Repository navigation
test(contracts): the schedules begin with the columns the user guide now lists, and rvt-gltf writes glTF 2 (#873) - #914
Conversation
…now lists, and rvt-gltf writes glTF 2 (#873)
There was a problem hiding this comment.
💡 Codex Review
Here are some automated review suggestions for this pull request.
Reviewed commit: 2585d07b5e
ℹ️ About Codex in GitHub
Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you
- Open a pull request for review
- Mark a draft as ready
- Comment "@codex review".
If Codex has suggestions, it will comment; otherwise it will react with 👍.
Codex can also answer questions or update the PR. Try commenting "@codex address that feedback".
…ALL, layer-set names, every profile source
There was a problem hiding this comment.
💡 Codex Review
Here are some automated review suggestions for this pull request.
Reviewed commit: 47b4f3fd32
ℹ️ About Codex in GitHub
Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you
- Open a pull request for review
- Mark a draft as ready
- Comment "@codex review".
If Codex has suggestions, it will comment; otherwise it will react with 👍.
Codex can also answer questions or update the PR. Try commenting "@codex address that feedback".
Summary
The output-format half of S2 in #873. The user guide now lists the element and room schedule columns, which were documented nowhere. A CLI test checks that each schedule begins with exactly those columns, in order, in feet and with
--metric.rvt-gltf's output is checked to be a glTF 2.0 container. The IFC4FILE_SCHEMAline was already pinned byifc_roundtrip, a real-file target.Changes
docs/user-guide.md, "Get A Schedule Into Excel": two column tables (<!-- element-columns -->,<!-- room-columns -->), each with what the column holds, read fromifc::schedule_csv. The text says what--metricchanges, and that columns may be added at the end but are not renamed, dropped or reordered without a breaking-change notice.tests/rvt_schedule_cli.rs:schedules_begin_with_the_documented_columnsreads the two tables and runsrvt-scheduleon the tier-1 project for both schedules and both units. It fails when the header does not begin with the documented list. The old checks, the first column name, a count of 17 and the exact room header, fail on an added column and pass on a renamed one; they are replaced. The ragged-row check now compares every row with the header.tests/cli_ergonomics.rs: the GLB header's version word is 2.Testing
tools/check-local.sh: not run locally.rvt_schedule_cliandcli_ergonomicsareclitargets that CI's test job runs.rvt-scheduleandrvt-gltfoncorpus/tier1/architectural-2024/architectural-2024.rvt, in this PR's run.Audit-honesty checklist
Legal and contribution hygiene