Skip to content

[Backport staging-23.11] alsa-ucm-conf: 1.2.10 -> 1.2.11#288568

Merged
vcunat merged 1 commit intostaging-23.11from
backport-285173-to-staging-23.11
Feb 22, 2024
Merged

[Backport staging-23.11] alsa-ucm-conf: 1.2.10 -> 1.2.11#288568
vcunat merged 1 commit intostaging-23.11from
backport-285173-to-staging-23.11

Conversation

@github-actions
Copy link
Contributor

Bot-based backport to staging-23.11, triggered by a label in #285173.

  • Before merging, ensure that this backport is acceptable for the release.
    • Even as a non-commiter, if you find that it is not acceptable, leave a comment.

(cherry picked from commit 1733c6d)
@ofborg ofborg bot requested a review from roastiek February 13, 2024 14:42
@ofborg ofborg bot added 10.rebuild-darwin: 101-500 This PR causes between 101 and 500 packages to rebuild on Darwin. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 5001+ This PR causes many rebuilds on Linux and must target the staging branches. labels Feb 13, 2024
@vcunat vcunat merged commit de82d47 into staging-23.11 Feb 22, 2024
@vcunat vcunat deleted the backport-285173-to-staging-23.11 branch February 22, 2024 20:36
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

10.rebuild-darwin: 101-500 This PR causes between 101 and 500 packages to rebuild on Darwin. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 5001+ This PR causes many rebuilds on Linux and must target the staging branches.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants