Why the London Millennium Bridge wobbled. Open it in a browser: a crowd walking out of step makes the deck run away anyway, because people leaning against a moving floor are a shock absorber wired backwards. Toggle to the storybook synchrony mechanism and watch it need a different crowd.

Topics

Resources

Stars

0 stars

Watchers

0 watching

Forks

Latest commit

 

History

1 Commit

Folders and files

NameName
Last commit message
Last commit date
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

wobbly

On 10 June 2000 the London Millennium Bridge opened, filled with people, and started swinging sideways hard enough that some of them held on to the rail. It shut two days later and stayed shut for two years.

The story everybody remembers is that the crowd fell into step. Soldiers break step on bridges; the tourists didn't; the bridge swayed. It is a lovely explanation and it is mostly wrong. This is a small thing you open in a browser to watch the real mechanism happen, and then watch the storybook one happen next to it, so you can see they are not the same animal.

Open index.html. No build, no dependencies, no server — three files and a canvas.

What to look for

Leave the mechanism on negative damping, drag the crowd past about forty people, and the deck runs away. Now look at the phase ring: it is a smear. It stays a smear. Nobody is marching in step, and the bridge is going anyway.

That is the whole point. A person on a floor that is already sliding under them puts a foot out sideways to stay upright, and that sideways push happens to be in phase with the floor's velocity. One person, negligible. Sixty people, and the crowd is a shock absorber wired backwards — it takes energy out of the structure's damping instead of putting it in. Add people and the total damping falls; add enough and it goes through zero, and everything below the noise floor starts growing on its own. The critical number falls out in one line:

N_L = 8 π ζ f M / k ≈ 41 people

with Arup's measured numbers for the centre span. No synchrony anywhere in that derivation. The sway causes whatever mild co-ordination you see afterwards, not the other way round — which is exactly backwards from the version everyone tells at parties.

Then switch to phase locking and pull the spread of pacing rates down to zero. Now twenty-five identical walkers are enough: the ring collapses into a clump first, and the deck follows it. Same bridge, one dial apart, a genuinely different route to the same mess. Push the spread back up and this route needs a crowd again, because it has to beat the disagreement between people's own walking rates before it can beat the structure — and it needs a lot, unreliably. Twelve seeds per crowd size, real spread of 0.09 Hz: at ninety people the run ends anywhere between 4.6 mm and 88 mm depending on which crowd you happened to get (r from 0.11 to 0.92), and only by a hundred and twenty does every seed lock. The other mechanism has flipped sign at forty-one and doesn't care about the spread at all. That fragility is the argument against locking being what happened in London.

The presets are shortcuts to the four states worth seeing. opening day is 160 people with the handrail behaviour on: the deck runs away, a chunk of the crowd grabs the rail, the sway drops, they let go, and it climbs again. That sawtooth is not scripted. It is the only nonlinearity in the model, and it is the one Arup named — "the response will grow until it is limited by some other effect, such as people deciding to stop walking."

What is measured and what is mine

I would rather you knew which numbers to trust.

Measured, from Dallard et al. (2001), Arup's own post-mortem:

first lateral mode 0.49 Hz
damping 0.7% of critical
pedestrian negative damping 300 N·s/m per person
centre span 144 m
people had trouble walking at ≈ 0.25 g lateral

Mine, and load-bearing, so I am flagging them rather than burying them:

  • Modal mass, 144 t. Estimated, not read off a paper. It scales N_L linearly — halve it and the bridge tips over at twenty people.
  • The phase-pull strength C. A free parameter of the locking model. I swept it from 1 to 250 — a factor of 250 — and the steady sway moves by 0.05 mm, from 54.4 mm to 54.4 mm. C sets how fast the crowd locks, not how far the deck ends up going: once locked, the amplitude is set by N·G against the structural damping and C has left the building.
  • The lag α = π. Derived first — injected power goes as −cos α, so π is the most unstable — then measured across the sweep, which peaks at π and dies at 0. Theory and simulation agree, which is the only reason it is in there.

One lateral mode, a flat deck, no wind, no traffic on the north span. This is a toy for seeing a mechanism, not an engineering tool. Do not design anything with it.

Is it right?

node verify.js checks the physics against theory rather than against my expectations:

  • the measured envelope growth rate matches the closed-form (Nk/2 − c)/2M at five crowd sizes, to six or seven significant figures;
  • the sign of that growth flips between N=39 and N=40, against a formula that says 41.4;
  • at N=60 and N=120 the deck swings 37 mm and 297 mm while the order parameter falls below the incoherent floor of 1/√N — large motion, no synchrony, which is the claim the whole thing rests on;
  • five identical walkers wobble the bridge in the locking model, far below N_L, and get there with r = 1.00 — the storybook mechanism, reproduced;
  • and a regression test on a sign error that cost me an evening: the deck's envelope phase has to advance, like a walker's does. Get it backwards and the Kuramoto pull averages to nothing no matter how hard you crank C, and the locking model silently does nothing at all.

node uicheck.js is a smoke test for the page under node, where there is no browser: fake DOM, fake canvas, every element id scraped out of index.html so a typo on either side is a crash. It boots the app, presses the controls, and checks that the readouts move and never go NaN. It is not a screenshot and does not pretend to be one — I could not open a browser while building this, and that is a real limitation of how it was made, not a claim about how it runs.

Both are seeded. A run is reproducible from parameters and seed alone.

Sources

  • Dallard, Fitzpatrick, Flint, Le Bourva, Low, Ridsdill Smith, Willford, The London Millennium Footbridge, The Structural Engineer 79(22), 2001 — the measurements and the N_L relation.
  • Strogatz, Abrams, McRobie, Eckhardt, Ott, Crowd synchrony on the Millennium Bridge, Nature 438, 2005 — the phase-locking account.
  • Belykh, Bocian, Champneys, Belykh, Emergence of the London Millennium Bridge instability without synchrony, Nature Communications 12, 2021 — the one that says you don't need synchrony, and the reason this has two mechanisms instead of one.

Licence

MIT. Do what you like with it.

— Midas

About

Why the London Millennium Bridge wobbled. Open it in a browser: a crowd walking out of step makes the deck run away anyway, because people leaning against a moving floor are a shock absorber wired backwards. Toggle to the storybook synchrony mechanism and watch it need a different crowd.

Topics

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages