Beams: a body that is not Revit's solid (the concrete housing's 20 of 22 beams and the timber housing's 10 of 41; the office's 8 hollow tubes are Revit's since RE-470) #1698
Found while measuring RE-423 (#1693): rvt-rs draws a beam along its location line (BodySourcepartition_beam_axis, RE-328) as its type's section extruded over the record box's length, and on part of the BIM4LCA beams that is not Revit's solid. tools/re/beam_quantities_vs_ifc.py (Measure 42967412141, head 781ed0cd) reads, per file, the beams whose body is not Revit's (extent, area and volume along the same axis):
8 of 8: rvt-rs draws a solid box (0.3411 m³ on the sample beam) where Revit's tube is 0.0221 m³
concrete housing
20 of 22
timber housing
10 of 41
timber office
0 of 71
For the second and third lines Revit's body is the beam cut at its joins (a shorter extent, or a section reduced where another element cuts it); the first is a section the type gives as a rectangle where Revit's has a void. RE-423 writes the six base quantities from the saved mesh without touching these bodies, so the quantities are Revit's while the body is not. Replacing the body by the mesh is what #1191 does for every box, but a first version of RE-423 that did it for these beams failed the same-project gates check on six Autodesk saves, which hold rac_advanced to 29 and rst_basic to 345 beams drawn as partition_beam_axis (tools/re/bodies_across_saves.py MINIMUMS): the question is how a body that is not Revit's is corrected without the gate losing what it guards.
Done when: a beam whose body is not Revit's reads "our body is Revit's" on the BIM4LCA files, by a rule that leaves the beams that already are alone (the timber office's 64 stay extrusions), with the gate's minimums moved in the same change and the reason stated; or the report names the beams it cannot tell and why.
Related: #1693 and RE-423, #94 (sections of structural framing), #1191, #1636.
A measured negative for the office's 8 tube beams: their six missing base quantities cannot come from the saved mesh, and they do follow from the profile this issue is about.
The probe is draft #1759 (probe_beam_tube_quantities), run by Measure 43113951802 on the office as built. All 8 beams (Putkipalkki - suorakaide:PA-1) read alike: one piece, two end planes square to the beam's line, and the lateral faces split into an outer and an inner surface by their normals.
What the mesh gives against Revit's export, in square and cubic metres:
Quantity
From the mesh
Revit's export
Relative difference
CrossSectionArea
0.003893080
0.003894736
4.3e-4
OuterSurfaceArea
5.606103899
5.606919268
1.5e-4
GrossSurfaceArea
5.613890058
5.614708741
1.5e-4
NetSurfaceArea
11.077522008
11.078748375
1.1e-4
GrossVolume
0.022132158
0.022141577
4.3e-4
NetVolume
0.022132158
0.022141819
4.4e-4
The census scores a value equal within a relative 1e-5 (or 1e-6 absolute), so all six would read different on all 8. The mesh is short every time because the tube's rounded corners are chords in it.
The profile Revit draws gives them: outer 200 by 300 mm with 8 mm corners, void 192 by 292 mm with 4 mm corners, length 5,685 mm.
Outer perimeter times length: 5.606919268, Revit's OuterSurfaceArea to the last digit printed.
That plus twice the section: 5.614708861, GrossSurfaceArea within 1.2e-7.
Both perimeters times length plus twice the section: 11.078748495, NetSurfaceArea within 1.2e-7.
Section times length: 0.022141918, NetVolume within 1.0e-7 and GrossVolume within 3.4e-7.
The section itself: 0.003894796, CrossSectionArea within 6.0e-8.
So nothing is written from the mesh, as RE-423 left it, and the six quantities arrive with the body: once the tube is drawn from its profile with the corner arcs, they follow from the profile and the length. Where that profile is in the file is still this issue's open question.
The office's 8 hollow tube beams are drawn as Revit draws them since #2034 (RE-470, Revit 2024): the type holds its profile as bf, d, tf, tw, ri and ra, not the columns' b, Ht, t and kr; CrossSectionArea, OuterSurfaceArea, GrossSurfaceArea, NetSurfaceArea, GrossVolume and NetVolume are written and equal Revit's on all 8 beams of both office files (48 values per file, none different); the profile has Revit's 12 points, lines and arcs to within 0.0005 mm (its ring starts at another vertex and its points are written to six decimals of a metre). No other export of the 120 measured moves. What stays open on this issue is the housing's beams: 20 of the concrete housing's 22 and 10 of the timber housing's 41.
changed the title [-]Beams: a body that is not Revit's solid (the office's 8 hollow tubes, 20 of the concrete housing's 22 beams, 10 of the timber housing's 41)[/-][+]Beams: a body that is not Revit's solid (the concrete housing's 20 of 22 beams and the timber housing's 10 of 41; the office's 8 hollow tubes are Revit's since RE-470)[/+]on Nov 15, 2026
Activity
docs(re): RE-423 names what is left on beams, the Length and Pset_Bea…
feat(ifc): a beam's six base quantities are the sums of the prism its…
feat(ifc): a beam's Length, Span, Slope and Roll are its location lin…
DrunkOnJava commentedon Nov 11, 2026
A measured negative for the office's 8 tube beams: their six missing base quantities cannot come from the saved mesh, and they do follow from the profile this issue is about.
The probe is draft #1759 (
probe_beam_tube_quantities), run by Measure 43113951802 on the office as built. All 8 beams (Putkipalkki - suorakaide:PA-1) read alike: one piece, two end planes square to the beam's line, and the lateral faces split into an outer and an inner surface by their normals.What the mesh gives against Revit's export, in square and cubic metres:
CrossSectionAreaOuterSurfaceAreaGrossSurfaceAreaNetSurfaceAreaGrossVolumeNetVolumeThe census scores a value equal within a relative 1e-5 (or 1e-6 absolute), so all six would read different on all 8. The mesh is short every time because the tube's rounded corners are chords in it.
The profile Revit draws gives them: outer 200 by 300 mm with 8 mm corners, void 192 by 292 mm with 4 mm corners, length 5,685 mm.
OuterSurfaceAreato the last digit printed.GrossSurfaceAreawithin 1.2e-7.NetSurfaceAreawithin 1.2e-7.NetVolumewithin 1.0e-7 andGrossVolumewithin 3.4e-7.CrossSectionAreawithin 6.0e-8.So nothing is written from the mesh, as RE-423 left it, and the six quantities arrive with the body: once the tube is drawn from its profile with the corner arcs, they follow from the profile and the length. Where that profile is in the file is still this issue's open question.
docs(re): RE-442 finds a tube beam's saved mesh short of Revit's six …
docs(re): RE-442 finds a tube beam's saved mesh short of Revit's six …
1 remaining item
fix(ifc): the tube beam's section shape is named by its module path i…
fix(ifc): a tube beam's section is sourced by its own reader, type_tu…
fix(ifc): a beam whose copies in several partitions disagree takes it…
docs(elements): RE-470 records the tube beams: Revit's quantities on …
docs(elements): RE-470 says no Revit 2025 to 2027 model measured hold…
feat(ifc): a beam whose type is a rectangular tube is drawn as that t…
DrunkOnJava commentedon Nov 15, 2026
The office's 8 hollow tube beams are drawn as Revit draws them since #2034 (RE-470, Revit 2024): the type holds its profile as
bf,d,tf,tw,riandra, not the columns'b,Ht,tandkr;CrossSectionArea,OuterSurfaceArea,GrossSurfaceArea,NetSurfaceArea,GrossVolumeandNetVolumeare written and equal Revit's on all 8 beams of both office files (48 values per file, none different); the profile has Revit's 12 points, lines and arcs to within 0.0005 mm (its ring starts at another vertex and its points are written to six decimals of a metre). No other export of the 120 measured moves. What stays open on this issue is the housing's beams: 20 of the concrete housing's 22 and 10 of the timber housing's 41.chore(release): prepare v0.25.0 (#2067)
[-]Beams: a body that is not Revit's solid (the office's 8 hollow tubes, 20 of the concrete housing's 22 beams, 10 of the timber housing's 41)[/-][+]Beams: a body that is not Revit's solid (the concrete housing's 20 of 22 beams and the timber housing's 10 of 41; the office's 8 hollow tubes are Revit's since RE-470)[/+]docs(contribution-map): the rows of #1698 and #1584 state what remain…