You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Implement event writes and consequential confirmation in Go #167
Derived from the approved architecture in #155 and ADR 0001 (PR #160).
Contract surface:events create, events update, events cancel;
standard planning for create/update and confirmed planning for cancel.
Evidence gate: reviewed mappings and failures for createEvent, firestorePatchEvent, cancelEvent, and supporting event reads; field-level
update-mask and post-write complete-Event behavior; poster ID handling;
and the exact reviewed value for required remote fields such as EventDraft.displaySettings that are not public product input.
Safe verification: scripted remote fixtures prove exact requests,
precondition rebinding, field allowlists, plan expiry/reuse, and response
validation. No live create/update/cancel.
Complete when: arbitrary Firestore fields cannot be patched, applied
create/update return complete Event, cancel requires a matching --confirm token, and unknown released responses stop at exit 9.
Phase 1 contract-evidence PR is ready: #188 (3b79a57).
It proposes product/remote revision 2026-08-12.4 and keeps shipped Go constants at .3. Current public assets close create/cancel completion only to submitted-only results; they do not establish a post-write complete Event. Firestore update is limited to the reviewed title/description/date/timezone/capacity/links/poster projection plus private updatedBy; location, visibility, and display settings remain excluded because the current client uses field-specific callables. Cancel binds owned PUBLISHED, positive-guest, future-event facts and requires exact confirmation.
No live mutation, credential use, upload registration, or Go implementation occurred. Targeted contract tests (36), full non-live tests (300), typecheck, Go test/race/vet/build/mod verification, privacy scan, and diff checks pass. One delegated review is required; implementation remains blocked until #188 is reviewed and merged.
Activity
KalebCole commentedon Aug 12, 2026
Phase 1 contract-evidence PR is ready: #188 (
3b79a57).It proposes product/remote revision
2026-08-12.4and keeps shipped Go constants at.3. Current public assets close create/cancel completion only to submitted-only results; they do not establish a post-write complete Event. Firestore update is limited to the reviewed title/description/date/timezone/capacity/links/poster projection plus privateupdatedBy; location, visibility, and display settings remain excluded because the current client uses field-specific callables. Cancel binds ownedPUBLISHED, positive-guest, future-event facts and requires exact confirmation.No live mutation, credential use, upload registration, or Go implementation occurred. Targeted contract tests (36), full non-live tests (300), typecheck, Go test/race/vet/build/mod verification, privacy scan, and diff checks pass. One delegated review is required; implementation remains blocked until #188 is reviewed and merged.
spec: close event-write contract evidence for #167 (#188)
feat(go): implement safe event writes (#167) (#189)