Skip to content

gtk4: 4.12.3 → 4.12.4#271684

Merged
amaxine merged 1 commit intoNixOS:stagingfrom
jtojnar:gtk4
Dec 3, 2023
Merged

gtk4: 4.12.3 → 4.12.4#271684
amaxine merged 1 commit intoNixOS:stagingfrom
jtojnar:gtk4

Conversation

@jtojnar
Copy link
Member

@jtojnar jtojnar commented Dec 2, 2023

Description of changes

https://gitlab.gnome.org/GNOME/gtk/-/compare/4.12.3...4.12.4

Run few apps built against this in #271680.

Things done

  • Built on platform(s)
    • x86_64-linux
    • aarch64-linux
    • x86_64-darwin
    • aarch64-darwin
  • For non-Linux: Is sandboxing enabled in nix.conf? (See Nix manual)
    • sandbox = relaxed
    • sandbox = true
  • Tested, as applicable:
  • Tested compilation of all packages that depend on this change using nix-shell -p nixpkgs-review --run "nixpkgs-review rev HEAD". Note: all changes have to be committed, also see nixpkgs-review usage
  • Tested basic functionality of all binary files (usually in ./result/bin/)
  • 24.05 Release Notes (or backporting 23.05 and 23.11 Release notes)
    • (Package updates) Added a release notes entry if the change is major or breaking
    • (Module updates) Added a release notes entry if the change is significant
    • (Module addition) Added a release notes entry if adding a new NixOS module
  • Fits CONTRIBUTING.md.

Priorities

Add a 👍 reaction to pull requests you find important.

@jtojnar jtojnar changed the base branch from master to staging December 2, 2023 14:33
@ofborg ofborg bot added 11.by: package-maintainer This PR was created by a maintainer of all the package it changes. 10.rebuild-darwin: 101-500 This PR causes between 101 and 500 packages to rebuild on Darwin. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 501-1000 This PR causes many rebuilds on Linux and should normally target the staging branches. labels Dec 2, 2023
@amaxine amaxine merged commit 8deedf1 into NixOS:staging Dec 3, 2023
@github-actions
Copy link
Contributor

github-actions bot commented Dec 3, 2023

Successfully created backport PR for staging-23.11:

@jtojnar jtojnar deleted the gtk4 branch December 3, 2023 14:56
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

10.rebuild-darwin: 101-500 This PR causes between 101 and 500 packages to rebuild on Darwin. 10.rebuild-linux: 501-1000 This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 11.by: package-maintainer This PR was created by a maintainer of all the package it changes.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants