Skip to content

Typo in Ideal Air Loads Input Output Reference #10833

@Sashadf1

Description

@Sashadf1

Issue overview

**
Section 1 18 7 Zone Sizing Typo

The term SOA doesn't correspond to any standard HVAC terminology, especially in the context of zone sizing calculations. The intended term is likely DOA, referring to a Dedicated Outdoor Air system.

The documentation states:
"The design calculation will calculate the heat addition rate to the zone of an idealized SOA system and add or subtract the result from the total zone loads and flow rates."

Should say DOA instead.
**

Metadata

Metadata

Assignees

No one assigned

    Labels

    DocumentationRelated primarily on the LaTeX-based EnergyPlus documentation

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions