When exporting and importing, the current culture is used for serializing dates, which can lead to ambiguity (e.g. 7/9/2014 vs. 9/7/2014).
When exporting and importing, the current culture is used for serializing dates, which can lead to ambiguity (e.g. 7/9/2014 vs. 9/7/2014).