Skip to content

[Backport staging-25.05] libtiff: apply patch CVE-2024-13978 and CVE-2025-9165#437401

Merged
fabianhjr merged 1 commit intostaging-25.05from
backport-436742-to-staging-25.05
Aug 29, 2025
Merged

[Backport staging-25.05] libtiff: apply patch CVE-2024-13978 and CVE-2025-9165#437401
fabianhjr merged 1 commit intostaging-25.05from
backport-436742-to-staging-25.05

Conversation

@nixpkgs-ci
Copy link
Contributor

@nixpkgs-ci nixpkgs-ci bot commented Aug 27, 2025

Bot-based backport to staging-25.05, triggered by a label in #436742.

  • Before merging, ensure that this backport is acceptable for the release.
    • Even as a non-committer, if you find that it is not acceptable, leave a comment.

@nixpkgs-ci nixpkgs-ci bot added the 1.severity: security Issues which raise a security issue, or PRs that fix one label Aug 27, 2025
@nixpkgs-ci nixpkgs-ci bot added 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-darwin: 501+ This PR causes many rebuilds on Darwin and should normally target the staging branches. 10.rebuild-darwin: 5001+ This PR causes many rebuilds on Darwin and must target the staging branches. 10.rebuild-linux: 5001+ This PR causes many rebuilds on Linux and must target the staging branches. 4.workflow: backport This targets a stable branch labels Aug 27, 2025
@fabianhjr fabianhjr merged commit 88b4475 into staging-25.05 Aug 29, 2025
36 of 38 checks passed
@fabianhjr fabianhjr deleted the backport-436742-to-staging-25.05 branch August 29, 2025 20:43
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

1.severity: security Issues which raise a security issue, or PRs that fix one 4.workflow: backport This targets a stable branch 10.rebuild-darwin: 501+ This PR causes many rebuilds on Darwin and should normally target the staging branches. 10.rebuild-darwin: 5001+ This PR causes many rebuilds on Darwin and must target the staging branches. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 5001+ This PR causes many rebuilds on Linux and must target the staging branches.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants