Validation of the Power System Model for 2019 #363

@FabianHofmann

Description

@FabianHofmann

Strongly related to changes in #353

Note: We should disable the simplify wildcard in order to keep most of the generators separately and therefore their costs and efficiencies.

Validation methods

We separate the validation into two steps:

Validation of the Network pre-optimization

Powerplants

Cross-border Capacities

  • Double-check cross-border transmission capacities ( @Irieo, @martacki )
    • How does the spatial resolution affect the simulation?

Costs

  • Add 2020 costs

Validation of the Network post-optimization

  • Energy mix per country
  • Import/Export balances
  • OCGT dispatch
  • electricity price time series (with one node per bidding zone, NTCs rather than fraction of thermal rating, linearised unit commitment, ramping, CO2 certificate price time series from historical data, heat-led CHP, demand elasticity for energy-intensive industry and updated varied efficiencies of gas plants)