UTC (review-ready)

    PR #286 is at head 71d905a08fd11dc9251f4cf6ab064c0ec9df7372. It is up to date with main at 844ae04. Every commit not on main is signed. Worktree: .worktrees/cf2-claude-lifecycle, owned by this session. claude -p is kept: no Agent SDK and no API mode.

    What happened since the last checkpoint

    Checks at the head (71d905a)

    • CI: the required unit + e2e (macOS) passed (job), and so did the coverage upload, CLI and installers on Linux and Windows, CodeQL, and every analysis job. iPhone companion is still pending.
    • Local: build pass, 200/200 targeted unit tests across the lifecycle, Claude backend, background, runner, conversation-events, conversation-migration, evidence, task-context, companion, turn-layout and credit-fallback suites.

    Checks at earlier heads

    • 2154349, local:
      • 196/196 targeted unit.
      • Targeted E2E: 25 passed, plus one teardown timeout under load. That spec passed 4/4 when rerun alone.
    • 4c850f3:
      • CI: all 10 green.
      • Local: 174/174 targeted unit and 17/17 targeted E2E.
    • Last full local run, 61cc65d. It passed with no reruns:
      • pnpm test: 1,548 desktop tests passed and 16 skipped.
      • E2E: 329 desktop passed (plus 4 opt-in skips), and site passed 7/7.

    The Mac's load average was 120–190 for the later heads, so a full local run there would mostly measure the load. CI's full run is the record for the exact head.

    Live acceptance: Claude Code 2.1.302 with Haiku, through the app, at 61cc65d. Every step ended "Stopped." with no failure card:

    • card waiting: idle in 0.85 s;
    • running command: idle in 2.37 s, via SIGTERM;
    • resume: replied "resumed";
    • stream: idle in 0.98 s.

    Later merges did not change CF-2's backend code.

    Gates (unproven, recorded)

    Next executable step (Val)

    1. When authorized, merge with ~/.claude/scripts/gh-merge-when-green.sh 286 --squash, run from the primary checkout. If main moves first, update the branch and let CI rerun.
    2. After the merge:
      • move CF-2 to "On main, unreleased" in docs/status.md;
      • release this worktree by following docs/worktree-hygiene.md: copy out .probes/, then run scripts/worktree.sh release cf2-claude-lifecycle --expect-head <merged SHA>.

    This session will not merge.

    Coven-Harness: Claude Code / claude-opus-5-5

  12. BunsDev commented on Oct 18, 2026

    @BunsDev
    ContributorAuthor

    CI is complete at 71d905a, the #286 head: all 10 check runs passed, including iPhone companion. The PR is up to date with main and ready for review and an authorized guard merge.

    Coven-Harness: Claude Code / claude-opus-5-5

  13. BunsDev commented on Oct 18, 2026

    @BunsDev
    ContributorAuthor

    CF-2 reconciliation is ready for a separate merge decision at signed head 71d905a08fd11dc9251f4cf6ab064c0ec9df7372. Current main is 844ae04fdc3d9f2e986b55690f3fabea33aa05c3, included by this head. GitHub verifies the signature, reports mergeability clean, and all 12 check runs succeeded. No submitted reviews or inline review comments are outstanding in the REST results.

    Exact-head CI 39145074213 checked out 951fa940376a527314cda1d27f0ba420cc4ddd9a, the merge of this head into that current main:

    • Build passed; units 1,721 passed, 16 existing skips, zero failures (109 worktree, 16 core, 1,549 desktop, 21 native/update, 10 site, 16 Store).
    • Desktop E2E 338 passed, one opt-in live skip, 16.9 minutes. Claude lifecycle, all four fidelity cases, theme coverage and both transcript measurement cases passed.
    • Site E2E 7 passed. Coverage upload passed.
    • Companion native tests and 43 iPhone UI tests passed with zero failures, on the same checkout.
    • Windows/Linux CLI and installer checks, CodeQL and all analysis checks passed.

    The owner integrated both repairs (#291 deletion ownership after failure-before-Stop; #298 evidence-fixture race/independence). The subsequent main integrations are present. I inspected #301's runner change: it compares settled items against the single stored parse; CF-2's Stop/drain/withdrawal code is unchanged. Its new migration and end-to-end coverage passed above.

    Evidence limits remain explicit:

    • Real Claude 2.1.302/Haiku acceptance through Modex passed pending-approval Stop, running-tool Stop with termination and no output file, same-thread resume, and streaming Stop. These are the earlier repaired-build receipts in docs/reviews/2026-10-18-claude-lifecycle.md, not a new live run on 71d905a. The latest integration's runner-load/CSS changes are covered by current scripted tests; they were not re-proven with a live provider in this session.
    • Native withdrawal outside Stop, unkillable-process ownership and Windows/Linux escalation retain their documented fixture/platform limits; installer checks are not live native escalation evidence. Companion withdrawn-card wording and PID reuse remain documented limits.
    • The two local full unit failures on the prior tree equivalent to 2154349 remain recorded in the preceding comment (demo timeout, Knowledge cleanup/rejection, Notes subprocess timeout). Isolated demo/Knowledge passed 14/14; host load was 258, but contention was not proven as the sole cause. Current CI passes those tests; it does not erase the local failures or the earlier Store/coverage failures in the lifecycle receipt.

    Next executable step: the maintainer makes the separate merge decision for #286 at this exact head. This session has not merged or released anything, changed policy defaults, or modified the owner's worktree. CF-3 remains gated on #286 actually landing; after that, reconcile the existing #293 and its ownership before resuming CF-3 work.

  14. BunsDev commented on Oct 18, 2026

    @BunsDev
    ContributorAuthor

    Landed: #286 is on main as 6db081890bc0aea5d074e1e78ccd10f4df732944; its Knowledge CI repair #305 is now on main as verified signed squash 7ec5f1407e00a46954fd81a62d1ecb3ddadece6f. The repair's landed tree exactly matches tested head c9100834c0e5ffd0789223c6ca06c622bebe907b.

    Verification on the repair:

    • pnpm build, pnpm typecheck, and the full local unit command passed.
    • Required macOS CI: 1,726 unit tests passed, 16 existing skips; Electron/browser E2E 338 passed, 1 opt-in live skip; site E2E 7 passed.
    • Windows/Linux installer checks, static analysis and coverage upload passed.
    • Fresh real Claude Code 2.1.302 / Haiku through Modex: pending-card Stop 860 ms; running-command Stop 2,359 ms, interrupted with no output file; same-thread resume returned resumed; streaming Stop 1,043 ms with 374 characters retained. Zero failures. The machine receipt is committed at docs/reviews/2026-10-18-claude-lifecycle/landing-live-app-run.json.

    The optional iPhone run was still in progress at merge and is not claimed green. This repair changes only the Knowledge test fixture and docs; its application code is identical to #286's head 80d35df, where iPhone CI passed. Live Windows/Linux escalation and native withdrawal outside Stop remain the explicit evidence limits in the receipt.

    CF-2 is landed. The next executable goal is CF-3 reconciliation in #293, starting with the separately reproduced acceptance/delivery race. No CF-3 production changes or merge were made here.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

bug

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions