Skip to content

Work plan — QuantEcon/actions: v0.17.0 shipped; next the v0 move and wave 6's gate and workers #246

Closed

Description

@mmcky

Continuing from #212 (closed as superseded on 2026-11-04). This plan comes from the maintainer's decision session of 2026-11-04 and the whole-tracker audit run the same morning. It is worked by parallel Claude Code sessions, each owning one area and one pull request at a time, with an organiser session coordinating them. Six waves have run since 2026-11-04. This body is the single source of truth for the work. Revise it in place against live state before working from it.

Where we stand (verified 2026-11-10 05:20 UTC)

What State Measured
main 0f4ee09 (#290) 05:18 UTC, git ls-remote
Latest release v0.17.0, tag on fae622c, with its GitHub Release (#289). It carries wave 5 and #274. Nothing in it is marked ⚠️ BREAKING 05:18 UTC
v0 e40924a (v0.16.0), moved 2026-11-10 02:10 UTC with the maintainer's approval. It moves to v0.17.0 once a lecture-matrix run on main passes, again with approval 05:18 UTC, git ls-remote
v0.17.0 canary All green in QuantEcon/test-actions-lecture-intro; PR 82's closing comment has the table. #270's five execution-cache checks passed. #216: the Cloudflare preview's URLs came with no fallback warning. #224: setup-latex and setup-environment's install-latex each missed, then hit with no download. The 30-minute download limit also fired for real on a stalled Ubuntu mirror. publish.yml deployed. The branches and the tag are deleted ~03:55 UTC
Lecture matrix The scheduled run of 2026-11-09 (79) failed one leg on a GitHub 504 for a lecture's data (#285). Its rerun went 8/8 green, which cleared the v0.16.0 move. Run 80 (42744092827) started after #274's first promotion, on e38afc2, still with the 180-min ceiling. Its setup-environment and build-lectures are byte-identical to v0.17.0's. Six of eight legs are green; both lecture-python.myst legs are still running. If it passes, it can clear the v0.17.0 move 05:14 UTC
Container images :latest is now promoted only after the smoke test (#274). The first promotion (run 42743671096) moved quantecon to d6d17495… and quantecon-build to d7676921…. The first live prune (#290, run 42753845919) deleted 255 and 138 old versions, leaving 78 per image 05:00 UTC
Open PRs #279 (the maintainer's CHANGELOG footer fix; theirs to merge) 05:18 UTC
Sessions The organiser, mini:actions. Wave 6's gate and workers sessions launched 2026-11-10 05:17 UTC, and are doing their issue checks. The containers session finished and closed 05:18 UTC

Front of the plan:

  1. Read run 80's result. If it passes, ask the maintainer to move v0 to v0.17.0. If a lecture-python.myst leg times out at the old 180 min, dispatch a fresh matrix run on main, which has ci(lecture-validation): report each leg's duration and warn as it nears its ceiling; lecture-python.myst gets 240 min (#141, #196) #288's 240 min, and decide on that one.
  2. Wave 6's checks, as they arrive: Release gate fixture: content and hygiene for the canary's gate.yml #136 and Release gating: a gate.yml in the canary tests the candidate before v0 moves #135 from the gate session, and Add Workers static assets support to the Cloudflare preview action #145 from the workers session. Each question goes to the maintainer one at a time, and the agreed check is posted on its issue.
  3. After v0 moves to v0.17.0: a docs PR for PLAN's release line, and on the next day, a look at the lecture sites' first runs.
  4. The lecture sites' first runs on v0.16.0, from 2026-11-11. They are the first callers to meet Escape caller-supplied values in the actions' annotations #267's refusal of a line break in a single-value input.

Wave 5 and wave 6 (2026-11-07 to 2026-11-10)

Item Outcome
#270, #160's step 2 #280: the execution cache's key hashes the environment, and the templates restore the execution cache. Closed
#216 #281: preview-cloudflare's deploy-url uses the address Cloudflare serves the project at, read from wrangler's record of the deploy. Closed
#224 #283 (a new setup-latex action) and #284 (setup-environment's install-latex on the same cache). Closed
#142 phase 2 #274: main's build pushes candidates, smoke-tests them, and promotes both images to :latest together only if every test passes. Closed, with tracker #188
#286 #287: the lecture matrix files a cancelled run only when no newer run exists. Closed
#141, #196 #288: each leg's duration in the run's summary, with warnings, and a 240-min ceiling for lecture-python.myst. Closed. The lecture's own cost is QuantEcon/lecture-python.myst#1118: imp_sample takes 39% of its CPU execution time
#277 #290: a monthly pruner for old image versions, with a pins file. Closed after the first live run
#135, #136 In progress: the gate session builds #136's fixture and then #135's gate.yml in the canary. It is the first worker allowed to write there
#145 In progress: the workers session builds a sibling preview-workers action

The maintainer's calls of 2026-11-07 to 2026-11-10

Call Where it shows
Wave 5: three sessions, for #270, #224 and #216, each checking its issue first #280, #281, #283, #284
#270: keep build-jupyter-cache's full _build save (review M3); Changed, with no marker; the execution fallbacks mirror the build cache's #280
#224: a new setup-latex action, then setup-environment. The package list is required. download-timeout-minutes defaults to 30, where 0 means no limit, and setup-environment has a fixed 30. No saves from tag refs #283, #284
#216: read the subdomain from wrangler's pages-deploy-detailed record, and warn and fall back otherwise; Fixed, with no marker #281
The canary's set-up for wave 6: a release-gate environment restricted to main, holding gate-only tokens; a qe-preview-canary Worker on the org's Cloudflare account, with a per-Worker token #135, #145
Wave 6: containers, gate and workers. Containers ran first; gate and workers launched once credit allowed this plan
The lecture matrix takes #274's superseded-run rule; a run superseded by a dispatch files nothing either #286, #287
After the 504 on 2026-11-09: rerun the failed leg, and move v0 to v0.16.0 if green #285
#277: keep main's newest 10 builds and everything from the last 90 days; branch dispatches go after 14 days; a monthly workflow, dry run by default; a pins file; at most 50 deletions per image per run; a Changed entry with no marker. The first live run was watched #290, #277
#141 and #196: a 240-min ceiling and two warnings, with no issue filed; one PR for both; the lecture-side questions filed in lecture-python.myst #288, QuantEcon/lecture-python.myst#1118
v0.17.0: release, tag and canary at once #289
File #291 (Cloudflare Pages previews never 404), at low priority #291
Close tracker #188 once nothing is open under it #188

The calls of 2026-11-05 to 2026-11-07 are in this issue's revision of 2026-11-07 01:00 UTC (see its edit history) and in the PRs they name. The 2026-11-04 decisions still govern the gate work, so they stay below.

The 2026-11-04 decisions

# Decision Recorded on
1 Release gate: a gate.yml in the canary (QuantEcon/test-actions-lecture-intro), not a new repo. #136 is the gate fixture's content; #135 is gate.yml, with no v0-next tag #143, #135, #136
2 Previews outside a PR: an opt-in input in both preview actions, with a reserved dispatch- alias prefix, an event allow-list and a deployed output #143, #227, #193
3 Gate candidates: only commits reachable from main or a v* tag; secrets in a canary environment restricted to the canary's main #143
4 Gate builds are frozen: a committed image digest, cold builds, intersphinx off #143
5 publish-gh-pages is in the gate (deploy only); release-asset packaging is tested in this repo's harness (done in #257) #143
6 HTML-only previews hide the download buttons #146, #148
7 A parallel PDF check on PRs, which each site can switch off #146, #230
8 Run the #221 handover, then merge #220 and #221 done
9 Scheduled image rebuilds: pin the Ubuntu base by digest, Dependabot proposes base moves, drop the weekly schedule, correct the docs (done in #255) #234
10 #177: add visibility; keep require-access as a deprecated alias (removed in v0.16.0 by #276) #177
11 Next release: a small v0.13.0 soon done
12 This issue replaces #212 this plan

Releases

Follow-ups found during the waves

Explicitly not doing

Resuming

The organiser session is mini:actions, and the workers are mini:actions-<name>. The briefs live in the maintainer's checkout under .claude/briefs/ and are not committed:

  • HANDOVER.md is the organiser's start-up file, and start.sh starts a fresh organiser;
  • common.md holds the current worker rules, including the two-part issue check, and <name>.md each worker's brief;
  • proposal-checks/ holds each issue's check;
  • release-templates/ holds the last release's PR body, notes and canary files.

A fresh session can work from this issue, the merged PRs and the decision records alone: each PR body states its design, what it checked and what it leaves out.

Claude Code (on behalf of mmcky), organiser session

Activity

  1. mmcky commented on Nov 5, 2026

    @mmcky
    ContributorAuthor

    Revision 2026-11-05 00:45 UTC (organiser session)

    Landed.

    Canary green. QuantEcon/test-actions-lecture-intro PR 76 deployed both previews at @v0.13.0, and cache.yml run 41942754633 from staged-v0.13.0-cache passed. v0 has not moved; that waits on the maintainer's approval.

    Learned. Cutting a release let PRs that add CHANGELOG entries merge into the released section without a conflict. #241, #242 and #245 did on update, and so did #244's Deprecated block. Each was moved back by hand. The body now has the check to run before each merge.

    New.

    Changed in the body.

    The #239 counter follow-up is gone, because the count now reads 2.

    Claude Code (on behalf of mmcky)

  2. mmcky commented on Nov 5, 2026

    @mmcky
    ContributorAuthor

    Revision, 2026-11-05 05:02 UTC: wave 1 is merged and v0.13.0 is out.

    What landed since the 00:45 UTC revision:

    What inverted:

    New follow-up: superseded lecture-matrix runs file a failure issue (#249). It is recorded in the body for the maintainer to decide on.

    Dropped from the body because they are done: the #222 row, the #142 rollback wording (landed in #245) and the #241/#245 overlap note. Also dropped: the Monday 02:00 UTC image-size warning, now moot, and the "Held" section, since no Dependabot PRs are open.

    Claude Code (on behalf of mmcky), organiser session

  3. mmcky commented on Nov 5, 2026

    @mmcky
    ContributorAuthor

    Revision, 2026-11-05 21:30 UTC: wave 2 is merged and v0.15.0 is out, with v0 on it.

    What landed since the 05:02 UTC revision:

    What inverted, or came out differently from the issue:

    New: a "maintainer's calls of 2026-11-05" table, so the day's ten decisions sit beside the twelve of 2026-11-04, and a wave-3 candidate list. The front of the plan is now the first scheduled matrix run on 2026-11-09.

    Claude Code (on behalf of mmcky), organiser session

  4. added a commit that references this issue on Nov 7, 2026
  5. changed the title [-]Work plan — 2026-11-04 wave: decisions into PRs, v0.13.0, then the release gate[/-] [+]Work plan — QuantEcon/actions: v0.16.0 shipped; next the v0 move, #142's promotion, then wave 5[/+] on Nov 7, 2026
  6. mmcky commented on Nov 7, 2026

    @mmcky
    ContributorAuthor

    Revision of 2026-11-07, 01:00 UTC. The body now covers waves 3 and 4, the proposal check between them, and v0.16.0. This comment records what landed, what was decided, which premises turned out wrong, and what is deferred.

    What landed

    Decided. These are in the body's new table, "The maintainer's calls of 2026-11-06 and 07". The one that changes how work is done: before any code, a worker checks its issue's facts and then its proposal, since an issue can be old and its design overtaken.

    Premises that turned out wrong

    Deferred, with reasons

    What's next is in the body's "Front of the plan": the 2026-11-09 02:00 UTC lecture-matrix run, then the v0 move, then #274's watched merge.

    Claude Code (on behalf of mmcky), organiser session

  7. changed the title [-]Work plan — QuantEcon/actions: v0.16.0 shipped; next the v0 move, #142's promotion, then wave 5[/-] [+]Work plan — QuantEcon/actions: v0.17.0 shipped; next the v0 move and wave 6's gate and workers[/+] on Nov 10, 2026
  8. mmcky commented on Nov 10, 2026

    @mmcky
    ContributorAuthor

    Revision of 2026-11-10 05:20 UTC, covering everything since the 2026-11-07 01:00 UTC stamp: waves 5 and 6, v0.17.0, and two v0 moves' worth of matrix runs.

    Landed:

    Premises that inverted:

    Decided: see the body's table of the maintainer's calls of 2026-11-07 to 2026-11-10. The ones that change behaviour: #277's retention policy, #288's ceiling and warnings, and #287's rule.

    Filed: #282 (a stub-API wrangler harness), #286, #291 (Cloudflare Pages previews never 404), and QuantEcon/lecture-python.myst#1118.

    Next: run 80's result decides v0.17.0's v0 move. Wave 6's gate session (#136, #135) and workers session (#145) started 05:17 UTC with their issue checks. The body's front of the plan has the order.

    Claude Code (on behalf of mmcky), organiser session

  9. mmcky commented on Nov 10, 2026

    @mmcky
    ContributorAuthor

    This plan ran six waves from 2026-11-04. Its revision of 2026-11-07 recorded waves 1 to 4, and this ledger covers waves 5 and 6, which are done. It is succeeded by #305, which carries the open items forward.

    Shipped

    Decided (the maintainer, 2026-11-10)

    Carried forward to #305: v0.18.0 (#304) and its staging; wave 7's #300 and #27; the decisions waiting on #97, #194 and #195; #302, #299, #291, #282; and the follow-ups this body listed.

    Claude Code (on behalf of mmcky), organiser session

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions