Skip to content

[Release v0.6.0] Run final end-to-end async I/O regression and scalability validation #329

Closed

Description

@MisterVVP

Proposal

Goal

Validate the combined implementation from #268, #169, #232, #269, #267, and #270 against the v0.5.2/main baseline. Existing per-PR measurements are useful but are not a substitute for final integrated evidence.

Tasks

  • Run comparable real-wire HTTP+JSON, JSON-RPC, and gRPC unary/streaming scenarios at c1/c16/c64, comparing sync and opt-in async paths. Include first-event and completion p50/p95/p99, throughput, errors, CPU, and thread counts.
  • Include HTTP SSE, push delivery, shutdown/cancellation, and idle/slow HTTP clients (e.g., 64/256/1024 connections where the test host permits). Check bounded threads, queues, buffers, memory and idle CPU.
  • Use equivalent work, storage, build type and hardware. Cover in-memory and representative PostgreSQL-backed cases; explicitly attribute blocking PostgreSQL time instead of calling stores nonblocking.
  • Check sync-path regressions at low concurrency and 16/64, not just async throughput. Publish raw results plus one concise before/after Markdown table in CI or book/src/performance/.
  • Run applicable Linux, Windows, macOS and sanitizer/TSan/interoperability tests; investigate reproducible failures or material regressions without relaxing thresholds or broadly refactoring.

Acceptance criteria

  • Full release-candidate commit and benchmark parameters are recorded; sample counts, zero-error expectations and resource limits are explicit.
  • No unexplained material regression in established synchronous paths; reported async scalability benefits are reproducible.
  • Any environment-limited checks are identified rather than reported as passing.

Scope guard: no new reactor or protocol redesign; follow-up fixes should be narrow. Target: release/v0.6.0 / PR #322.

Activity

  1. added this to the v0.6.0 milestone on Nov 10, 2026
  2. self-assigned this
    on Nov 10, 2026
  3. added
    enhancement
    on Nov 10, 2026
  4. moved this from Todo to In Progress in a2a-cpp SDK Roadmapon Nov 11, 2026
  5. moved this from In Progress to Done in a2a-cpp SDK Roadmapon Nov 12, 2026
  6. closed this as completedby moving to Done in a2a-cpp SDK Roadmapon Nov 12, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

enhancement

Type

No type

Projects

Milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions