You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
retention: define portable disposition evidence and minimal event storage #212
Child of #64. Finish only this task in one fresh session and one PR. The parent's original authorization boundaries still apply; this child grants no additional authority. Do not read earlier sessions' transcripts.
Depends on the disposition scope and recovery contract. Refs #64 and #44. Implement the typed disposition-event vocabulary and forward schema needed by execution, with independently selected retention policy references and minimal allowlisted evidence. Define a versioned portable format for disposed/unavailable versions and policy-required metadata closure; implement its producer/parser/verifier together with invented golden fixtures. Distinguish retained-hash continuity from unavailable content verification and from a checkpoint boundary; never claim signatures or cryptographic authenticity that the implementation does not provide. Prevent narratives, display-name snapshots, free-form reasons, and destroyed content from leaking into events or operational logs. Account for new schema in installation-export coverage, moving its format/documentation/verifier together where required. No destruction endpoint or event expiry yet. No supplied legal schedule or authority.
Verification: Positive and tampered portable fixtures prove format agreement, unknown-version refusal, honest unavailable/boundary verdicts, and rejection of content-bearing evidence. Schema tests prove event invariants and independent policy references. Existing archive compatibility and full CONTRIBUTING.md gates pass.
If this is too big, publish any progress, split it with proj split FILE (a JSON array of title/body/check tasks), then end the session. Wait for the PR to land before declaring this task done.
Activity