You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Duplicate a project with optional issues and shifted dates #207
area: projectsProjects, milestones and initiativesenhancementA new capability or an improvement to an existing onehelp wantedWe would love a hand with this onep2 mediumWorth doing, not urgentpoints: 3Fibonacci estimate: 3readyScoped, agreed, and safe to pick uproadmapA tracked item on the public roadmapsize: mediumA day or two. One surface, no new model
The agreed first slice is project duplication: copy a project with or without its issues and shift its dates by N calendar days. Reuse the existing project, milestone and issue services, enforce the caller's permissions, and make database creation transactional with normal realtime delivery. Cover optional issues, missing dates, milestone relationships, date shifts and cross-workspace refusals.
Saved project templates are deferred until the shared storage decision in #202. This duplication slice does not depend on template storage and should not introduce a third template model. Start with packages/core/src/work/project-service.ts and apps/web/src/features/projects/.
The storage model for this is being decided on #202. Read that thread first.
The relative date handling described here is the part that is specific to project templates and is not covered by #202 or #206.
Note the suggestion in the body about shipping duplication before templates. That path does not depend on #202 at all, so it is the way to make progress here without waiting.
Narrowed to project duplication: copy a project with or without its issues, shifting every date by N days. Templates come later on the storage decided in #202. Labels adjusted to match.
area: projectsProjects, milestones and initiativesenhancementA new capability or an improvement to an existing onehelp wantedWe would love a hand with this onep2 mediumWorth doing, not urgentpoints: 3Fibonacci estimate: 3readyScoped, agreed, and safe to pick uproadmapA tracked item on the public roadmapsize: mediumA day or two. One surface, no new model
Activity
imshashank commentedon Aug 8, 2026
The storage model for this is being decided on #202. Read that thread first.
The relative date handling described here is the part that is specific to project templates and is not covered by #202 or #206.
Note the suggestion in the body about shipping duplication before templates. That path does not depend on #202 at all, so it is the way to make progress here without waiting.
imshashank commentedon Sep 6, 2026
Narrowed to project duplication: copy a project with or without its issues, shifting every date by N days. Templates come later on the storage decided in #202. Labels adjusted to match.
[-]Project templates and project duplication[/-][+]Duplicate a project with optional issues and shifted dates[/+]