Skip to content

Selecting Censoring event for Payer Plan period fails #2616

Description

@mik-ohdsi

Expected behavior

For Cohort Exit add a Censoring Event, choose Payer Plan Period, a new line appears to specify the period.

Actual behavior

Adding a censoring event with Payer Plan Period seems to do nothing. Later, after scrolling up to the cohort entry section an entry was found with a message saying that Payer Plan Period only works with v.5.3 up. The entry ended up in the wrong place.
ATLAS_payerplanperiod

Steps to reproduce behavior

http://ohdsisym21.us-east-1.elasticbeanstalk.com/#/cohortdefinitions, ATLAS & WebAPI Version 2.9.1

Create cohort, create some entry criteria, add a censoring event for Payer Plan Period to the cohort exit section, scroll up to the entry section and find a misplaced Payer Plan period line.

On a different note: when selecting visit, a specimen entry is created instead. This is presumably fixed by #2579 in version 2.10 that added specimen (and hopefully reintroduced visit properly).
ATLAS_censoring_visit

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Fields

    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions