Repository navigation
audit(governance): closed-issue workload audit (#1310) - #1401
Conversation
|
Warning Rate limit exceeded
You’ve run out of usage credits. Purchase more in the billing tab. ⌛ How to resolve this issue?After the wait time has elapsed, a review can be triggered using the We recommend that you space out your commits to avoid hitting the rate limit. 🚦 How do rate limits work?CodeRabbit enforces hourly rate limits for each developer per organization. Our paid plans have higher rate limits than the trial, open-source and free plans. In all cases, we re-allow further reviews after a brief timeout. Please see our FAQ for further information. ℹ️ Review info⚙️ Run configurationConfiguration used: Path: .coderabbit.yaml Review profile: ASSERTIVE Plan: Pro Run ID: 📒 Files selected for processing (1)
✨ Finishing Touches🧪 Generate unit tests (beta)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
There was a problem hiding this comment.
💡 Codex Review
Here are some automated review suggestions for this pull request.
Reviewed commit: 31d90edd41
ℹ️ About Codex in GitHub
Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you
- Open a pull request for review
- Mark a draft as ready
- Comment "@codex review".
If Codex has suggestions, it will comment; otherwise it will react with 👍.
Codex can also answer questions or update the PR. Try commenting "@codex address that feedback".
|
Historical Codex triage: evidence checked at 5ebcfe5. This records that source revision; it does not claim a fresh review of current master.
Only the rows listed above are dispositioned. Held findings remain open. |
Summary
Commits the 2026-05-19 closed-issue workload audit (Ref #1310) under
docs/audits/. The audit covers ~110 closures between 2026-05-01 and2026-05-18 and flags 6 cases that violate close-discipline: 3 PARTIAL, 2
ABANDONED, and 1 ORPHANED-FOLD. The remaining ~95 closures verified clean.
Problem
#1310 asked for a governance audit to surface closed issues whose acceptance
criteria were not actually delivered (closed-without-PR, partial PR, or
PR-merged-but-AC-not-met). Without a durable artifact, the audit findings live
only in chat and the issue body and cannot be referenced from future
remediation issues.
Solution
Adds
docs/audits/2026-05-19-closed-issue-workload-audit.mdcontaining thefull finding tables (PARTIAL / ABANDONED / ORPHANED-FOLD), the
not-triggered-but-verified notes, the method used, and a recommendation
summary. The audit does not itself reopen or file successor issues; it leaves
remediation to repo owners. New
docs/audits/directory is established.Flagged issues:
Verification
devtools render-pages— site rebuild succeeds (pre-existing site staleness, unrelated to this PR).githooks/pre-push(devtools verify --quick) — green: ruff format, ruff check, mypy, render-all, all verify-* lints