Repository navigation
SHIP-89 Small sprint fixes: edit sprint dates, sprint naming, public holidays, capacity in days - #33
Merged
Merged
Conversation
…ints, copy fix Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…ry default name Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
Settings > Sprints gets a Sprint naming dropdown through the draft model. The New sprint rail and the New project form ask the server for the name that fits the typed dates while the name is untouched. The empty backlog no longer names the sprint. Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…; journey reads sprint names Co-Authored-By: Claude Opus 5.5 <[email protected]>
…nd copy Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…re, recompute, MCP status Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…ases Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…or holidays change Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…ut fix Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…holiday country case Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…s after a failure, clamps its wait and tracks project countries
… continues past a failing project
…nd date edit, Number only Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…ound as the server's decimal does Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…uilds no Date objects Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…uched value, points-only sprints keep their stored figures, ended rows say default, velocity reason and labelling, no false No-capacity callout Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…e project Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…d name is stale; New sprint hint follows the naming convention Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…he name and returns focus; opening the goal editor closes the rail Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…, not its stored points Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…and new project changes Co-Authored-By: Claude Opus 5.5 <[email protected]>
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Co-Authored-By: Claude Opus 5.5 <[email protected]>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
SHIP-89 Small sprint fixes: edit a sprint's dates after creation, a project sprint naming convention (year/quarter/number by default for new projects), public holidays by country, and capacity in days with a velocity share, plus the Capacity tab's layout. Plan, the numbered defaults and per-task reports are on SHIP-89 and its tasks (SHIP-230..245) in ShipLean.
What changed
SprintFormwith New sprint and sends only changed fields. An ended sprint's dates are locked ("An ended sprint's dates can't change."); its name and goal still change. A sprint can't be moved to end in the past.project.sprint_naming(yearQuarterNumber|number, column defaultnumber). New projects get2026 Q4 Sprint 3(calendar quarter of the start date,1 + floor((start − quarterStart) / length)); existing projects, the seed and Jira-imported projects stay on Number only. It applies to the New sprint rail (the suggestion follows the typed dates viasprints/next?start=&end=), the first sprint of a new project, MCPcreate_sprintand the forecast's future sprints. Settings › Sprints has a Sprint naming select; changing it renames nothing.holiday_country/public_holidaytables, filled by a hosted job from Nager.Date (national holidays only) for countries a project uses: on start, then daily, retried after 30 minutes on a failure; an empty feed keeps the stored data.SHIPLEAN_HOLIDAYS_API_URL(empty = off; documented in the README).GET api/holidays/countries. Settings › General has a Public holidays country select (None by default).velocity / N × days / W, rounded half away from zero, capped 9999.99, where W counts working weekdays with holidays kept.capacity_pointsis still stored, so forecast, planning lines, rollover, KPIs, All sprints and the MCP tools are unchanged. The server recomputes stored points for running sprints with a velocity when a sprint's dates, the project's working days or country, or the holidays change; ended and old points-only sprints are never touched. MCPsprint_statusadds velocity, working days and per-member days.Journeys/Planning/SprintNamingAndCapacityJourneyTests; site docs in ShipLean/docs (separate PR).Deploy notes
202610291000..1300). Nullable columns and defaults keep an old server working on the new schema.date.nager.atfrom the server; setSHIPLEAN_HOLIDAYS_API_URL=to turn it off.Review
One review pass, split into server and client. Server: 1 major (a Jira import re-run reset the naming) and minors (empty feed wiped holidays, no quick retry, tracking failure gave a 500, holiday recompute stopped at the first failing project, end moved into the past, case-sensitive name checks, sprint_status days on points-only sprints), all fixed. Client: 2 majors (float rounding differed from the server at half cents; dates formatted with
Intlin the SPA, now a server label) and minors (Days input couldn't be cleared, stale suggested name on a quick Create, velocity clash/dirty state, points-only sprints, realtime refresh breadth, focus management, goal editor vs rail), all fixed.Left as is: a copied project's first-sprint suggestion uses Year/quarter even when the source is Number only;
days numeric(4,1)only overflows for sprints over ~1,000 working days; the settings "changed" check reads outside the transaction (tiny race, only skips a recompute).Verification (local)
--verifyof all 100 shots, 3 repeats each, 300 passed.Lanes.Sprints,Lanes.Settings,Journeys.Planning,Journeys.Navigationon a fresh client build, 54 passed (incl. the new journey after its placeholder fix).format:checkflags onlyTasksSection.tsx, which is already unformatted on main.After merge: on prod SHIP, edit a sprint's dates, set Australia, check the Capacity tab, and comment the result on SHIP-89.
🤖 Generated with Claude Code