Skip to content

[Backport staging-21.11] samba: 4.15.3 -> 4.15.5#157721

Closed
github-actions[bot] wants to merge 1 commit intostaging-21.11from
backport-157709-to-staging-21.11
Closed

[Backport staging-21.11] samba: 4.15.3 -> 4.15.5#157721
github-actions[bot] wants to merge 1 commit intostaging-21.11from
backport-157709-to-staging-21.11

Conversation

@github-actions
Copy link
Contributor

@github-actions github-actions bot commented Feb 1, 2022

Bot-based backport to staging-21.11, triggered by a label in #157709.

  • Before merging, ensure that this backport complies with the Criteria for Backporting.
    • Even as a non-commiter, if you find that it does not comply, leave a comment.

@github-actions github-actions bot mentioned this pull request Feb 1, 2022
13 tasks
@c0bw3b c0bw3b added the 1.severity: security Issues which raise a security issue, or PRs that fix one label Feb 1, 2022
@mweinelt
Copy link
Member

mweinelt commented Feb 1, 2022

Will cherry-pick the commits to master and then backport directly to release-21.11.

@mweinelt mweinelt closed this Feb 1, 2022
@mweinelt mweinelt deleted the backport-157709-to-staging-21.11 branch February 1, 2022 18:19
@ofborg ofborg bot requested a review from aneeshusa February 1, 2022 23:08
@ofborg ofborg bot added 10.rebuild-darwin: 11-100 This PR causes between 11 and 100 packages to rebuild on Darwin. 10.rebuild-linux: 101-500 This PR causes between 101 and 500 packages to rebuild on Linux. labels Feb 1, 2022
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

1.severity: security Issues which raise a security issue, or PRs that fix one 10.rebuild-darwin: 11-100 This PR causes between 11 and 100 packages to rebuild on Darwin. 10.rebuild-linux: 101-500 This PR causes between 101 and 500 packages to rebuild on Linux.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants