Skip to content

API v2 Phase 7: post-cutover cleanup #887

Open

Description

@Quick104

Part of the API v2 program epic #135. Durable architecture: docs/architecture/api-contract.md (PR #880).

Scope (program Phase 7 — post-cutover cleanup): remove bridge-only v1 server code and migration-only v1 captures after cutover evidence is archived; delete obsolete handwritten web v1 types; delete the historical migration chain from the tree (it lives on in the bridge tag), the legacy schema_versions bootstrap, and the SQLite userdb provider + frozen schema; rewrite the AGENTS.md migration gotchas for the new chain; review metrics/support/semantic-diff ergonomics after the first additive v2 change; close #135 only after follow-ups are complete or explicitly re-homed.

AI disclosure: drafted by Claude Code (claude-fable-5) orchestrating the #135 program.

Activity

  1. added
    api-v2
    on Sep 1, 2026
  2. added
    triaged
    and removed
    triaged
    on Sep 20, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    api-v2

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions