Skip to content

docs(backlog): progress through B25 - #582

Merged
DrunkOnJava merged 2 commits into
mainfrom
docs/backlog-progress-2
Oct 3, 2026
Merged

DrunkOnJava merged 2 commits into
mainfrom
docs/backlog-progress-2

Conversation

@DrunkOnJava

@DrunkOnJava DrunkOnJava commented Oct 3, 2026 •

Copy link
Copy Markdown
Owner

Brings BACKLOG.md up to date with this session's landed work, recording each item's PR, red run, green run and Measure evidence:

Docs only.


Note

Low Risk
Documentation-only backlog sync; no runtime or test behavior changes in this diff.

Overview
Updates BACKLOG.md only: the ranked backlog table and progress log now match work already merged or answered this session—no code or CI changes in this PR.

Statuses moved to done include B01 (13 community replies), B06–B13, B19, B23 (24,373 lines of mirror suites removed across seven PRs), B24 (measured, no output change), and B25 (Python wheel-job integration suite). B07 and B13 are recorded as done via issue replies (B07 unverified). B09 is in review (#580); B20 is in progress (RE-151 / #227).

The progress log adds PR numbers, CI/Measure run links, and short evidence for each of those items (e.g. material counts for B09, opening/sketch findings for B20).

Reviewed by Cursor Bugbot for commit d0d9590. Configure here.

@DrunkOnJava
DrunkOnJava enabled auto-merge (squash) October 3, 2026 13:32
@DrunkOnJava
DrunkOnJava merged commit 7a917bd into main Oct 3, 2026
22 checks passed
@DrunkOnJava
DrunkOnJava deleted the docs/backlog-progress-2 branch October 3, 2026 13:37
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant