Repository navigation
test(codegen): validate spill-free three-slot WGMMA counted pipeline - #1011
Merged
nihalpasham merged 1 commit intoAug 19, 2026
Merged
Conversation
Signed-off-by: Raul Estrada <[email protected]>
Collaborator
|
nihalpasham
approved these changes
Aug 19, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Closes #1010
Summary
Extend the existing counted WGMMA pipeline backend probe with a three-slot variant using
wait_group<2>.The test keeps the production-independent structure of the existing two-slot carrier and exercises a larger convergent inline-PTX lifetime containing:
f32accumulator valueswait_group<2>throttlingwait_group<0>This PR intentionally does not modify the production counted-loop recognizer or lowering path. Its purpose is to resolve the backend register-pressure question before adding three-slot production support.
Results
On
sm_90a,ptxasreports:The three-slot carrier therefore remains fully register-resident despite keeping 96 tied accumulator values and 13 control values live across the counted PTX loop.
Validation
Result:
The three-slot
ptxasprobe reports zero stack and zero spill traffic.Scope
This PR only extends:
It does not change production recognition or lowering.
A follow-up PR can use this result to add production support for: