Skip to content

[Backport staging-25.05] gupnp_1_6: 1.6.8 -> 1.6.9#437433

Merged
fabianhjr merged 1 commit intostaging-25.05from
backport-422806-to-staging-25.05
Aug 31, 2025
Merged

[Backport staging-25.05] gupnp_1_6: 1.6.8 -> 1.6.9#437433
fabianhjr merged 1 commit intostaging-25.05from
backport-422806-to-staging-25.05

Conversation

@nixpkgs-ci
Copy link
Contributor

@nixpkgs-ci nixpkgs-ci bot commented Aug 27, 2025

Bot-based backport to staging-25.05, triggered by a label in #422806.

  • Before merging, ensure that this backport is acceptable for the release.
    • Even as a non-committer, if you find that it is not acceptable, leave a comment.

(cherry picked from commit 802afd0)
@nixpkgs-ci nixpkgs-ci bot added 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-darwin: 101-500 This PR causes between 101 and 500 packages to rebuild on Darwin. 10.rebuild-linux: 2501-5000 This PR causes many rebuilds on Linux and should target the staging branches. 4.workflow: backport This targets a stable branch 9.needs: reviewer This PR currently has no reviewers requested and needs attention. labels Aug 27, 2025
@fabianhjr fabianhjr merged commit 7a3fcc9 into staging-25.05 Aug 31, 2025
36 of 37 checks passed
@fabianhjr fabianhjr deleted the backport-422806-to-staging-25.05 branch August 31, 2025 16:54
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

4.workflow: backport This targets a stable branch 9.needs: reviewer This PR currently has no reviewers requested and needs attention. 10.rebuild-darwin: 101-500 This PR causes between 101 and 500 packages to rebuild on Darwin. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 2501-5000 This PR causes many rebuilds on Linux and should target the staging branches.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants