Repository navigation
Conversation
…ptance
The Adoption convention said sequenced execution "belongs in a tracking
issue" but never said where. QEP-2's tracker landed in meta and QEP-5's
checklist in this repository; neither has anywhere to put an audit, a
design or the evidence a decision is made on. A new subsection, Adoption
and rollout, says: a QEP whose Adoption section obligates other
repositories gets a project-qep{N} repository at acceptance (QEP-3's
project-* type: private, goal-scoped), whose first issue is the tracker;
otherwise an issue here. Rollouts that predate the rule stay put. First
applied by QEP-5 (project-qep5). template.md and AGENTS.md follow.
Assisted-by: Claude Code (Claude Fable 5.1)
Co-Authored-By: Claude Fable 5.1 <[email protected]>
Assisted-by: Claude Code (Claude Fable 5.1) Co-Authored-By: Claude Fable 5.1 <[email protected]>
There was a problem hiding this comment.
🟡 Changes recommended
A few newly added process instructions have avoidable ambiguity/wording issues that should be tightened before merging since they define normative workflow.
Get a fresh assessment by requesting another Copilot review.
Pull request overview
This PR amends QEP-1 from v3 to v4 to codify where cross-repository rollout execution should live after a QEP is accepted, establishing a per-QEP project-qep{N} repository convention for rollouts that obligate other repositories.
Changes:
- Add a new “Adoption and rollout” subsection to QEP-1 defining when/where to create a
project-qep{N}rollout repository and how tracker/work items should be organized. - Update QEP-1 metadata/versioning to v4 (dropping
version-hashfor CI restamping). - Update contributor guidance in
AGENTS.mdand the QEP template to reflect the new rollout-tracker location rule.
File summaries
| File | Description |
|---|---|
| qeps/qep-0001-purpose-and-process.md | Introduces the new “Adoption and rollout” rule and records the v4 changelog entry. |
| qeps/template.md | Updates the Adoption boilerplate to point authors to the tracker opened at acceptance (including the project-qep{N} rule). |
| AGENTS.md | Extends “Accepting a QEP” checklist to include creating/registering the rollout tracker home when obligations span repos. |
Review details
- Files reviewed: 3/3 changed files
- Comments generated: 4
- Review effort level: Lite
💡 Add a code-review agent skill or configure MCP servers for context-aware, tailored reviews. Learn more in the docs.
…nces Assisted-by: Claude Code (Claude Fable 5.1) Co-Authored-By: Claude Fable 5.1 <[email protected]>
…n clause and the issue-type step The test is now "adoption requires sequenced work in other repositories", so a QEP whose obligations elsewhere are single edits (QEP-1 itself) tracks in an issue here; Adoption item 5 says so. The pre-rule migration sentence leaves the Proposal — it described an instance, and item 5 already records it — replaced by a one-line statement of scope. "The projects registry" is anchored to QEP-3's status-* type, and Alternatives records the cost of a private tracker to contributors in public repositories. AGENTS.md drops the "native Project type" step, which no QEP defines, and the template says "tracker issue". Co-Authored-By: Claude Fable 5.1 <[email protected]> Claude-Session: https://claude.ai/code/session_01HvzxXpPxtt27ofi8Z5pMSR
"Its first issue is the tracker" made the number look like part of the rule. The tracker is the sub-issue parent in the project repository, whatever number it happens to carry; AGENTS.md and the template follow. Co-Authored-By: Claude Fable 5.1 <[email protected]> Claude-Session: https://claude.ai/code/session_01HvzxXpPxtt27ofi8Z5pMSR
|
Note from QuantEcon/cli, 2026-11-15, for the AGENTS.md step this PR adds. When the QEP-2 and QEP-3 items moved out of QuantEcon/meta on 2026-09-14, GitHub rewrote every bare Since this PR makes such a move routine ("transferred from agent: organiser mini:cli session_01WT8bMbBosEhpWejJ9oqpAX, posting for the lead (@mmcky) on approval, 2026-11-15 |
|
@mmcky this pull request is ready for you to close in favour of #45, following the ruling of 2026-11-17. The ruling. QEP-1 says where a rollout is tracked in one sentence, and does not mandate a repository per QEP: sequenced execution lives in a tracker issue opened at acceptance, never in the QEP; where it lives is its owner's choice. Why. A rollout's tracker is an issue, its evidence goes under What #45 carries instead: the one-sentence rollout rule, the writing principles for QEPs, and the fidelity test that gates simplifying an accepted QEP. It is a fresh branch from Generated by Claude Code |
|
Closing unmerged in favour of #45, following the ruling of 2026-11-17 recorded above. |
Substantive amendment to QEP-1 (v3 → v4); needs an approving review from a Core Maintainer other than the author.
The gap. The Adoption convention (v2) says sequenced execution "belongs in a tracking issue" and stops there. QEP-2's rollout tracker went to
meta(QuantEcon/project-qep2#1) and QEP-5's checklist opened here (#33); neither had anywhere to put a document, and QEP-5's rollout arrived with an audit, a deferred design, and a decision to be made on a month of evidence.The rule. A new subsection, Adoption and rollout: a QEP whose adoption requires sequenced work in repositories other than this one gets a
project-qep{N}repository at acceptance — QEP-3'sproject-*type, private, goal-scoped, no production code — created by whoever merges the acceptance PR. The tracker is an issue there, known by its role as the sub-issue parent rather than by any number; coordination issues, research and the decision register live there too; work items land in the repository where the work happens and hang off the tracker as sub-issues; the tracker is registered in the organization's projects registry (astatus-*dashboard under QEP-3); the repository is archived when the tracker closes. A QEP whose obligations fall only on this repository, that carries none, or whose obligations elsewhere are single edits with nothing to sequence tracks in an issue here or needs no tracker. The rule applies to every accepted QEP, not only those accepted after it.Why per QEP, not per programme. Recorded under Alternatives considered: the documents a rollout accumulates belong to that QEP's goal and end with it; a standing
project-governancewould become a secondmetawith nothing to close, and this repository is the standard, not its execution. The same entry records the cost of a private tracker: a contributor in a public repository sees a work item parented to an issue they cannot open, and the work item carries everything they need.Instances. Three repositories exist under the rule as of today: QuantEcon/project-qep5 (new; tracker QuantEcon/project-qep5#1, eleven sub-issues across five repositories), QuantEcon/project-qep2 (the QEP-2 tracker and its eleven sub-issues transferred from meta, old URLs redirecting; tracker QuantEcon/project-qep2#1), and QuantEcon/project-qep3 (its execution items gathered from meta; tracker QuantEcon/project-qep3#1). The migration is recorded in Adoption item 5, not in the Proposal, since it is an instance rather than a rule. QEP-1 itself falls under the issue-here rule: each of its adoption items is a single edit landed by the PR that records it. The registry rows are one PR in status-projects.
Also in this round.
template.md's Adoption blurb names the tracker home; AGENTS.md's Accepting a QEP gains the step.version: 4in the frontmatter and header table;version-hashdropped for CI to restamp, as v3 did. The QEP checks pass locally.Assisted-by: Claude Code (Claude Fable 5.1)
🤖 Generated with Claude Code
https://claude.ai/code/session_01HvzxXpPxtt27ofi8Z5pMSR