Skip to content

OPS-01: Fuzz nightly CI failing since 2026-05-20 — reconcile uncommitted fuzz.yml/Cargo.lock/README + diagnose #97

Closed

Description

@DrunkOnJava

Problem

Nightly fuzz workflow has failed 3 consecutive runs:

  • 2026-05-20 run 26150803463 (27s)
  • 2026-05-21 run 26214739771 (28s)
  • 2026-05-22 run 26277063502 (25s)

All three fail in 25-28s — well before the 300s libFuzzer budget
— suggesting a setup-time failure, not a crash.

There is also uncommitted in-progress work on the fuzz tooling
in the working tree:

  • .github/workflows/fuzz.yml — adds fuzz_placement_subblock_2024
    target + changes cargo install cargo-fuzz to cargo +stable
  • fuzz/Cargo.lock — minor
  • fuzz/README.md — documentation refresh (scaffold notes ->
    current-targets list, mentions fuzz_elem_table not currently
    present in workflow matrix)
  • TODO.md — 3-line addition under M8-04 about Node 20
    deprecation audit

Likely root cause: cargo install cargo-fuzz --locked on
nightly toolchain failed when a transitive dep stopped
supporting nightly's MSRV, or vice versa. The uncommitted
cargo +stable install is the fix-in-progress.

Scope

  • Reproduce locally: cargo +stable install cargo-fuzz --locked and confirm it works.
  • Decide on fuzz_placement_subblock_2024 / fuzz_elem_table
    status — either land them as proper targets or remove from
    README/workflow.
  • Commit reconciled diff atomically (or back out cleanly).
  • Re-trigger nightly run via gh workflow run fuzz.yml and
    confirm green.

Acceptance criteria

  • Next nightly fuzz run completes successfully.
  • Workflow matrix == README target list (no drift).
  • No remaining uncommitted fuzz changes after this issue
    closes.

Related

Activity

  1. added
    area:ci
    priority:P1
    type:bug
    type:ci
    on May 23, 2026
  2. DrunkOnJava commented on Aug 29, 2026

    @DrunkOnJava
    OwnerAuthor

    Closing as completed: fuzz nightly has been green for consecutive scheduled runs after the earlier setup failures.

    Evidence (gh run list --workflow=fuzz.yml --limit 10 as of 2026-08-29):

    Run Conclusion Duration Started
    33240786857 success 6m55s 2026-08-29
    33165207961 success 6m50s 2026-08-28
    33063595429 success 6m46s 2026-08-27
    32943279937 success 6m54s 2026-08-26
    32822017734 failure 48m7s 2026-08-25
    32702532722 success 6m47s 2026-08-24

    Acceptance criteria:

    The single 2026-08-25 failure was followed by green runs through 2026-08-29. Re-open if nightly regresses to sub-minute setup failures.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area:cipriority:P1type:bugtype:ci

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions