Skip to content

docs(backlog): B09 done; B20 #227 openings in #584 - #585

Merged
DrunkOnJava merged 2 commits into
mainfrom
docs/backlog-progress-3
Oct 3, 2026
Merged

DrunkOnJava merged 2 commits into
mainfrom
docs/backlog-progress-3

Conversation

@DrunkOnJava

@DrunkOnJava DrunkOnJava commented Oct 3, 2026 •

Copy link
Copy Markdown
Owner

Updates BACKLOG.md: B09 is done (#580), and B20's #227 slab and shading-device openings are in #584, with their Measure evidence. The progress log also records which 0.4.x milestones are blocked here, and why.


Note

Low Risk
Documentation-only updates to backlog status and progress notes; no runtime or test code changes in this diff.

Overview
BACKLOG.md is brought in line with recent merges and in-flight geometry work.

B09 moves from in review to done in the ranked table. The progress log now records #580 as merged, with the existing red/green narrative for tests/element_materials.rs and Measure gains on Core Interior and RE1 disciplines.

B20’s progress section is expanded for milestone #227 and PR #584: slab and shading-device sketch holes as openings (tag = lowest sketch-line id), with draft #583 red run, Measure 62/63 openings within tolerance, and witness regeneration. It also documents the remaining 63rd opening (wall 55840 elevation profile, blocked on edited-profile reading) and a short list of other 0.4.x milestones blocked on Snowdon-only models, missing oracles, or format evidence.

Reviewed by Cursor Bugbot for commit 65de679. Configure here.

@DrunkOnJava
DrunkOnJava enabled auto-merge (squash) October 3, 2026 14:47
@DrunkOnJava
DrunkOnJava merged commit 0f86011 into main Oct 3, 2026
22 checks passed
@DrunkOnJava
DrunkOnJava deleted the docs/backlog-progress-3 branch October 3, 2026 14:50
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant