QEP-6: Project Tracker Structure and Order (Draft) - #18

Closed
quantecon-services wants to merge 26 commits into
mainfrom
claude/github-issues-task-ordering-9uj7wa
Closed

quantecon-services wants to merge 26 commits into
mainfrom
claude/github-issues-task-ordering-9uj7wa

Conversation

@quantecon-services

@quantecon-services quantecon-services commented Aug 26, 2026 •

Copy link
Copy Markdown
Collaborator

Adds QEP-6: Project Tracker Structure and Order, the spec for the org's unit of project tracking, from the discussion on #15.

What it decides

  • The unit. A project is one tracker issue typed with the native Project issue type. Its work items are its direct native sub-issues, and progress counts direct children only. Body checkboxes are never work items, and a tracker with no sub-issues is unmeasured, not 0%. A project's children are leaf work items and decisions; a tracker whose children are project trackers is outside this QEP and is not typed Project.
  • Issue types carry structural role. There are three: Project, Task and Decision, each with its own meaning of "closed". Content stays on QEP-2's labels (a bug is Task plus the bug label, never a Bug type).
  • Order is positional. The sub-issue list is the plan: the top open item is next, completed items keep their place, and phases stay contiguous. Re-ordering moves items and never renames them; sequence never appears in titles or milestone names.
  • Constraints are dependencies. A real constraint is a native blocked-by edge, and the test for one is output, not order. A phase-level gate is carried as a conjunction onto the first item of the waiting phase, a decision gate as edges to the Decision, and a whole-project gate as a tracker-to-tracker edge. The reverse direction is read, never written.
  • Phases are milestones (optional), with descriptive names only.
  • One machine-read body element: the status stamp, ## Where we stand (verified YYYY-MM-DD). It asserts that the section beneath it was checked on that date, and that section states where the project stands now, never how it got there. It may open with a single Next: line; where the line and the list disagree, the list is the authority.
  • The body never mirrors structure: no rosters, checkbox work lists, milestone→issue tables, hand-written progress, dependency prose, numbered kick-off orders, or phase status in the phase table. Appendix A gives an informative skeleton.
  • Scope. The layer above a project, and the working practice around trackers (genres, ledgers, succession), are outside this QEP. GitHub.com only.

Review

Field-tested in Draft since 2026-08-26; the field reports and the amendments they produced are recorded on this thread. Under QEP-1 v3 it is accepted by an approving review from a Core Maintainer other than the author, with no objection outstanding. QEP-7 (#40) builds on this QEP and lands after it.

Closes #15, the discussion this QEP came out of (ruled 2026-09-14 to stay open until QEP-6 merges).

Closes #11, the QEP-2 field report that the Project type answers.

Assisted-by: Claude Code (Claude Fable 5, Claude Fable 5.1, Claude Opus 5, Claude Opus 5.5)

🤖 Generated with Claude Code

Adds QEP-6 as a Draft: the project-tracking unit (one tracker issue,
Project issue type, native sub-issues one level down), positional order
with plan semantics, dependencies for real constraints, descriptive
phase milestones, the fixed status stamp, and the body's no-mirror
discipline with a single Next: resume line. Adds the README index row
(standard / Draft / –).

Discussion: #15

Co-Authored-By: Claude Fable 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_013WNYd4EW71564zVcW81yx7
Folds in the twelve amendments consolidated on the field report thread
(see #19) plus two edits from its producer-tooling finding:

- Scope the standard to GitHub.com (s7)
- Ban purely numeric milestone names, verified live (s4)
- Membership criterion: closing a work item advances the definition of
  done; unparented issues and unparented trackers are normal (s1)
- Direct children homogeneous in kind; progress is a snapshot, not a
  time series (s1)
- Dropped items leave the sub-issue list - percent_completed counts
  not_planned closures as completed (s2)
- Gates: mostly phase-level in practice; a whole-project gate also
  carries the tracker-to-tracker dependency edge (verified live on a
  throwaway pair); stated once, in the project that waits (s3)
- Parked-ness is derived from open blockers, never carried (s3)
- Stamp refresh is a read-modify-write with a lossless read; sanitising
  surfaces get append-only treatment (s5)
- Named replacements for the body bans; Related work section (s6)
- Markdown template plus post-creation type read-back (Adoption 1)
- Re-parenting guard on the conform tooling (Adoption 2)
- QEP-6 authoritative over the dashboard contract during handover
  (Adoption 3)
- Drop "untyped = untriaged" as a load-bearing justification (s1)

Co-Authored-By: Claude Fable 5 <[email protected]>
@mmcky

mmcky commented Aug 27, 2026

Copy link
Copy Markdown
Contributor

Applied the field-test amendment set from #19 (the consolidated 12-amendment checklist in its final comment), plus the two edits from its producer-tooling finding, in commit 1a0f063. The four review calls landed as:

Gates (amendment 10 §1) — the softened, granularity-first form: most cross-project gates are phase-level and stay in the body; a whole-project gate carries the tracker-to-tracker dependency edge, stated once in the body of the project that waits. The edge mechanism is now verified live rather than inferred (see the closing results on #20): an edge between two sub-issue-carrying tracker issues is accepted, reads back on REST blockedBy and GraphQL blockedBy/blocking, and the UI timeline records it — so the whole-project case keeps must.

Stamp concurrency (amendment 7) — the read half is specified as read-from-a-source-returning-surface (the REST endpoint returns raw markdown) rather than an unactionable byte-for-byte round-trip check; where only a sanitising surface is available the body is append-only and corrections go to comments.

"untyped = untriaged" — dropped from §1 as a load-bearing justification for type-over-label; the Motivation's audit observation stands as an observation.

Related work — bound relaxed to: entries name projects, never work items, but item numbers may appear as the specifics of a project-level relationship.

Also in: amendment 2 upgraded from source-derived to executed (gh issue list --milestone "2026" fails with no milestone found with number '2026' while a descriptive name resolves fine), the §6 named-replacements paragraph, and the Adoption-3 sentence making this QEP authoritative over the dashboard's tracker contract wherever they disagree during the handover gap.

Per process: Draft and unmerged, so no version field; both check scripts pass.

…s on labels

Types carry structural role (Project / Task / Decision, each with its own
meaning of "closed"); QEP-2 labels carry content, and the axes compose.
Adoption gains the one-time reversible reshape of the org type set
(Bug/Feature disabled, Task re-described, Decision created).

Co-Authored-By: Claude Fable 5 <[email protected]>
@mmcky

mmcky commented Aug 28, 2026

Copy link
Copy Markdown
Contributor

e61b1da adds §2 Issue types, settling the type/label question from the tracker discussion: native issue types carry structural role (what kind of object an issue is in the tracking system), QEP-2 labels carry content at triage, and the axes compose — a work item whose content is a bug is Task + bug, never a Bug type.

The set is three roles, each admitted by having its own meaning of "closed": Project (definition of done met), Task (work shipped), Decision (choice recorded). Decision composes with §4's dependency mechanics so "parked on a decision" is derivable, and the §4 gate-as-decision sentence now names the type. Hierarchy level is never encoded in type — a programme tracker is still a Project.

Adoption gains a one-time org-level precondition: reshape the type set via four reversible API calls — Bug/Feature disabled, not deleted (assignments stay latent; one call undoes it), Task re-described, Decision created — so it ships at field-test start rather than acceptance. Alternatives records the rejection of content-classifying types. Sections 2–7 renumbered to 3–8; both check scripts pass.

… not a tier

Records the outcome of the #24 discussion in one scope sentence: the
grammar has two normative tiers and no third; a programme is a named
collection of projects maintained by the projects registry.

Co-Authored-By: Claude Fable 5 <[email protected]>
@mmcky

mmcky commented Sep 2, 2026

Copy link
Copy Markdown
Contributor

Finding 9 follow-up — the class-3 producer now conforms (2026-09-02)

Closing the loop on qeps#19's finding 9, which read qe/skills/workplan-project against this draft and found it mandating a body element §7 forbids and never mentioning order.

The six findings it filed (QuantEcon/skills#69–#74) are done: merged as QuantEcon/skills#76, released as qe 0.10.0 and tagged qe--v0.10.0 at 7ebf8a5. One commit per finding, so the PR reads against the findings. What the skill now does, in this draft's terms: the tracker body carries a Phase | Intent | Exit criterion table and never a roster (§7); the tracking issue is written once, with no backfill edit; draft file order is plan order, sub-issues are linked in that order with the native verb and the read-back asserts list order (§3); a recovered item on a re-run is placed with the reprioritise API rather than appended; every pre-existing issue's parent is read before linking, with the detachment named in the approval draft (Adoption clause 2); a membership gate applies §1's criterion before drafting, with the goal-widening diagnostic as the working tool; the exemplar is cited for content only, with Appendix A as the shape; and split packages carry Related work and Gates.

Two things this draft's Adoption section did that mattered in practice. Clause 3's precedence sentence is what the skill cites where C2 and this QEP disagree — the skill names the disagreement (a body roster is C2-conformant, QEP-6-forbidden) and points at the clause rather than resolving it, which is exactly the one-sentence fix finding 9 asked for. And clause 2's read-before-link obligation was verified in the gh source before being written into the skill: in cli/cli v2.98.0, --add-sub-issue and --parent both call AddSubIssue with replaceParent true, unconditionally (api/queries_issue.go), while the raw REST POST …/sub_issues omits the flag and fails on a parented child. The skill now uses one method with one guard.

One re-verification note for the record: QuantEcon.py#925's stamp heading, which finding 9 called stamp-unreadable, was fixed upstream on 2026-08-31 and now parses; its plan table still carries Issue and Status columns, so it remains cited for content rather than shape.

The link-and-reprioritise path was exercised once by hand the same day, placing the six closed findings into QuantEcon/skills#63 in plan order after an existing item; REST, GraphQL and the rendered page agreed on the result. The same body was brought to §7 by hand — roster table out, phase table and Gates in — which is the first tracker in that repo conformed to this draft's body rules. The sibling finding on /qe:workplan (no tracker-genre body spec, no home for the Next: line) is QuantEcon/skills#68 and is now a phase-1 item of the same tracker.

The evaluation gate finding 9 named still stands: until QuantEcon/status-projects#19 ships, the dashboard re-sorts children by issue number, so the ordering half of this draft is observable only on GitHub itself.


Generated by Claude Code

@mmcky

mmcky commented Sep 8, 2026

Copy link
Copy Markdown
Contributor

Field report — two trackers written to the draft, 2026-09-07 and 2026-09-08

Two project trackers were written to QEP-6 as drafted by the org's own producers on consecutive days: QuantEcon/status-projects#69 (eleven items, three phases, one item closed) and QuantEcon/status-projects#89 (nine items, three phases), with a declared dependency between them. Both carry the Project type, native sub-issues in plan order, one stamp, a phase table with intents and exit criteria, gates stated once, a Related work section, and no roster — the unit rules held without strain. The five findings below are each a place where a careful producer read the draft one way and the draft meant the other; the evidence is on the two trackers and the review that read them (docs/reviews/2026-09-08-focus-and-overview-design.md in status-projects, a private repository).

1. When the phase gate is a Decision, §2 and §4 point different ways — and both producers chose §4. Each tracker's Decide phase is a single Decision-typed issue, and each body states "nothing in Build starts before Decide closes" as prose. §2 says work that cannot start before a choice is blocked-by the decision; §4 says a phase-level gate is stated in the body because no object represents a phase. Here an object does. GraphQL shows zero blockedBy edges on all twenty items (nineteen of them open). Proposed sentence for §4's gate paragraph: A phase whose exit criterion is a Decision closing is a decision gate, not a phase gate: the object exists, so each item that waits carries the native edge to it, and the body states only why. Cost of conformance on these two trackers: nineteen edges, one command each.

2. An item-level constraint across projects was read as body material. #89 states three constraints on items in #69 (its collector item waits on #69's registry and collector items; its Overview item waits on #69's Focus item) with the sentence "That ordering is an edge between items in two different projects, so it is stated here rather than implied." §4 says the reverse — item constraints are native and may cross project boundaries — but its gate paragraph discusses "cross-project gates" at phase and project level only, which is where the reading came from. Proposed sentence after "an edge may cross project boundaries": An item-level constraint is a native edge on the two items whether or not they share a project; only phase-level and whole-project gates are stated in the body. A second, smaller miss: §7 gives the waited-on project a home for pointing back (gated by), and #69 has no such line — the gate was written by the waiting project alone, which is the case §4 describes and the case in which the other project is least likely to notice.

3. Decision children and §1's homogeneity rule. §1 asks that direct children be homogeneous — all leaf work items or all project trackers — and §2 introduces Decision, which in practice sits beside both: 2 of 11 and 2 of 9 children on these two trackers are decisions, and the Themes programme tracker (QuantEcon/workspace-themes#1) carries seven decisions beside four project trackers, where every completion so far is a decided decision and no project has finished. Proposed clarification: Decision children are compatible with either kind; a Decision closed completed counts toward progress like any child (a recorded choice advances done); and a consumer may render decisions apart — which the dashboard's programme contract (C8, proposed) does, as counts.

4. The phase table is an undated claim outside the stamp, and it went stale within a day. #69's list moved from nine items to eleven on 2026-09-07 with a revision comment, adding a new surface and a new contract; the body's phase intents and Build exit criterion, verified that morning, still describe the nine. §6 dates the stamp section and §7 places the phase table outside it. Adoption clause 3 could oblige the qe skills to refresh the stamp section in the same turn as any change to the list. On the consumer side, §1's progress is never compared across a membership change now has an implementation: the dashboard's denominator-changed note (QuantEcon/status-projects#46) says so on the row.

5. The ordering evidence window has a smaller sample than the clause implies. Adoption clause 4 is done — the collector publishes list order since 2026-09-07 (QuantEcon/status-projects#19) — but 19 of the 41 registered trackers are in private repositories and publish children as counts only, so list order is observable on the 14 public trackers that have sub-issues (the collection of 2026-09-08 03:55 UTC). Both trackers in this report are private and contribute nothing to the ordering half of the evidence. The late-September comment window should state its sample.

Nothing here changes the draft's shape. The two amendments are one sentence each in §4; the third is a clarification across §1 and §2; the last two are observations for the evaluation.


Postscript, the same day. The review was ruled on within the hour and both trackers were brought to the §2 and §4 form: #70 and #90 now block every Build item natively, #72 and #92 the site items, the three cross-project item constraints are edges, and one item carries an edge to the decision outside both projects — twenty-one edges, one gh issue edit --add-blocked-by each, none visible to the dashboard (its contract reads blockedBy on the tracker only) and all of them visible on the items as GitHub's own blocked by. The counts above are as at review: two items also moved from #69 to #89 under the §1 test, so the lists now read nine and eleven. One tooling note for Adoption clause 2: adding two sub-issues to a parent in a single gh issue edit --add-sub-issue call failed on the second with GitHub's Priority has already been taken, and succeeded one per call.

Copy link
Copy Markdown
Collaborator Author

Second field report — a degree census over four trackers, and one amendment to FR-2

A review of all four dashboard projects (QuantEcon/status-projects#1, #69, #89, #23 — the 2026-09-08 report read two of them) read issue_dependencies_summary on all 45 direct children. Three findings bear on the draft, and one of them corrects the earlier report.

1. The graph does not close, and no written count of it has been correct

Σblocked_by = 32 and Σblocking = 34 over the 45 children, with at least one inbound edge from outside the set (QuantEcon/actions#163 → #107). So at least three edges leave these four projects for issues no inventory names — and one of them starts at a closed item (#35, blocking: 2, in #1's list).

The counts written on 2026-09-08 were 21 (this PR's postscript), 21 (docs/roadmaps/2026-09-08-focus-and-overview.md) and 22 (2026-09-08-dashboard-projects.md, written 33 minutes later); a careful reconstruction the same day resolved 33; this census says that reconstruction is still short. #89's own stamp enumerates the native edges and omits two live ones (#72→#67, #67→#97).

Nothing in the draft is wrong about this. It is offered as the strongest available evidence for Adoption clause 4's direction of travel: any consumer that publishes an edge count should compute it, and any producer that writes one by hand will be wrong within the day.

2. FR-2's back-pointer half should be struck rather than strengthened

§4 puts the gate in the waiting project's body once and asks the other project to point back via a §7 gated by line; the earlier report found that line missing on #69 and proposed reinforcing the obligation.

GitHub already holds the inverse. Verified live: #73 reports blocking: 1 while #94 reports blocked_by: 3. The reciprocal is not something a producer needs to write — it is the other end of the same edge, readable in both directions.

And there is no producer to write it. The complete mutating-call table of /qe:workplan-project is gh issue create, gh issue edit --add-sub-issue, PATCH …/sub_issues/priority, gh issue edit --type Project; /qe:workplan writes bodies, comments and closes; /qe:workplan-roadmap "never edits an issue". No skill writes a dependency edge at all, which is why all 33-plus edges on these trackers were made by hand after a review.

An obligation with zero producers and a free platform inverse is one that will be missed every time. Proposed: drop the back-pointer duty from §4, and say instead that the reverse direction is read, never written. §7's gated by line stays available as prose for a human reader; it just stops being an obligation the standard relies on.

3. §4's phase-gate clause should name the conjunction

The clause that sends phase-level gates to the body is what produced six uncarried orderings on these trackers (#73→#74, #74→#75/#76, #94→#95/#96/#97, #82→#84, #91→#92, #71→#72 — asserted in item bodies, carried by nothing).

The platform already supports the honest carrier, and the alternatives were checked rather than assumed:

  • A tracker-to-tracker edge over-parks. §4 says it "asserts that nothing in the blocked project may start", and #89's Decide phase runs today — so it would be false.
  • A single tail edge under-carries. Verified: of #69's five Build items, #76 and #77 both report blocking: 0, and #73/#74/#75 report blocking: 1 each. There is no chain between them, so closing the tail implies nothing about the rest.
  • A conjunction carries it exactly. blockedBy is many-to-many: the first item of the waiting phase is blocked by every item of the phase it waits on. That publishes a real number (k of n upstream items still open), clears the night the phase closes rather than the night the tracker closes, and needs no object anyone must remember to close.

Proposed sentence for §4: A phase-level gate is carried as a conjunction — the first item of the waiting phase is blocked by every item of the phase it waits on — so the gate clears when the phase closes rather than when the tracker closes; the body states only why.

Appendix A must change in the same commit. Its Gates: line restates the current rule verbatim ("phase-level gates live here; a whole-project gate also carries a tracker-to-tracker dependency edge"), and Appendix A is the text producers copy.

A related finding on §1, offered as an observation

§1's homogeneity rule is falsified as a partition claim by this repository's own flagship project. #70 fans out to {#73, #74, #75, #76, #77} and #72 to {#75, #76, #67} — the two overlap on #75 and #76. So "a phase is the fan-out of its gate" cannot be assumed, and §5's accepted limit that "phases must partition the work" holds only for milestones — which can never be a dependency endpoint. Anything built on fan-out-as-phase is already untrue here.

Four editorial items, all free while the window is unopened

  1. The Adoption clauses are numbered 1., 2., 2., 3., 4. in source. Markdown renumbers on render, so every external "clause N" citation after the first is off by one: "clause 2" (read-before-link) renders as 3, "clause 3" (qe skills precedence) as 4, "clause 4" (dashboard child order) as 5. QEP-6 field report: building a conformant tracker from an existing issue set #19, the qe skills and this PR's own comments all cite the source numbers.
  2. mergeable_state is dirty on a one-line add/add conflict in the README index against QEP-3's row — this branch predates QEP-3's merge and both insert after QEP-2's. It must resolve keeping both rows: check.mjs:82-85 errors with "README index has no row for QEP-N" for any qeps/*.md lacking one.
  3. No related: frontmatter and no Related header row, though check.mjs:107-141 enforces that pairing and this QEP composes with QEP-2 (§2's type/label axis) and governs status-projects' C2 contract. See Process: downstream QEPs carry their amendments to upstream standards (QEP-1 amendment, deferred to second instance) #9 for the wider question.
  4. §8's scope sentence stops being true when C8 ships. "No producer or consumer reads programme membership as structure" — QuantEcon/status-projects#82 proposes exactly that read. Amend it, or accept that the standard is wrong the day the dashboard ships.

Also, and separate from the text: this PR has no decision deadline, which QEP-1 step 3 requires in the PR description. That is deliberate here (the window awaits the collector's first month), but it is one of four open QEP PRs with no live deadline — filed as #26.

Full evidence, including the census method and the seven corrections it produced, is in docs/reviews/2026-09-08-cross-project-dependencies.md in QuantEcon/status-projects (a private repository).


Generated by Claude Code

quantecon-services pushed a commit that referenced this pull request Sep 8, 2026
…tream amendments

Folds three ruled changes into this amendment and drops one it originally
proposed, so v3 lands as one coherent round instead of a v3 that a v4 would
immediately partly delete. Ruled 2026-09-08; discussion on #26, #9 and #22.

DROPPED FROM THIS AMENDMENT: the one-week default comment window. The ruling
went further than shortening it.

THE DECISION DEADLINE GOES. Step 3 of "How a QEP is decided" is struck and the
acceptance trigger becomes "no objection is outstanding" rather than a date —
lazy consensus with no clock, so a QEP nobody objects to still lands without
needing the lead, and nothing is accepted by the mere passage of time. Roles,
the Summary's "clear deadline" promise, and the README's Proposing steps all
follow.

The evidence is recorded under Alternatives considered: on 2026-09-08 none of
the four open QEP pull requests had a live deadline — #8 had never set one in
47 days, #13's and #23's had passed, #18's was deliberately deferred — while
nothing in CI ever read a PR description. The field was required by this
document and checked by nothing. Enforcing it in CI was considered and
declined: it would have turned three open PRs red for a rule they predated.

THE README INDEX IS GENERATED, post-merge from frontmatter and ordered by
number, so a PR carries no row of its own and two QEP PRs cannot collide on one
line of one table. The mechanism shipped ahead of this amendment in #30,
together with the ordered-list check; Automation now names both, and a stale
index is a warning rather than a failure. Numbering states what already
happened informally: a number is reserved when its draft PR opens, released if
that PR closes unmerged, so index gaps are normal while drafts are open.

A DOWNSTREAM QEP CARRIES ITS UPSTREAM AMENDMENTS — #9's sentence, widened by
the case it did not anticipate. Where the superseded standard is not itself a
QEP, the Adoption section must name the contract, the obligation and a date by
which the handover completes: QEP-6 asserts precedence over an external tracker
contract with no date on it, and the qe skills depend on that sentence at
runtime. Closes #9.

Also brings the branch up to date with main, which had moved on by QEP-3's
merge (this branch predated it, so it carried neither the file nor its index
row).

Verified green under both the pre-#30 checks on this branch and #30's new ones,
including the ordered-list rule over the rewritten Adoption entry.

Co-Authored-By: Claude Opus 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01Hwm5shrGXmaq4r3Lp9kS33
…tion 1-5

The Draft repairs ruled on 2026-09-08, from the two field reports on this PR
and a review of all four dashboard projects. The comment window has not opened
and there are no reviews on this PR, so every edit here is a free Draft edit:
no version, no window reset.

SECTION 4, THE PHASE GATE. The clause that sent phase-level gates to the body
"because no object represents a phase" is what produced six uncarried
orderings across two conformant trackers. The dependency graph is
many-to-many, which is enough: the first item of the waiting phase is blocked
by every item of the phase it waits on. Linear in the upstream phase rather
than a cross-product, it publishes how many upstream items are still open, and
it clears when the PHASE closes rather than when the upstream tracker closes.

The alternatives were checked against the live graph rather than reasoned
about. A tracker-to-tracker edge over-parks: section 4 says it asserts nothing
in the blocked project may start, and status-projects#89's Decide phase is
being worked now. A single tail edge under-carries: of #69's five Build items,
#76 and #77 both report blocking 0 and the five have no chain between them, so
closing the tail implies nothing about the rest.

SECTION 4, THE ITEM EDGE. Made explicit that an item-level constraint is a
native edge whether or not the two items share a project (FR-2's first half) —
a producer read the gate paragraph's "cross-project" as covering item edges and
wrote three of them as prose.

SECTION 4, THE DECISION GATE. Where a phase's exit criterion is a single
Decision closing, the gate is a decision gate: the object exists, so each item
that waits carries the edge to it (FR-1). Both producers read section 2 and
section 4 as pointing different ways here and both chose the body.

SECTION 4, THE BACK-POINTER IS STRUCK. Blocked-by and blocking are two ends of
one edge — verified live, #73 reports blocking 1 while #94 reports blocked_by 3
— so the waited-on project needs no back-pointer to stay in step. No qe skill
writes a dependency edge at all, so the obligation had zero producers and a
free platform inverse: it will be missed every time, and was. A Related work
line stays available prose in section 7, not an obligation.

SECTION 1. Decision children are compatible with either homogeneous kind, a
closed-completed Decision counts toward progress like any child, and a
consumer may render decisions apart (FR-3). Two of eleven and two of nine
children on the reviewed trackers are decisions, and the Themes programme
tracker carries seven beside four project trackers.

SECTION 8. "No producer or consumer reads programme membership as structure"
stops being true the day the dashboard's programme read ships, so it now
separates the producer duty from a consumer's observation: observing a front
door creates no duty on any tracker and no third tier.

APPENDIX A. Its Gates line restated both struck rules verbatim, and it is the
text producers copy — so it changes in the same commit, as the field report
asked.

ADOPTION IS RENUMBERED 1-5. The source read 1., 2., 2., 3., 4.; Markdown
renumbers on render, so the published document showed 1-5 while every external
"clause N" citation after the first was off by one. Clause 4 also gains FR-4's
obligation: re-stamp the section in the same turn as any change to the list,
because the phase table is an undated claim outside the one section whose
contract is that its claims are re-verified on update, and it went stale within
a day of a re-plan.

FRONTMATTER gains related: [2] with the matching header-table row, which
check.mjs has always enforced as a pair and which this QEP — the one that
reasons most explicitly about another — did not carry.

THE README INDEX ROW IS REMOVED rather than merged. This branch predated
QEP-3's merge and both inserted a row after QEP-2's, which is what made the PR
unmergeable. Under the generated-index rule the row is derived from
frontmatter, so stripping it returns README to its base content and the merge
with main is clean. Note the consequence: until #30 lands, this branch's own
check.mjs still requires a row per QEP file, so CI here is red until then.
That ordering is deliberate.

Co-Authored-By: Claude Opus 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01Hwm5shrGXmaq4r3Lp9kS33

Copy link
Copy Markdown
Collaborator Author

Draft repairs pushed — 0907a70

Ruled 2026-09-08, from the two field reports on this PR plus a review of all four dashboard projects. The comment window has not opened and there are no reviews here, so every edit is a free Draft edit: no version, no window reset.

§4 — the phase gate is a conjunction

The clause that sent phase-level gates to the body "because no object represents a phase" is what produced six uncarried orderings across two otherwise-conformant trackers. blockedBy is many-to-many, which is enough: the first item of the waiting phase is blocked by every item of the phase it waits on. Linear in the upstream phase rather than a cross-product; publishes how many upstream items are still open; and it clears when the phase closes rather than when the upstream tracker closes.

The alternatives were checked against the live graph, not reasoned about:

Alternative Why it fails
Tracker-to-tracker edge §4 itself: it asserts nothing in the blocked project may start. status-projects#89's Decide phase is being worked now, so it would be false
Single tail edge Of #69's five Build items, #76 and #77 both report blocking: 0 and the five have no chain between them — closing the tail implies nothing about the rest
A new gate object Fails on cost, and on §1: a gate is not a work item, so it distorts the progress denominator

§4 — three more changes

  • The item edge is explicit. An item-level constraint is a native edge whether or not the two items share a project (FR-2's first half). A producer read the gate paragraph's "cross-project" as covering item edges and wrote three of them as prose.
  • The decision gate. Where a phase's exit criterion is a single Decision closing, the gate is a decision gate — the object exists, so each waiting item carries the edge to it (FR-1). Both producers read §2 and §4 as pointing different ways and both chose the body.
  • The back-pointer obligation is struck. Blocked-by and blocking are two ends of one edge — verified live, #73 reports blocking: 1 while #94 reports blocked_by: 3 — so the waited-on project needs nothing to stay in step. And no qe skill writes a dependency edge at all, so the obligation had zero producers and a free platform inverse. §7's gated by line stays available prose rather than an obligation the standard leans on.

§1, §8 and Appendix A

  • §1 — Decision children are compatible with either homogeneous kind; a closed-completed Decision counts toward progress like any child; a consumer may render decisions apart (FR-3).
  • §8 — "No producer or consumer reads programme membership as structure" stops being true the day the dashboard's programme read ships, so it now separates the producer duty from a consumer's observation: observing a front door creates no duty on any tracker and no third tier.
  • Appendix A — its Gates: line restated both struck rules verbatim, and it is the text producers copy, so it changes in the same commit as the field report asked.

Editorial

  • Adoption is renumbered 1–5. The source read 1., 2., 2., 3., 4.; Markdown renumbers on render, so the page showed 1–5 while every external "clause N" citation after the first was off by one. Clause 4 also gains FR-4's obligation: re-stamp the section in the same turn as any change to the list.
  • related: [2] and the matching header-table row. check.mjs has always enforced these as a pair, and this QEP — the one that reasons most explicitly about another — carried neither.

The README conflict is gone, and how

mergeable_state was dirty on one line: this branch predated QEP-3's merge and both inserted a row after QEP-2's. The row is removed rather than merged. Under the generated-index rule (#30) it is derived from frontmatter, so stripping it returns README to its base content and the merge with main is clean — which it now is; main is merged in and QEP-3 arrives with it.

One deliberate consequence: until #30 lands, this branch's own check.mjs still requires a row per QEP file, so CI here is red with README index has no row for QEP-6. That is the expected ordering, not a defect — #30 first.

Verified

Check Result
This branch's pre-#30 check.mjs fails on the missing index row — expected, see above
#30's check.mjs passes, with the stale-index warning
#30's ordered-list rule passes — it previously reported line 364 against line 349, which is the Adoption defect this commit fixes
check-labels.mjs passes

FR-5 is deliberately not in the document: the ordering-evidence sample belongs in the comment window's own statement, not in the standard. It is recorded in my earlier field report above.


Generated by Claude Code

claude and others added 2 commits September 8, 2026 11:39
…; Adoption 4 names its discharging item

Three repairs from the adversarial review of the 2026-09-08 rulings.

§4 states the test that decides whether an ordering is an edge at all:
output, not order. An edge is written where the downstream item cannot
start without something the upstream produces; two items that touch the
same file or will be worked in sequence are plan order, and stay with the
body's sequencing rationale. The same test decides what a gate is — a
phase-level gate is a real constraint by definition, a phase-level
preference is not a gate. The case study that prompted it: #89's "Build
waits on #69's Build" was coordination written as a gate, and the
conjunction was about to carry it. Appendix A's Gates line follows.

§8 no longer says a consumer "may observe" a programme's front door —
that is QuantEcon/status-projects#10's open question and this QEP has no
business answering it. The scope keeps what is its own: no programme tier
in the grammar, no duty on a tracker from being listed.

Adoption clause 4 names the item that discharges the tracker-contract
handover, QuantEcon/status-projects#114, in place of an open-ended "until
that contract's planned handover" — the form QEP-1 v3 requires for a
precedence clause over an external standard.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
Claude-Session: https://claude.ai/code/session_01Hwm5shrGXmaq4r3Lp9kS33
QEPs are the source of truth and are independent of every repository: a
downstream consumer adapts to a QEP, and the QEP owes it nothing back.
The dashboard's tracker contract is a consumer that must conform, not a
peer standard this QEP supersedes — so Adoption item 4 no longer asserts
precedence over it, no longer prescribes its handover, and no longer
names a tracking issue in another repository. How each consumer reaches
conformance, and when, is that consumer's own business.

Also drops the citation of QEP-1's cross-standard amendment rule, which
was withdrawn from the v3 amendment in #23; the reasoning
is recorded on #9.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
@mmcky

mmcky commented Sep 8, 2026

Copy link
Copy Markdown
Contributor

Adoption item 4: the precedence clause over the dashboard's tracker contract is removed

Pushed in b9f31a1, following the ruling of 2026-09-09 on #23 (reasoning recorded on #9): a QEP is the source of truth and is independent of every repository. A downstream consumer adapts to a QEP; the QEP owes it nothing back.

Under that model docs/contracts/tracker.md is not a peer standard this QEP supersedes — it is a consumer that must conform. So item 4 no longer asserts that this QEP is "authoritative for tracker structure wherever the two disagree", no longer prescribes the shape of that contract's handover, and no longer names QuantEcon/status-projects#114 as the item discharging the obligation. What remains is the plain statement that the skills conform to this QEP, and that how each consumer reaches conformance, and on what schedule, is that consumer's own business.

The citation of QEP-1's cross-standard amendment rule goes with it — that rule was withdrawn from the v3 amendment in #23, so it will not exist to cite. It was the only reference to QEP-1 in this document.

Ownership is now recorded from the other side, in the repo that holds the contract: QuantEcon/status-projects#140. QuantEcon/status-projects#114 stays open there as that repo's own work.

Unrelated and pre-existing: qep-checks fails on this branch with "README index has no row for QEP-6" — identical at 3673475, before this push. That is the add/add collision #30 removes by generating the index from frontmatter.

@mmcky
mmcky marked this pull request as ready for review September 14, 2026 00:03
Copilot AI lite review requested due to automatic review settings September 14, 2026 00:03

Copilot AI left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🟡 Changes recommended

The new QEP text contains a few documented convention/formatting issues (notably section-number citations and a malformed Related row / inline token markup) that should be corrected before merge.

Get a fresh assessment by requesting another Copilot review.

Pull request overview

This PR adds a new draft proposal, QEP-6: Project Tracker Structure and Order, defining a normative structure for GitHub project tracker issues (issue types, sub-issues as work items, list-position ordering, dependencies as constraints, optional milestones as phases, and a single machine-readable “status stamp”).

Changes:

  • Introduces QEP-6 as a new Draft QEP under qeps/, including motivation, proposal sections, adoption obligations, and an appendix body skeleton.
  • Specifies positional ordering semantics for sub-issues (plan order) and formalizes constraints as native dependency edges.
  • Defines a single machine-readable body element (the “Where we stand (verified YYYY-MM-DD)” stamp) and limits other body content to human-readable rationale/context.
File summaries
File Description
qeps/qep-0006-project-trackers.md Adds new Draft QEP-6 defining project-tracker structure, ordering, constraints, stamping, and adoption guidance.
Review details

Suppressed comments (2)

qeps/qep-0006-project-trackers.md:98

  • This uses a section-number reference ("§2"). AGENTS.md recommends citing headings instead of section numbers to avoid renumbering drift; please update this and the other "§N" references in the document to heading-based references.
the percentage meaningless. **`Decision` children (§2) are compatible with
either kind**: a decision is a point in the plan rather than a unit of work,

qeps/qep-0006-project-trackers.md:469

  • Appendix A references "§4"; per AGENTS.md, cite section headings rather than numbers to avoid renumbering drift (especially since this appendix is meant to be copied into trackers).
whole-project gate as a tracker-to-tracker edge — see §4; an ordering with no
  • Files reviewed: 1/1 changed files
  • Comments generated: 2
  • Review effort level: Lite

💡 Add a code-review agent skill or configure MCP servers for context-aware, tailored reviews. Learn more in the docs.

Comment thread qeps/qep-0006-project-trackers.md Resolved
Comment thread qeps/qep-0006-project-trackers.md Resolved
@mmcky

mmcky commented Sep 21, 2026

Copy link
Copy Markdown
Contributor

Field report — a programme tracker filed against the draft, 2026-09-21

One session on the reporting programme, read against head f9d9d50: an agent on the qe workplan skills, with the owner present, filed a programme tracker with six project-tracker children (QuantEcon/project-reporting#12, private), registered it as its programme's front door, and read three registered trackers whose compliance findings nobody has been able to clear by hand. Four findings and one stale clause.

1. Issue types and the ruling that cites it disagree on typing a tracker of trackers. The draft: "a tracker whose children are trackers is still a Project", and The unit admits children that are "all project trackers". The settled position on #24 (2026-09-08): "A programme front door is never typed Project … against QEP-6 §1's homogeneity rule" — a rule that, as written, permits what the ruling forbids. Three front doors were untyped on that ruling and today's was filed untyped because of it; a producer holding only this document would have typed it. Scope's "two normative tiers … and no third" likewise forecloses the Programme type that #24 now says QEP-7 "may introduce". Offered: limit The unit's children to work items and Decisions; state that a tracker whose children are project trackers is outside this QEP and is never typed Project; have Scope say the programme layer is not defined here.

2. Leaf housekeeping on a tracker of trackers has no conformant home. Today's tracker carries ten housekeeping items as body checkboxes, five open. The body bans checkbox work lists in favour of sub-issues; The unit wants children of one kind, so a leaf task cannot sit beside six project trackers. Both rules are right, and together they leave the work nowhere to go but the construct this QEP retires. Out of scope here, but it is the first thing a programme-level spec will be asked.

3. The status stamp is missing three rules the field needed.

  • Nothing else inside the parentheses. QuantEcon/status-projects#69 and #89 — reported on this thread on 2026-09-08 as conformant — are today the dashboard's only two stamp-unreadable rows, for (verified 2026-09-08; amended 2026-09-10). The consumer's grammar has the rule; the draft does not.
  • An optional time and zone. The draft's one fixed form is a bare date. The consumer accepts HH:MM TZ, the skills recommend it when sessions run close together, and it is in live use (verified 2026-09-21 09:32 AEST on today's tracker; 12:05 AEST on QuantEcon/status-projects#1 since 2026-08-24). Adoption 4's lint would flag both.
  • Whose date. A reviewing agent read same-day 2026-09-21 stamps as future-dated, because it was 23:20 UTC on the 20th. Offered: the date is the writer's local calendar date.

4. The draft says what a stamp looks like, not what it asserts. Three registered trackers carry the Project type (one at 8 of 12 sub-issues) over bodies that are still the charter they were created with. The hygiene pass of 2026-09-15 (QuantEcon/status-projects#112, private) refused to stamp them by hand, because a heading dated to the last body edit "would claim a check nobody made". That is right, and nothing here licenses it: a producer reading The status stamp alone would add the heading and clear the finding. Offered, one sentence: a stamp asserts that the section beneath it was checked on that date, and is never placed over a body with no status content.

5. Stale, in Adoption. Clause 1 says the type reshape ships at the start of the field test; measured today, Bug and Feature are still enabled and Task still reads "A specific piece of work" — only Decision has been created. Clause 3 names QuantEcon/skills#49 as the conform tooling; it was closed as not planned when split, and the fix half is QuantEcon/skills#67, still unbuilt, which is why finding 4's trackers remain a hand pass.

What held. Reading a child's parent before linking (clause 3): six checked, none parented, and the failure it prevents is silent. Unmeasured is not 0%: a specification registered today with no sub-issues publishes null, not an empty bar. Read-modify-write in one turn held across eight body rewrites, with one note for producers: GitHub returns a trailing newline the write did not send, so a lost-update guard must compare modulo trailing whitespace or it false-alarms.

This report cites sections by heading, as AGENTS.md asks; the rulings that lean on this draft cite "QEP-6 §1", and the file cites itself by number twelve times.


Written by Claude (Claude Code) in a working session with @mmcky, at his request; posted from his account.

Copy link
Copy Markdown
Collaborator Author

Field report — readability of trackers written to the draft, and four amendments (2026-09-21)

Eleven registered trackers written under this draft were measured live on 2026-09-21 (the full review is filed in the projects vault, QuantEcon/projects, private; the platform-free half of what it found is now QEP-7, #40, from #39). The unit rules held everywhere — the type, sub-issues in plan order, the stamp, a phase table, no roster. What did not hold is readability, and the draft has a hand in it. Four findings, each with a proposed sentence, offered for the current text rather than for the QEP-7 split.

1. The stamp section is being used as the revision log (§ The status stamp, § The body, Appendix A). On the four largest trackers the body runs 1,700–2,300 words and the section under the stamp is between a quarter and all of it; on the largest, eight of the ten paragraphs under the stamp are dated accounts of what happened on two days, and the issue has no comments at all. Appendix A's "Narrative of state: recent movement, in flight, blockers" is the phrase producers act on — recent movement invites a changelog, and a session ending has three places to put what it did, of which the stamp section is the only one it must touch. Proposed, in § The status stamp: the stamp section states where the project stands now and never how it got there; a dated account of what happened belongs in the revision log. And in Appendix A, "in flight, blocked, needing a person" in place of "recent movement".

2. Two mirrors the § The body table does not name came back under other names. A numbered "kick-off order" of nine work items, read by its producer as sequencing rationale, is a roster and a second statement of order; "done YYYY-MM-DD" written into phase-table cells, read as an exit criterion, is hand-written status; and one Next: line grew to 204 words. Proposed rows for the table: phase completion status or dates in the phase table → the list (a phase is done when its last item closes), or the milestone; a numbered kick-off or sequence of items → list position; sequencing rationale explains why the order, it never enumerates it. And one clause in § The body: the Next: line is one line.

3. Cross-repository phases have no carrier (§ Phases are milestones). The section accepts that cross-repo work items "fall back to the body's phase table", but the phase table carries intent and exit criterion — deliberately not membership — so on such a tracker nothing records which items belong to which phase in a form a reader or a script can use. Measured: 4 of 49 registered trackers carry any milestone; on the largest cross-repository tracker 6 of 23 children carry a Part of #N (Phase k) body marker and the rest carry nothing. Proposed: name that marker as the fallback carrier, as an informative convention in Appendix A's child skeleton, so tooling may group by it; and acknowledge that native issue fields exist (the org has Priority, Start date, Target date and Effort) — a Phase field would not serve, since field options are org-wide and phase names are per project, but the QEP should say what the fields are not used for.

4. Appendix A's order serves the resuming agent and not the reader who skims. Goal → stamp section (narrative) → Plan (phase table) puts the one table a skimmer wants under the wall. Proposed: goal → stamp section holding the one-line Next:, a short state paragraph and the phase table → gates and sequencing rationale → related work → out of scope. Placing the phase table inside the stamp section also settles the 2026-09-08 report's finding 4 structurally: the table becomes a dated claim, re-verified when the section is re-stamped, instead of an undated one outside it that Adoption clause 4 has to remember for it.

What is not proposed here. Budgets — how many words a stamp section may run, how long a Next: line may be — are the skills' numbers, and qe 0.11.0 carries them in a report-only lint beside a computed digest (run against the largest tracker above, the lint reports every finding in this comment). The QEP states the principle. Nothing here reopens the unit, positional order or the dependency test, which held without strain.


Generated by Claude Code

Copy link
Copy Markdown
Collaborator Author

Two notes for the record, 2026-09-21, beside the field report above.

1. A mechanics observation for § Adoption. From a Claude Code session — the org's main producer surface — api.github.com/graphql answers 403 with the message that GraphQL is not available from these sessions and REST is to be used. Every REST carrier this draft relies on works from the same session: the issue object's type.name, …/issues/{n}/sub_issues in position order, …/sub_issues/priority, …/issues/{n}/dependencies/blocked_by, and sub_issues_summary. What does not work is anything routed through GraphQL, which includes the read-back the draft names in clause 2, gh issue view N --json issueType, and the gh sub-issue and dependency verbs, which call GraphQL mutations. The rule the draft states — assert the type against the issue itself, never against an org enumeration — is right; the example command should be one that works on every surface, and the REST read of the issue is that. The qe skills' snapshot moved to REST for this reason (QuantEcon/skills#81).

2. What QEP-7 takes over, for the separate review. #40 states the platform-free layer and names this QEP as the GitHub binding, section by section. Nothing in this draft needs to change before it lands, and the layering test is the one to apply afterwards: a sentence that names a GitHub feature stays here; a sentence that would still be true on another platform is QEP-7's. On that test the candidates for trimming to a pointer at this QEP's first amendment are the membership criterion and the homogeneity principle in § The unit, the output, not order test in § Constraints are dependencies, the registers rationale in § The body, and the practice sentence in § Scope. Each keeps its carrier text here — sub-issue edges, blocked-by, the body's table of what it never mirrors — and cites QEP-7 for the principle. Offered as a list to rule on, not as a change to this PR.


Generated by Claude Code

mmcky and others added 3 commits September 27, 2026 20:40
…nters

Draft repairs from the review of the 2026-09-14 Copilot comments and the
2026-09-21 field reports. Free Draft edits: no version.

The unit, Issue types and Scope no longer encode the 2026-08-28 programme
ruling, which the settled position on #24 superseded on 2026-09-08. A
project's children are leaf work items (and decisions); a tracker whose
children are project trackers is outside this QEP and is not typed
`Project`. The sentence that a tracker of trackers "is still a `Project`",
and the "two normative tiers and no third" scope, are removed, so a later
QEP can define the layer above without first amending this one. The
admission test for a new type is unchanged and is what such a QEP would
meet.

References to other repositories' issues and current behaviour are
removed, as AGENTS.md asks: the status-projects question in Scope, the
closed skills tracking issue and the collector's schedule in Adoption 3,
and Adoption 4's description of which contract the skills cite. The
Adoption intro stops promising a consumer obligation that was dropped with
item 5.

Adoption 1 states the end state of the type set rather than when it ships,
and names a role description for all three types. Adoption 4's re-stamp
clause now also checks the phase table: re-stamping alone does not
re-verify a table that sits outside the stamp section.

Sections are cited by heading rather than number throughout (twelve
self-citations), and the `Next:` markup is simplified.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…rrors

Amendments from the 2026-09-21 field reports on this PR. Free Draft edits:
no version.

The status stamp gains the three rules the field needed: an optional time
and zone after the date, nothing else inside the parentheses, and the date
is the writer's local calendar date. It also says what a stamp asserts, a
check of the section beneath it on that date, so it is never placed over a
body with no status content. And the stamp section states where the
project stands now, never how it got there; a dated account is revision
history and belongs in comments.

The body's table of things it never mirrors gains two rows that came back
under other names: a numbered kick-off order of items, and phase
completion status or dates in the phase table. Appendix A follows: the
state line reads "in flight, blocked, needing a person" instead of "recent
movement", and the phase table is marked intent and exit criterion only.

Adoption 2's type read-back uses the REST issue's `type.name`, which every
producer surface can reach; the GraphQL-backed `gh issue view --json
issueType` cannot be reached from some.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…ield

Two follow-ups from ruling on the 2026-09-21 field reports. Free Draft
edits: no version.

Motivation and two Alternatives entries argued from what the projects
dashboard's contract and collector do today. Each argument holds for any
machine consumer, so each now says that instead: a naming convention is a
parse that breaks on every rename, a consumer publishing facts about
private repositories cannot publish their titles or milestone names, and a
second ordering system is one every consumer would have to read as well.

Alternatives gains a `Phase` issue field, which the readability report
raised for cross-repository phases: rejected, because a field's options
are defined once for the whole organization while phase names belong to
each project. The report's per-item `(Phase k)` body marker is not
adopted; it is a sequence token and restates the parent link.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
@mmcky

mmcky commented Sep 27, 2026

Copy link
Copy Markdown
Contributor

Rulings on the comments since 2026-09-09, applied in 9d9162f, bb2215e and f930cdd (free Draft edits, no version).

Field note, 2026-09-10. No change; the output, not order test stays.

Copilot review, 2026-09-14

  1. Related row cites §2: accepted; it now cites Issue types (9d9162f).
  2. Nested Next: markup: accepted, simplified (9d9162f).
  3. Section-number citations (suppressed comments): accepted; all twelve now cite headings (9d9162f).

Field report, 2026-09-21 (programme tracker)

  1. Typing a tracker of trackers conflicts with Discussion: a Programme QEP — codifying the grammar's top tier, and ordering projects within it #24: accepted. The unit, Issue types and Scope no longer type it Project or rule out a layer above (9d9162f).
  2. Housekeeping on a tracker of trackers: out of scope once item 1 lands; a question for the programme QEP (Discussion: a Programme QEP — codifying the grammar's top tier, and ordering projects within it #24).
  3. Stamp grammar: accepted. Optional time and zone, nothing else inside the parentheses, writer's local date (bb2215e).
  4. What a stamp asserts: accepted (bb2215e).
  5. Stale Adoption clauses: accepted by removal. No ship date in clause 1, no tracking-issue reference in clause 3 (9d9162f). The reshape itself is done as of 2026-09-27: Project, Task and Decision carry role descriptions, Bug and Feature are disabled, and the 7 open issues that carried them are retyped Task with their content on QEP-2 labels.

Field report, 2026-09-21 (readability)

  1. Stamp section used as a revision log: accepted. It states where the project stands now, never how it got there; Appendix A follows (bb2215e).
  2. Two mirrors the table doesn't name: accepted as two table rows. The Next: line is already limited to one line (bb2215e).
  3. Phase marker for cross-repo work: declined. (Phase k) is a sequence token and Part of #N restates the parent link; Phases are milestones accepts this limit. Alternatives now records why a Phase issue field is not used either (f930cdd).
  4. Phase table inside the stamp section: declined, because the plan is not state. Instead, Adoption 4 now checks the phase table on every change to the list (9d9162f).

Notes, 2026-09-21

  1. REST read-back: accepted (bb2215e).
  2. What QEP-7 takes over: no change here. Those trims belong in QEP-7: Project Management Protocols (Draft) #40 as Amendments to QEP-6.

Also removed, per AGENTS.md: the remaining references to other repositories' issues and current behaviour, in Scope and Adoption 3–4 (9d9162f), and Motivation's and Alternatives' descriptions of the dashboard's rules, now stated as principles that hold for any consumer (f930cdd).

claude added 12 commits October 28, 2026 00:30
Rewrites the draft as the binding of QEP-7's protocol, as ruled by @mmcky
on 2026-10-28 after a review of twelve registered trackers and the
2026-09-28 review of all 38.

The unit: one grain of leaves or phases beside Decisions; an upkeep tracker
per repository with ongoing work; a tracker of trackers is a programme.
Issue types: Programme and Phase join the set; only a leaf Task closes by
reference; a Decision is opened only for a choice that blocks work beyond a
session, and its first line carries the ruling. Planning fields (new): an
accountable assignee and five fields, visible to all; a Target date on
Active finite projects, reported on and never enforced. Order: next, in
flight and pending decisions are derived, and no body states them.
Constraints: a gate is one edge between the issues constrained, with one
clause of rationale removed with its edge; the conjunction mechanism goes.
Phases are Phase issues; milestones group releases. The stamp heads a status
block of Risk and Needs, rewritten whole, each change announced by one dated
comment; no status comment is pinned. The body is a charter then the block,
and the skeleton is the ceiling. New sections for programmes, work items
and comments, with a marker on agent-authored comments. Mechanics move to
the tooling; Adoption carries the org set-up and the write rules; Appendix
A holds the six skeletons that templates and the lint are generated from.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
Claude-Session: https://claude.ai/code/session_01HvzxXpCKAHdZNixzSJwrqJ
The Summary names a carrier for every concept QEP-7's binding requires.
The unit cites QEP-7's membership test instead of restating it; a closed
child of an upkeep tracker leaves the list once an update cites it. A
Decision closes when the choice is recorded or the question is moot. The
constraints section cites QEP-7's output-not-order test. The Needs line
dates a person-named ask, and one unmet at the next update becomes an
issue. Evidence lives in the pull request or a bundle outside the records
folder. Programmes carry a resume condition and a records link, and their
update comment opens with the date alone. An agent never writes a ruling
but may copy the decider's words into line one; an unattended run never
writes a tracker record. Adoption: types are disabled, never deleted;
Stage and Priority are the programme lead's; structure changes need the
owner's approval. The skeletons match the body text, and their counts go.
New Amendments to QEP-2 and QEP-5 sections carry the label and disclosure
changes the design accepted, until acceptance. The Motivation no longer
describes another repository's behaviour and its figures match the source.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
Claude-Session: https://claude.ai/code/session_01HvzxXpCKAHdZNixzSJwrqJ
…iewer

The Summary's carrier list and *Scope* name Copilot code review, requested
automatically on every pull request, as the automated reviewer that QEP-7's
*Who accepts a change* relies on; each finding is fixed or answered with a
reason before the merge.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
Claude-Session: https://claude.ai/code/session_01HvzxXpCKAHdZNixzSJwrqJ
The reviewer leaves the Summary's carrier list and stands in its own sentence,
since it is an actor, not a carrier. *Scope* names GitHub Copilot code review
as the automated reviewer in a repository that keeps a `.qe/` folder, with the
reason, and no longer restates QEP-7's rule. *Adoption* gains item 5, the
setting that requests the review on every pull request and push. *Amendments
to QEP-5* covers the reviewer as organisation-operated automation and lets an
agent answer its findings in a session the person runs.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
Claude-Session: https://claude.ai/code/session_01HvzxXpCKAHdZNixzSJwrqJ
An agent that only reviews, proposing no change of its own, is
organisation-operated automation because it raises quality and acts on
nothing; its findings may be answered by a person or by an agent in a
session the person runs, because *Own it* protects a human reviewer's
attention and a review agent spends none.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
Claude-Session: https://claude.ai/code/session_01HvzxXpCKAHdZNixzSJwrqJ
A review agent is an agent whose only output is review comments; it counts
as organisation-operated automation when it has a named maintainer and a
register entry, its bot account standing in for the `automated` label
because the label marks what automation opens. The maintainer answers for
enabling, configuring and withdrawing it. Under *A human is in the loop*
and *Own it*, the author may fix or answer a finding or have an agent do so
in a session the author runs; a reply goes under the author's account with
the disclosure line. A human reviewer's finding stays the author's to
answer. *Adoption* item 5 enters Copilot in the register first.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
Claude-Session: https://claude.ai/code/session_01HvzxXpCKAHdZNixzSJwrqJ
The Code in brief gains a sentence after the block saying review there
means a person's review. *A human is in the loop* gains two exceptions,
the second for an agent answering a review agent's finding in a session
the person runs, a declining reply being one the person approved. A review
agent posts under its own bot account with no person approving, never
submits an approving or change-requesting review, and counts as
organisation-operated automation because it acts with no person approving
each act. Its maintainer owns the agent, not its findings, and a review
agent a QEP requires is withdrawn by amending that QEP. *Disclose* covers
an agent's reply and an applied suggestion. *Own it* is second person
throughout. *Adoption* item 5 orders the register entry before the setting.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
Claude-Session: https://claude.ai/code/session_01HvzxXpCKAHdZNixzSJwrqJ
Each paragraph names its insertion point in QEP-5. The sentence after the
block says that where the Code asks you to answer review it means a
person's review. The first exception is active voice with its reason; the
second says a reply leaving a finding even partly unfixed gives its reason
and waits for approval. A run with no person present writes no tracker
record or ruling and declines no finding. A review agent's only output is
comment-only reviews, however requested; its bot account alone satisfies
disclosure; its maintainer answers for enabling and configuring it, not for
each finding, and proposes withdrawal by the tooling's measure. *Disclose*
names the form of the line. *Own it*'s clause now reads "a person's review
comments". *Adoption* item 5 creates the register entry at acceptance.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
Claude-Session: https://claude.ai/code/session_01HvzxXpCKAHdZNixzSJwrqJ
Membership and the constraint test cite QEP-7 instead of restating it;
progress counts direct work items; the upkeep tracker is the GitHub
carrier of QEP-7's plan home; a gate is a phase-level or whole-project
edge and a decision point's constraint is an edge, matching QEP-7's terms;
"run with no person present" replaces "unattended run"; the tooling's
cycle leaves Scope; the collapsible-sections alternative moves here from
QEP-7.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
Claude-Session: https://claude.ai/code/session_01HvzxXpCKAHdZNixzSJwrqJ
Five decisions and the mechanical fixes from the independent review of
the whole draft. Target date is the one carrier of every date, set from a
milestone at write for release items. A phased project's status block
carries a Next exit line, verified at each update, so the planning test
holds from the first screen. Priority's options are Now, Soon and Later.
Repositories append the QEP-5 amendment's sentence to their copy of the
Code in brief. Where Copilot has not reported, the tooling re-requests it
and, after a period it sets, the change merges on a second reader's
recommendation. The Summary is a table of concept and carrier covering
every item of QEP-7's Bindings. The skeletons are normative, render
correctly, and agree with the prose; The body, Programmes and Tasks are
cut to principle. The plan-home rule is quoted as QEP-7 states it. Next,
in flight and blocked are QEP-7's definitions mapped to carriers. The
identifier is owner/repo#N. The QEP-2 amendment names each target
sentence. Restated QEP-7 rules are citations. Unverifiable platform
claims, descriptions of other tools, and undated draft references are
removed. Three alternatives are added.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
Claude-Session: https://claude.ai/code/session_01HvzxXpCKAHdZNixzSJwrqJ

Copy link
Copy Markdown
Collaborator Author

A review of QEP-6 and QEP-7 for team discussion: GitHub planning tools: what to adopt and why

It asks what our process would look like if we made full use of GitHub's own planning tools. The short answer: keep every project fact on the tracker issue, and treat GitHub Projects boards and the status dashboard as views that hold no facts of their own.

What it suggests for this QEP:

  • a short Views section stating that rule, with an updated reason in Alternatives considered, since a board's hierarchy view now keeps sub-issue order in sync with the issue;
  • showing GitHub's own progress count rather than a second figure;
  • settling the priority words: Now, Soon, Later here, but now, next, later in the dashboard's registry;
  • trialling a pinned update comment against the status section in the description, on two or three trackers.

The report ends with a table of eight decisions for the team. If the link does not open for you, it has not been shared with you yet.


Generated by Claude Code

Copy link
Copy Markdown
Collaborator Author

Closing this draft in favour of a new QEP-6: #44, "Project Trackers and Working Records".

Why a new pull request and not an edit here. A review on 2026-11-17 audited every typed issue in the organisation and the working records of 60 repositories, and the rulings that followed replace most of this draft. A reviewer should be able to read the new document on its own; this thread stays as the record of the earlier design and its review.

What carries over to #44: a project is one tracker issue; its sub-issues are the plan, in plan order; constraints are native dependencies; sequence is never encoded in titles; what is next is derived and never written.

What does not:

  • the five planning issue fields (stage, priority and dates stay in the projects registry);
  • the Programme and Phase types (a phase is a Task with sub-issues);
  • the three-line status block and mandatory update comments (now the dated heading plus at most Risk and Needs);
  • the six skeletons (now three shapes);
  • the upkeep tracker, the automated-reviewer rule and the amendments to QEP-5.

#44 also absorbs the working-records half of the QEP-7 draft (#40), so the two documents become one.


Generated by Claude Code