Skip to content

docs(backlog): B21 parameters progress - #596

Merged
DrunkOnJava merged 1 commit into
mainfrom
docs/backlog-progress-4
Oct 3, 2026
Merged

DrunkOnJava merged 1 commit into
mainfrom
docs/backlog-progress-4

Conversation

@DrunkOnJava

@DrunkOnJava DrunkOnJava commented Oct 3, 2026 •

Copy link
Copy Markdown
Owner

Records B21's progress (#588 to #595) with its red runs and pinned-data approvals, what stays open and why, and two findings logged this session.


Note

Low Risk
Documentation-only backlog and session notes; no runtime or export behavior changes in this PR.

Overview
Moves backlog item B21 (0.5.0 parameters, milestone #35) from open to in progress and adds a progress log for work measured against Revit RE1 property sets.

The log records landed or in-flight PRs #588–#595: room Floor Finish and Pset_SpaceCommon, common Reference / Family:Type naming, the Measure psets_vs_ifc scorer, and pipe segment Length, including red CI runs, integration tests (space_common, common_reference, segment_length), and maintainer-approved pinned property-set / witness updates. It also lists still-open parameter gaps (duct length, FireRating, non-text booleans, storey/building psets) and notes #155, #223, and #228 as untouched.

A new Findings logged this session section captures two research notes: an extra RE1 Plumbing export element rvt-rs emits that Revit does not, and the #227 63rd opening dependency on reading a wall edited profile.

Reviewed by Cursor Bugbot for commit 2daea1a. Configure here.

@DrunkOnJava
DrunkOnJava enabled auto-merge (squash) October 3, 2026 16:19
@DrunkOnJava
DrunkOnJava merged commit a59e6e6 into main Oct 3, 2026
23 checks passed
@DrunkOnJava
DrunkOnJava deleted the docs/backlog-progress-4 branch October 3, 2026 16:22
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant