Skip to content

ceph.arrow-cpp: pin to protobuf 32#462437

Merged
dotlambda merged 1 commit intoNixOS:masterfrom
limwa:ceph/pin-arrow-cpp-to-protobuf-32
Nov 18, 2025
Merged

ceph.arrow-cpp: pin to protobuf 32#462437
dotlambda merged 1 commit intoNixOS:masterfrom
limwa:ceph/pin-arrow-cpp-to-protobuf-32

Conversation

@limwa
Copy link
Contributor

@limwa limwa commented Nov 17, 2025

Pins protobuf for arrow-cpp in ceph's derivation to version 32.

In the recent staging-next iteration, protobuf was updated to v33, which made the tests for arrow-cpp not finish.

Things done

  • Built on platform:
    • x86_64-linux
    • aarch64-linux
    • x86_64-darwin
    • aarch64-darwin
  • Tested, as applicable:
  • Ran nixpkgs-review on this PR. See nixpkgs-review usage.
  • Tested basic functionality of all binary files, usually in ./result/bin/.
  • Nixpkgs Release Notes
    • Package update: when the change is major or breaking.
  • NixOS Release Notes
    • Module addition: when adding a new NixOS module.
    • Module update: when the change is significant.
  • Fits CONTRIBUTING.md, pkgs/README.md, maintainers/README.md and other READMEs.

Add a 👍 reaction to pull requests you find important.

@limwa
Copy link
Contributor Author

limwa commented Nov 17, 2025

This is the second part of a fix for #462362.
First part: #462435

@nixpkgs-ci nixpkgs-ci bot added 10.rebuild-linux: 1-10 This PR causes between 1 and 10 packages to rebuild on Linux. 10.rebuild-darwin: 0 This PR does not cause any packages to rebuild on Darwin. labels Nov 17, 2025
@wolfgangwalther
Copy link
Contributor

@alexanderkjeldaas it looks like you missed the invitation to the nixpkgs-maintainers team when you became a maintainer. That's why you can't requested for review by CI on these PRs. Please consider requesting another invite, see https://github.com/NixOS/nixpkgs/tree/master/maintainers#tools-for-maintainers for details.

@dotlambda dotlambda linked an issue Nov 18, 2025 that may be closed by this pull request
3 tasks
@dotlambda dotlambda added this pull request to the merge queue Nov 18, 2025
Merged via the queue into NixOS:master with commit 60e94fc Nov 18, 2025
32 of 34 checks passed
@limwa limwa deleted the ceph/pin-arrow-cpp-to-protobuf-32 branch November 25, 2025 23:10
@dotlambda dotlambda mentioned this pull request Dec 1, 2025
13 tasks
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

10.rebuild-darwin: 0 This PR does not cause any packages to rebuild on Darwin. 10.rebuild-linux: 1-10 This PR causes between 1 and 10 packages to rebuild on Linux.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Build failure: ceph

3 participants