Skip to content

[Backport staging-23.11] http-parser: fix copying outputs for static build#271203

Merged
Ericson2314 merged 2 commits intostaging-23.11from
backport-254516-to-staging-23.11
Nov 30, 2023
Merged

[Backport staging-23.11] http-parser: fix copying outputs for static build#271203
Ericson2314 merged 2 commits intostaging-23.11from
backport-254516-to-staging-23.11

Conversation

@github-actions
Copy link
Contributor

Bot-based backport to staging-23.11, triggered by a label in #254516.

  • Before merging, ensure that this backport is acceptable for the release.
    • Even as a non-commiter, if you find that it is not acceptable, leave a comment.

Ericson2314 and others added 2 commits November 30, 2023 14:32
Since 4056c43 a Make not Gyp build
system has been in use.

(cherry picked from commit fa58b67)
Co-Authored-By: John Ericson <[email protected]>
(cherry picked from commit 33f464b)
@Ericson2314 Ericson2314 reopened this Nov 30, 2023
@ofborg ofborg bot requested a review from matthewbauer November 30, 2023 19:37
@ofborg ofborg bot added 10.rebuild-darwin: 501+ This PR causes many rebuilds on Darwin and should normally target the staging branches. 10.rebuild-darwin: 1001-2500 This PR causes many rebuilds on Darwin and should most likely target the staging branches. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 1001-2500 This PR causes many rebuilds on Linux and should target the staging branches. labels Nov 30, 2023
@Ericson2314 Ericson2314 merged commit f06ae9e into staging-23.11 Nov 30, 2023
@Ericson2314 Ericson2314 deleted the backport-254516-to-staging-23.11 branch November 30, 2023 20:50
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

10.rebuild-darwin: 501+ This PR causes many rebuilds on Darwin and should normally target the staging branches. 10.rebuild-darwin: 1001-2500 This PR causes many rebuilds on Darwin and should most likely target the staging branches. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 1001-2500 This PR causes many rebuilds on Linux and should target the staging branches.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants