Repository navigation
docs(evidence): the six 2018 to 2021 held-out pairs are used up for W5 and kept as regression checks, and Vitoria's counts are RE-315's (#1261) - #1299
Merged
Conversation
…5 and kept as regression checks, and Vitoria's counts are RE-315's (#1261)
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
The evidence page's held-out paragraph still said both Revit 2018 saves of the Vitoria building export no element. It now gives that as the first measurement, says all six 2018 to 2021 pairs are used up for W5 and stay as counts-only regression checks, and gives
ALD26 Before's andALD26 Project's counts since RE-315 (#1286).Motivation
#1261 and #1286. W5 (docs/release-1.0-criteria.md) has said since #1294 that a pair whose first measurement fails is used up; this page had not caught up, and #1286 changed the 2018 counts.
Changes
docs/evidence.md: the held-out sentence on the six 2018 to 2021 projects.Testing
N/A: docs-only PR. The figures are those of RE-315 and docs/rooms.md on main (Measure runs 41707934595 and 41722201615): Before 1,136 of Revit's 1,321 elements and all 73 spaces; Project 1,336 elements and spaces against Revit's 1,520, none extra; first measurement from run 41658225355.
Audit-honesty checklist
Legal and contribution hygiene
Breaking changes
None.
Related issues
Refs #1261, #408.