Skip to content

sync: upstream v6.3.0 → fork release 6.3.1-local.1 - #2

Merged
TheStevenMiller merged 0 commit into
mainfrom
sync/v6.3.0
Aug 22, 2026
Merged

TheStevenMiller merged 0 commit into
mainfrom
sync/v6.3.0

Conversation

@TheStevenMiller

Copy link
Copy Markdown
Owner

⚠ Promotion protocol — do NOT use the merge button

Promotion is scripts/promote-sync.sh v6.3.0, run by the maintainer from a checkout of this candidate (origin/sync/v6.3.0). The copy of the script on main predates this candidate's promotion gates and the scoped hook bypass on the promotion push, so it must not be the one that runs. No merge mode can express "replace main with the candidate" (see the script header).

Candidate

9b2d388 — upstream v6.3.0 plus exactly the 13 (local) commits (deviation-list iron rule intact; publication commits dropped per the replay rules). Rebuilt 2026-08-22 from baa4c65 with the adversarial-review fixes amended into their owning commits (git diff baa4c65 9b2d388 = the 4 gate files, +45/−13).

d9e61a0 feat(local): patch #1 — Fable review routing (reviewer pins + two-axis injection)
f60b5f4 feat(local): patch #2a — SDD implementer dispatch-swap to GPT-5.6 Sol (codex exec adapter)
dc2a5ed feat(local): patch #2b — implementer prompt lean (within-stage) + vendored-skill pointers
adfe0d0 feat(local): patch #3 — vendored Matt Pocock coding skills (reference files + design-time pointers)
d4266a4 feat(local): upstream sync automation (PR-based promotion) + local update hop
7070d16 fix(local): harden patch #2 adapter against .git-writability spillover
1c94e22 feat(local): vendor resolving-merge-conflicts skill (patch #3 extension)
692ba79 fix(local): resolve SDD adapter from plugin root, not target repo
f4a2c0d fix(local): update hop prefers the native claude CLI
706bd50 feat(local): bounded retry in the update hop
3079bd2 fix(local): patch #2 riders — group kill, anchored parse, guarded preflight
4a8750a feat(local): patch #5 — TDD codex lane (Fable tests, Sol implements)
9b2d388 fix(local): session-model routing — drop the Fable hardcodes

Review application (why the candidate was rebuilt)

All 13 findings + 3 addenda of the 2026-08-22 Codex adversarial review (verdict NOT READY — 2 Critical / 10 Important / 1 Minor) are applied or deferred per their own recommendations:

  • promote-sync.sh: a missing declared test is a hard failure (C7); stack-touched shell-lint gate with an empty-list hard-fail, range derived from the upstream tag (C5/F8/C8); clean-tree refusal immediately before the release cut so git add -A can only stage bump-version's writes (C9); promotion push carries a scoped git -c core.hooksPath=/dev/null + --force-with-lease — the publication commit and its push stay hook-checked (A2/F2).
  • Intent checks: all 11 inert ! grep negatives converted to the fail-closed grep … && exit 1 form; hazard headers added to patch-1/-4 (C0).

Verification on 9b2d388 (all green)

Gate Result
Replay onto v6.3.0 13/13 clean, zero conflicts
Intent checks 5/5 PASS clean; 7/7 planted forbidden patterns CAUGHT; 3/3 re-PASS after revert
Deterministic tests 4/4 PASS
claude plugin validate PASS
tests/version-bump (new in v6.3.0) PASS — requires yq (4.53.6 installed; standing release-cut dependency)
Shell lint, stack-touched list 12 files, exit 0
New promote-sync blocks 7/7 verbatim-span probes (empty-list guard fires; missing-test hard error; dirty-tree refusal + clean fall-through; push line: fresh lease moves main, stale lease rejected)
Live e2e vs real GPT-5.6 Sol status: DONE, adapter exit 0, base 43dbd12 → sole commit 0caf2c0, trailer Agent: implementer (GPT 5.6 Sol)

Fork release on promotion: 6.3.1-local.1. The weekly sync Action is disabled until close-out so it cannot force-refresh this ref mid-flight; re-enable and close #1 after delivery verification (Task 8).

Full provenance: CODEX_ADVERSARIAL_REVIEW_M10_SYNC_PLAN_2026-08-22.md + Module_10_Upstream_v6.3.0_Sync_Plan.md (maintainer's local research repo).

🤖 Generated with Claude Code

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

sync blocked: v6.3.0 vs [local] stack

1 participant