Skip to content

ci(colossus): smoke-test the leased machine runner - #14305

Merged
cv merged 1 commit into
v1from
codex/colossus-native-runner-smoke
Nov 9, 2026
Merged

cv merged 1 commit into
v1from
codex/colossus-native-runner-smoke

Conversation

@rsliter

@rsliter rsliter commented Nov 8, 2026 •

Copy link
Copy Markdown
Collaborator

Replace the v1 SSH probe with a manual smoke test that executes true on a dedicated runner on a leased GB300 machine, establishing job delivery for future E2E testing.

Problem

The existing workflow depends on an enterprise runner reaching the leased machine over SSH. The pilot instead registers a runner directly on the leased machine.

Change

Reuse colossus-connectivity.yml, so the existing inert registration on main stays unchanged. Restrict this workflow to manual dispatches on the canonical v1 branch, use the dedicated pilot label, and retain a two-minute execution timeout and serialized runs. The job has empty token permissions, no checkout, no environment secrets, and only one command: true.

Replace the SSH-specific tests with workflow contracts and remove the obsolete SSH test harness. Runner registration and one-job deregistration remain provisioning concerns outside this workflow.

Beyond CI

The runner was registered and observed in repository settings. Live job delivery is unverified until the merged workflow is dispatched and the runner starts. A successful run establishes job execution, not GPU or application functionality. Labels route jobs and do not enforce workflow authorization.

Signed-off-by: Rebecca Sliter [email protected]

Summary by CodeRabbit

  • CI Changes
    • The Colossus connectivity workflow now runs only when manually dispatched for the v1 branch of the designated repository, using the Colossus pilot runner.
    • The workflow no longer runs pull-request validation, including Rust formatting and test checks, or probes SSH connectivity. Its sole step is a no-op, so it does not verify connectivity or report probe results.

@rsliter rsliter self-assigned this Nov 8, 2026
@copy-pr-bot

copy-pr-bot Bot commented Nov 8, 2026

Copy link
Copy Markdown

Auto-sync is disabled for draft pull requests in this repository. Workflows must be run manually.

Contributors can view more details about this message here.

@rsliter

rsliter commented Nov 8, 2026

Copy link
Copy Markdown
Collaborator Author
Authoring session — opening
Field Status Value Evidence or limit
Harness recorded Codex Desktop 0.163.0-alpha.10.2 Authoring record metadata and matching branch activity.
Skills partial Contributor create PR (main and v1); test-driven-development; write-tests Complete reads for this change verified. Earlier truncated guidance reads limit the full historical inventory.
Instruction files partial AGENTS.md; WRITING.md; PR and session-report templates; PR follow-up contract Current complete reads verified. Earlier truncated output prevents a complete historical inventory.
Tool calls partial 1696 direct recorded invocations; exec wrappers: 1565 Includes failures across the whole session; nested calls inside wrappers are not counted.
Session window recorded 2026-10-28T19:03:09.338Z to 2026-11-08T04:06:08.112Z; 10 days, 9:02:58 elapsed Whole authoring session, including idle time and earlier work; not task-only.
Compactions recorded 22 Persisted compaction events through cutoff.
Models recorded gpt-6-sol; gpt-6.1-sol Recorded turn contexts through cutoff.
Reasoning levels recorded high; medium Distinct recorded efforts in first-seen order.

@rsliter

rsliter commented Nov 8, 2026

Copy link
Copy Markdown
Collaborator Author

@coderabbitai review

@coderabbitai

coderabbitai Bot commented Nov 8, 2026 •

Copy link
Copy Markdown
Contributor
Action performed

Review finished.

Note: CodeRabbit is an incremental review system and does not re-review already reviewed commits. This command is applicable only when automatic reviews are paused.

@github-actions

github-actions Bot commented Nov 8, 2026

Copy link
Copy Markdown
Contributor

@coderabbitai

coderabbitai Bot commented Nov 8, 2026

Copy link
Copy Markdown
Contributor

Explain Change →

No actionable comments were generated in the recent review.

Walkthrough

The workflow now runs a manual-only smoke job on the Colossus pilot runner for the specified repository and branch. The SSH connectivity probe, pull-request validation job, and probe scenario tests are removed. Workflow tests now check the smoke job’s configuration.

Changes

Colossus smoke workflow

Layer / File(s) Summary
Manual smoke workflow contract
.github/workflows/colossus-connectivity.yml, crates/nemoclaw-build/tests/workflows.rs, tools/ci/colossus-connectivity-workflow.rs
The workflow runs true on the Colossus pilot runner for manual dispatches on the specified repository and branch. Contract tests check its trigger, job, permissions, environment, and step configuration. The former SSH probe scenario tests are removed.

Estimated code review effort: 2 (Simple) | ~10 minutes

Change: Other

Possibly related issues

Possibly related PRs

  • NVIDIA/NemoClaw#14234 — It registers the same workflow on main; this PR adds the smoke job on v1 and updates workflow contract tests.

Suggested labels: area: ci, chore

Suggested reviewers: jyaunches

Merge Risk: Minimal · up to 24930

This change replaces the SSH probe with a manually dispatched no-op smoke job on the Colossus pilot runner. It carries minimal merge risk. The job's real-world execution can only be confirmed after merge by dispatching it.

Security architecture risk: Low · up to 24930

The smoke job is tightly bounded: manual execution on the canonical branch, empty token permissions, no checkout or configured secrets, and only the command true. No introduced exploit was established. Runner identity, authorization, and teardown remain external dependencies that could not be verified.

Retained concerns
No architecture-level concerns identified.

Security review details

Security Blast Radius

  • inferred — The visible execution scope is the runner selected by the pilot label. No tenant, datastore, or downstream service access is exercised by the fixed command; the maximum authority available on that host cannot be determined from the workflow.

Security Findings and Attack Paths

  • inferred — No attacker-controlled command path is established by this change: pull-request triggering is removed, execution retains the canonical repository/branch guard, and the command is constant. This conclusion does not resolve whether other workflows can target the registered runner.

Trust Boundaries and Controls

  • observed — The protected-environment association used by the SSH probe is removed. The new workflow retains its explicit dispatch guard, while labels provide routing rather than workflow authorization. External environment approval settings and runner access policies were not supplied, so an approval bypass or equivalent authorization cannot be established.

Resilience and Maintainability Implications

  • inferred — Repeating or interrupting the true command introduces no application-state recovery obligation. Runner registration is separate mutable infrastructure state: the timeout and workflow concurrency setting do not themselves prove deregistration, stale-registration recovery, lease cleanup, or exclusion of other workflows.

Hardening Proposals

  • proposed — Before expanding beyond the no-op pilot, validate workflow-scoped runner authorization, registration-to-lease identity, and one-job teardown across success, failure, cancellation, timeout, repeated dispatch, and lease expiry. Treat these as provisioning assurances, not properties supplied by the runner label.
Pre-merge checks: Passed 5

Check name Status Explanation
Description Check Passed Check skipped - CodeRabbit’s high-level summary is enabled.
Title check Passed The title "ci(colossus): smoke-test the leased machine runner" matches the main change. The PR replaces the v1 SSH connectivity probe with a manually dispatched smoke job that runs true on a dedicat…
Docstring Coverage Passed No eligible functions found in the changed files. Skipping docstring coverage check. Docstring coverage is scoped to functions touched by this diff with cyclomatic complexity of at least 2. Documentat…
Linked Issues check Passed Check skipped because no linked issues were found for this pull request.
Out of Scope Changes check Passed Check skipped because no linked issues were found for this pull request.
Full details: Title check

Explanation

The title "ci(colossus): smoke-test the leased machine runner" matches the main change. The PR replaces the v1 SSH connectivity probe with a manually dispatched smoke job that runs true on a dedicated colossus-gb300-pilot runner. The workflow file, its test file, and the deleted SSH test harness all reflect this change, so the title is specific and accurate.

Full details: Docstring Coverage

Explanation

No eligible functions found in the changed files. Skipping docstring coverage check. Docstring coverage is scoped to functions touched by this diff with cyclomatic complexity of at least 2. Documentation-only edits and deletions within surviving functions are included; unchanged diff context and fully deleted functions are excluded. Analyzed 0 functions across 1 files. (1 skipped: 1 unsupported.)

Finishing Touches

Generate docstrings

  • Commit to this branch
  • Create a new PR
Generate unit tests (beta)

  • Commit to this branch
  • Create a new PR
  • Autofix · Keep fixing CodeRabbit findings and required CI, and resolving merge conflicts

A rabbit watches workflows run,
A quiet true beneath the sun.
The pilot waits for manual flight,
The old probe leaves the stage tonight.
Fresh tests keep the contract right.

Recent review info

Run configuration

  • Source mode: Auto
  • Repository: Unavailable
  • Branch: Unavailable
  • File: No configuration file from this repository applied
  • Commit: Unavailable
  • Layers: Organization UI
  • Review profile: CHILL
  • Plan: Enterprise
  • Run ID: ceff2324-4f30-44c4-9d7f-acc9e21aade7
Commits

Reviewing files that changed from the base of the PR and between ab8d536 and 2493064.

Files selected for processing: 3

  • .github/workflows/colossus-connectivity.yml
  • crates/nemoclaw-build/tests/workflows.rs
  • tools/ci/colossus-connectivity-workflow.rs
Files with no reviewable changes: 1

  • tools/ci/colossus-connectivity-workflow.rs

Included review availability: This review used your included allowance. Your plan provides up to 12 included reviews per hour; 11 remain after this review.

@rsliter
rsliter marked this pull request as ready for review November 9, 2026 13:32
@rsliter
rsliter requested a review from cv November 9, 2026 13:32
@cv
cv merged commit 77cf635 into v1 Nov 9, 2026
79 checks passed
@cv
cv deleted the codex/colossus-native-runner-smoke branch November 9, 2026 19:35
cv added a commit that referenced this pull request Nov 11, 2026
Brings the contributor guides, three skills, and four workflow comments
in line with what `v1` does now, for maintainers who run or change CI
and the test suites. Only documentation and comments change.

## Problem

An audit of `internal-docs/`, `.agents/skills/`, `AGENTS.md`,
`WRITING.md`, and the comments in `.github/workflows/` and
`.github/actions/` against the commits in `v0.1.0-rc9..origin/v1` and
the current code found statements that no longer hold:

- `testing.md` gave the old contract budgets for
`fabric-provider::contract` (25/10/20 s) and
`nemoclaw-provider::contract` (45/8/16 s); `.config/test-budgets.yaml`
and `.config/nextest.toml` now set 32/16/32 s and 82/12/24 s.
- `testing.md` still described an offline runtime-rebuild test in the
`live-docker` profile, which went away with the runtime builder; every
test in that profile now uses Docker and runs in the `docker-engine`
group. It also said the `live-docker` report joins "four" nextest
commands, while the same page counted five; since #14238 the count
depends on the selected Docker HCL cases, which `--hcl-cases` names, and
the page didn't mention that option's rules.
- `testing.md` said `changes live-images` looks for a commit that pushed
"all four images"; `LIVE_PULLED` in `crates/nemoclaw-build/src/ci.rs`
has three (OpenClaw, Hermes, dummy) since #14250.
- `testing.md` said Docker and Kind jobs restore the shared Rust cache.
Since the live suites run from archives (`.github/actions/live-suite`),
only `E2E build images` restores it; Live / HCL's `Build` job uses its
own `hcl-deps-v1` prefix.
- `testing.md` and `live-tests.md` said a manual dispatch needs the
workflow on the default branch, as GitHub's documentation says, and so
told readers to run the advisory check locally and Live / Brev only
through a pushed branch. GitHub has accepted dispatches of `CI /
Dependencies` on a feature branch, including the advisory step, and of
`Live / Brev` on `v1`, although `main` is the default branch; the
evidence comment links the runs. `brev.yml` made the same claim in a
comment.
- `testing.md` didn't mention CI / Dependencies' `Python scripts` check,
the manual `E2E / Colossus runner connectivity` workflow (#14305,
#14340), or the Buildx warm-up before the Linux unit tests (#14367).
- `testing.md` told authors to report commands and results in the PR,
and `documentation.md` asked for `docs:` commits that explain "the
decision and validation"; #14214 changed the template to Problem,
Change, and Beyond CI, and `AGENTS.md` now sends local check results to
whoever asked for the change.
- `live-tests.md` placed the three hosted HCL cases on Live / HCL;
#14238 moved them to CI / Bundle's `E2E HCL CASE` jobs on Linux AMD64.
- `integration-tests.md` said the GTC DC Kubernetes scenario plans
against an existing gateway and that its HCL equivalent isn't planned.
#14315 made the example install a managed Kubernetes gateway, added
`gtc-dc-kubernetes-amd64-hcl`, which plans
`examples/kubernetes/hosted-nvidia.tf`, let the runner take a single
`.tf` file, and kept a managed Kubernetes gateway's endpoint when
redirecting to the fixtures.
- `integration-tests.md`'s `nemoclaw-provider` contract table missed
`gpu_requests` (#14401), `readiness_refs`, and `references`.
- Workflow comments: `e2e-platform.yml` referred to a "required E2E
check" and said no required check depends on the live suites, though a
failed suite fails `Test / PLATFORM`; `image-build.yml` said the live
suites pull the proxy image; `hcl-e2e.yml` said the hosted cases run "on
every run", though they run only when selected and not on forks' pull
requests.
- Skills: `add-fabric-harness` omitted the `read_write` key that
`image/fabric/catalog.py` accepts in `adapters.json` (#14037);
`write-tests`' `tofu test` reference omitted single-file HCL modules;
`verify-yaml-deployment` said all committed examples use ports
17901–17909 and 172.30.180–188, which only the GTC DC examples do.

## Change

- `internal-docs/contributing/testing.md`: the budgets, the
`docker-engine` group, the `live-docker` commands and `--hcl-cases`
rules, the image count, the opt-in `live-images` step, the `tools/ci`
push path and `Python scripts` check of the dependency workflow, the
dispatch command for the advisory step, the Colossus workflow, the
Buildx warm-up, the cache-sharing paragraph, and the reporting rule
above.
- `internal-docs/contributing/live-tests.md`: the runner of the hosted
cases, and how to run Live / Brev on `v1`.
- `internal-docs/contributing/integration-tests.md`: the module sources,
the Kubernetes endpoint exception, both GTC DC Kubernetes rows, and
three contract-table rows.
- `internal-docs/contributing/documentation.md`: the pull request title
and description rule.
- `.agents/skills/`: the three skill corrections above.
- `.github/workflows/{e2e-platform,image-build,hcl-e2e,brev}.yml`:
comments only.

Checked and left unchanged: `configuration-schema.md` (paths, commands,
generator behavior), `releases.md` (the 11 agent packages match
`HARNESSES` in `docker-bake.hcl`; the prune keeps 10 commits),
`image-assessment.md` (Syft 1.55.0, Grype 0.121.0, the 72-hour database
limit, the 120-second timeout, and the acceptance test's name),
`agent-image-maintenance.md`, `documentation-build.md`, the design
records' pins and source paths (OpenShell revision `5d25211b`, Helm
provider 3.3.0), the kind and interface scenario details in
`live-tests.md` against their `.tftest.hcl` files, `AGENTS.md`,
`WRITING.md`, the PR creation skill, and the historical evidence pages.

Left out, because they are outside this audit's scope:

- #14414: `.github/actions/setup-docs/action.yml` restores
`cache-prefix: native-bundle-v3`, but the bundle job has written
`native-bundle-v4` since #14355, so documentation builds restore no
current cache. `testing.md` now says so and links the issue.
- #14415: the comments in `.config/nextest.toml` and
`.config/test-budgets.yaml`, and the `cargo ci` step help in
`crates/nemoclaw-build/src/main.rs`, are stale in the same way as
`testing.md` was.

## Beyond CI

A local check of every relative link and heading anchor in
`internal-docs/`, `.agents/`, `AGENTS.md`, `WRITING.md`, and
`.github/*.md` found no broken target; `fern check` covers only the
published pages.
@wscurran wscurran added area: ci CI workflows, checks, release automation, or GitHub Actions area: security Security controls, permissions, secrets, or hardening chore Build, CI, dependency, or tooling maintenance v1 NemoClaw v1 branch labels Nov 12, 2026
@cv cv added this to the Roadmap: GTC DC 2026 milestone Nov 18, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

area: ci CI workflows, checks, release automation, or GitHub Actions area: security Security controls, permissions, secrets, or hardening chore Build, CI, dependency, or tooling maintenance v1 NemoClaw v1 branch

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants