Skip to content

docs: complete phase 1 extraction and consumer delivery - #41

Merged
BunsDev merged 1 commit into
mainfrom
docs/phase1-consumer-proof
Sep 23, 2026
Merged

BunsDev merged 1 commit into
mainfrom
docs/phase1-consumer-proof

Conversation

@BunsDev

@BunsDev BunsDev commented Sep 23, 2026

Copy link
Copy Markdown
Contributor

What changed

Closes #1. Records the completed phase 1 extraction and the playground consumer merged in typesafe-playground #45. Updates the README, architecture, roadmap and fixture guidance, with a delivery record linking the exact harness source pin, tested consumer head, squash merge and verification runs.

Transport, credentials, authorization and execution remain host responsibilities. Production conformance and calibration remain separate work.

Verdict impact

None. Documentation only; no contract, question, fixture, dependency or runtime changes.

Verification

  • pnpm typecheck
  • pnpm test — 198 passed
  • pnpm check:secrets and git diff --check
  • Commits are signed
  • No provider call, credential, execution path, or new verdict added
  • Decision table and question wording: unchanged

The consumer delivery record links the exact-head hosted runs, including 373 browser tests passed and 16 skipped. The merged consumer tree matches that tested head.

Copilot AI lite review requested due to automatic review settings September 23, 2026 07:39
@vercel

vercel Bot commented Sep 23, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
jev-harness Ready Ready Preview Sep 23, 2026 7:39am UTC

Request Review

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Copilot review overview

🟢 Approval recommended

Documentation-only changes have no unresolved blocking issues.

Review effort: Lite
Findings: None

What changed in this PR

This documentation-only PR records Phase 1 completion and the pinned playground consumer delivery.

Changes:

  • Adds consumer delivery and verification evidence.
  • Updates README, architecture, and roadmap documentation.
  • Removes the obsolete Phase 1 qualifier from fixture guidance.
File Description
README.md Updates consumer and project status.
docs/​verification/​phase1-consumer-2026-09-23.json Records delivery pins and verification results.
docs/​roadmap.md Marks Phase 1 complete.
docs/​architecture.md Documents the vendored consumer boundary.
AGENTS.md Updates fixture guidance.

💡 Add a code-review agent skill or configure MCP servers for context-aware, tailored reviews. Learn more in the docs.

@BunsDev
BunsDev merged commit 8367ffc into main Sep 23, 2026
4 checks passed
@BunsDev
BunsDev deleted the docs/phase1-consumer-proof branch September 23, 2026 07:41
CompleteDotTech pushed a commit to romgenie-following-repos/jev-harness that referenced this pull request Sep 28, 2026
Match the canonical playground Zod 4.6.5 dependency after upstream PR TypeSafeAI#41 merged. No verdict changes. Verified frozen install, typecheck, tests, build, secret scans and resolved review feedback.
BunsDev added a commit that referenced this pull request Oct 11, 2026
…62)

Adds docs/verification/phase1-rediff-408ebb5-2026-10-05.json. It is an
offline mock check of the #33 merge against playground 408ebb5, which has
the same tree as merge 6fe5967. Results: 20/20 fixture blobs, 80/80
runs with equal validation, verdict, reason and receipt, and 33/33 wire
bodies structurally equal. It also records one undocumented cosmetic
difference: validateReviewPayload serializes model before state, so
bodies are not byte-identical. The roadmap now links the record.

Docs only. No verdict, question, threshold, or fixture changes.

Co-authored-by: Claude Opus 5.5 <[email protected]>

This branch was successfully deployed

1 active deployment
Preview — 7ab8853a Deployed Sep 23, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Phase 1: extract validator, review payload, mock transport, fixtures, and bench from the playground

2 participants