Skip to content

[Backport staging-22.11] libopenmpt: 0.6.8 -> 0.6.9#220270

Merged
marsam merged 1 commit intostaging-22.11from
backport-219847-to-staging-22.11
Mar 10, 2023
Merged

[Backport staging-22.11] libopenmpt: 0.6.8 -> 0.6.9#220270
marsam merged 1 commit intostaging-22.11from
backport-219847-to-staging-22.11

Conversation

@github-actions
Copy link
Contributor

@github-actions github-actions bot commented Mar 9, 2023

Bot-based backport to staging-22.11, triggered by a label in #219847.

  • Before merging, ensure that this backport complies with the Criteria for Backporting.
    • Even as a non-commiter, if you find that it does not comply, leave a comment.

(cherry picked from commit c68f2c9)
@ofborg ofborg bot requested a review from OPNA2608 March 9, 2023 04:48
@ofborg ofborg bot added 10.rebuild-darwin: 101-500 This PR causes between 101 and 500 packages to rebuild on Darwin. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 501-1000 This PR causes many rebuilds on Linux and should normally target the staging branches. labels Mar 9, 2023
@marsam marsam merged commit ac18653 into staging-22.11 Mar 10, 2023
@marsam marsam deleted the backport-219847-to-staging-22.11 branch March 10, 2023 05:28
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

10.rebuild-darwin: 101-500 This PR causes between 101 and 500 packages to rebuild on Darwin. 10.rebuild-linux: 501-1000 This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants