Skip to content

API v2 Phase 5: bridge release #885

Closed as not planned
Closed as not planned

Description

@Quick104

Part of the API v2 program epic #135. Durable architecture: docs/architecture/api-contract.md (PR #880).

Scope (program Phase 5 — bridge release): the one published pre-1.0 release carrying the complete legacy native surface and the release-candidate v2 surface together; bundled web on v2 only; v2 advertised via discovery with the canonical contract digest; v1 unchanged except critical fixes + usage metrics; final schema-cleanup migrations land before the bridge freeze (bridge is the last release with the full historical migration chain, Go data migrations, and one-way SQLite→Postgres userdb import — the mandatory 1.0 upgrade waypoint); v2-only Apple/Android builds published; full compatibility matrix exercised on real devices.

Release execution (publishing builds, store coordination, live deployments) is maintainer-driven; this issue prepares code, runbooks, and evidence.

Exit criteria: per the plan's bridge exit criteria and docs/update-to-1.0.md.

AI disclosure: drafted by Claude Code (claude-fable-5) orchestrating the #135 program.

Activity

  1. added
    api-v2
    on Sep 1, 2026
  2. added
    triaged
    and removed
    triaged
    on Sep 20, 2026
  3. blurbery commented on Nov 19, 2026

    @blurbery
    Contributor

    Closing as not planned. The bridge release this phase describes was never published and isn't going to be:

    There's nothing left for a bridge release to carry.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    api-v2

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions