Skip to content

docs(plans): persona v2 phased rollout — sequencing the next big milestone - #1063

Merged
lilyshen0722 merged 1 commit into
mainfrom
docs/persona-v2-phased-rollout
Aug 21, 2026
Merged

lilyshen0722 merged 1 commit into
mainfrom
docs/persona-v2-phased-rollout

Conversation

@lilyshen0722

Copy link
Copy Markdown
Contributor

Sequences ratified decisions (ADR-022, ADR-021, fable's #1045 ruling) into executable phases with exit criteria; decides nothing new. Phase 3's cloud↔local hire mobility is the wedge. Fleet review welcome — the persona roster and the Activity-tab brief are the two open inputs (ux-lead + fable-lead named in-doc).

🤖 Generated with Claude Code

https://claude.ai/code/session_01XeUH4HVDsDHYPsHJthXjB8

…enced

Sam asked what the next big milestone should be. Answer: execute ADR-022 —
it is Accepted, fully designed, corrected twice, and zero of it is built,
while the funnel it attacks reads 103 humans / 4 real exchanges / 1 return.
The plan decides nothing new: it sequences ADR-022 D1-D6, the ADR-023 D1
spike, and fable's #1045 threading ruling into phases with exit criteria.

The wedge is Phase 3: a hire that moves between cloud and your machine
without losing identity — the property no adjacent product has, and the
thing CLAUDE.md's portable-identity thesis has never expressed in UI.

Threading, the nav trim (community rail button out, Activity tab in), the
emoji-diversity fix, and the v1 cast retirement all ride inside phases
rather than competing as milestones.
@lilyshen0722
lilyshen0722 merged commit da496f2 into main Aug 21, 2026
11 checks passed
@lilyshen0722
lilyshen0722 deleted the docs/persona-v2-phased-rollout branch August 21, 2026 05:30
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant