You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Prepare Go distribution docs, installers, skills, and npm bridge #136
Prepare and test Go-aware distribution surfaces against verified release candidates while TypeScript remains canonical.
Owns
Documentation, installers, bundled-skill references, and a non-canonical temporary npm binary bridge with explicit unsupported-target behavior.
Does not own
Public launcher cutover or TypeScript/npm retirement.
Acceptance
Installer, skill, documentation, and npm bridge checks use verified artifacts; unsupported targets have a stable structured failure; default installs still select TypeScript.
changed the title [-]Update bundled skills, installers, docs, and npm bridge for Go[/-][+]Prepare Go distribution docs, installers, skills, and npm bridge[/+]on Aug 10, 2026
This ticket belonged to the TypeScript-parity/port execution graph. Redefine partiful as a specification-driven greenfield Go CLI replaces that destination: TypeScript is research evidence, the reviewed remote API and new CLI product contracts are authoritative, and implementation slices will be derived only after those contracts are approved.
This ticket is closed as out of scope for the new destination. Any still-relevant engineering concern will return through a freshly scoped greenfield ticket rather than preserving port assumptions.
Activity
[-]Update bundled skills, installers, docs, and npm bridge for Go[/-][+]Prepare Go distribution docs, installers, skills, and npm bridge[/+]KalebCole commentedon Aug 10, 2026
Superseded scope
This ticket belonged to the TypeScript-parity/port execution graph. Redefine partiful as a specification-driven greenfield Go CLI replaces that destination: TypeScript is research evidence, the reviewed remote API and new CLI product contracts are authoritative, and implementation slices will be derived only after those contracts are approved.
This ticket is closed as out of scope for the new destination. Any still-relevant engineering concern will return through a freshly scoped greenfield ticket rather than preserving port assumptions.