Skip to content

[Backport staging-23.11] gst-plugins-good: add openssl dependency#269542

Merged
lilyinstarlight merged 1 commit intostaging-23.11from
backport-267733-to-staging-23.11
Nov 24, 2023
Merged

[Backport staging-23.11] gst-plugins-good: add openssl dependency#269542
lilyinstarlight merged 1 commit intostaging-23.11from
backport-267733-to-staging-23.11

Conversation

@github-actions
Copy link
Contributor

@github-actions github-actions bot commented Nov 24, 2023

Bot-based backport to staging-23.11, triggered by a label in #267733.

  • Before merging, ensure that this backport is acceptable for the release.
    • Even as a non-commiter, if you find that it is not acceptable, leave a comment.

@ofborg ofborg bot added 10.rebuild-darwin: 101-500 This PR causes between 101 and 500 packages to rebuild on Darwin. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 501-1000 This PR causes many rebuilds on Linux and should normally target the staging branches. labels Nov 24, 2023
@lilyinstarlight lilyinstarlight merged commit 612b005 into staging-23.11 Nov 24, 2023
@lilyinstarlight lilyinstarlight deleted the backport-267733-to-staging-23.11 branch November 24, 2023 13:34
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

10.rebuild-darwin: 101-500 This PR causes between 101 and 500 packages to rebuild on Darwin. 10.rebuild-linux: 501-1000 This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants