Skip to content

epic: continue substrate and surface renewal after readiness cleanup #270

Closed
0 of 1 issue completed
Closed

Description

@Sinity

Context

The readiness/artifact-graph cleanup finishes one important semantic rename, but the broader renewal program is still only partially complete. The repo is fully type-checked and much cleaner than it was before the mypy campaign, yet the oldest path-dependent layers still carry weaker contracts, open payload plumbing, and duplicated surface glue.

The remaining work should be driven as a sequence of large, coherent PRs rather than ad hoc cleanup.

Goal

Track the next renewal program across the remaining substrate and surface layers:

  1. schemas + sources + ingestion boundaries
  2. storage + lib + product runtime boundaries
  3. CLI/MCP/UI surface contraction over the renewed substrate
  4. test/devtools/verification renewal

Tranches

Success criteria

  • Each tranche lands through its own issue and PR.
  • Source-focused tranches keep tests mostly to fallout/contract coverage rather than mixing major source and test churn together.
  • Remaining weak-contract areas (Any, object, casts, duplicated dict-shaped payload flow) are reduced in the targeted slices.
  • Verification remains green at each PR boundary.

Notes

This issue is the umbrella tracker only. Execution should happen through linked child issues.

Sub-issues

Sub-issues

0 of 1 Issues completed
Loading 1 sub-issues

Activity

  1. added
    type:refactor
    type:tracking
    on Apr 20, 2026
  2. Sinity commented on Apr 21, 2026

    @Sinity
    OwnerAuthor

    Architecture routing update:

    Route remaining architecture concerns through those issues instead of preserving a parallel plan here.

  3. added
    area:core
    on Apr 22, 2026
  4. 4 remaining items

  5. Sinity commented on Apr 22, 2026

    @Sinity
    OwnerAuthor

    Closing #270 as complete.

    Umbrella tranche status:

    Verification evidence for the final two tranches is recorded on #273/#274 and in their PR bodies. Remaining concerns called out in the earlier routing note, including authored scenario/showcase renewal (#317), stale-file auditing (#315), and regression-capture/budget follow-through (#196), are independent follow-up tracks rather than blockers for this renewal umbrella.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area:coretype:refactortype:tracking

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions