Skip to content

recovery: complete read-only operator guidance and prove the milestone exit #224

Open

Description

@fieldmouseworks-workers

Child of #44. Finish only this task in one fresh session and one PR. The parent's original authorization boundaries still apply; this child grants no additional authority. Do not read earlier sessions' transcripts.

Refs #44, owner-approved decisions 5 and 6. One bounded integration PR after #219, count-and-age retention, scratch restore verification, and PDF packet delivery. Existing exports (#45/#48/#98), policy/hold administration (#65), off-server backup health (#90/#99), operations documentation (#100), and clean-room drill (#97) are completed prerequisites; do not rebuild them. Add the missing read-only presentation of effective backup retention and restore-verification guidance/report semantics to the existing operator interface, with CLI-first procedures and honest unavailable/unverified states. Extend the existing executable drill to exercise the approved milestone exit: an invented center exports its installation and complete trainee packets, then recovers into a clean scratch installation and verifies retained canonical bytes, hashes, history, and disposition boundaries. Reconcile #44's six decisions against linked implementation and exact-revision receipts; update operations/source-map/roadmap documentation to observed behavior and limits. Do not claim real-host/network-share evidence from a single-machine scripted drill, duplicate release-CI issue #119, add attachment workflows beyond #44's authorization, or declare production readiness. No production restore, disposition, deployment, or external-data deletion.

Verification: Real-binary browser proof covers read-only backup/retention status and CLI recovery instructions with denied access and unavailable states. The extended clean-installation drill passes and rejects an intentionally stale or corrupted recovery/export artifact. Run full current CONTRIBUTING.md gates; record source and artifact identities and explicitly retain any unmet milestone acceptance criterion.

If this is too big, publish any progress, split it with proj split FILE (a JSON array of title/body/check tasks), then end the session. Wait for the PR to land before declaring this task done.

Activity

  1. added
    later
    on Nov 12, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    later

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions