Repository navigation
Description
Delivery phase
Phase 2 — backend integration coordination
Goal
Recover delivery of the already implemented and QA-passed B2/B3 changes to main after PRs #70 and #72 were accidentally merged into their feature-branch bases. Use one recovery PR without new backend implementation.
Context and authority
Maintainer reports the incorrect-target merges. B1 PR #61 merged to main at f790803; #70 merged into feat/b1-domain-schema at 3e6efab; #72 merged into feat/b2-read-api at ae0d9fe. The latter branch has a tree identical to reviewed B3 commit 9e8fcc2. Read AGENTS.md, current PRD/specification, ADR 0005 and the existing B1/B2/B3 handoffs. Historical folders remain excluded.
Requirements and constraints
Preserve all shared history, current main frontend work and private inputs. Work in an isolated recovery worktree. No force push, revert, direct main mutation, new product code, B4 implementation, deployment or publication. Maintainer approval remains required for the final merge.
Acceptance criteria
- One recovery PR targets main and contains the missing reviewed B2/B3 implementation.
- Backend/runtime/lock/test/workflow files match the QA-passed B3 delivery; the frontend matches current main.
- Any shared roadmap conflict is resolved with accurate delivery status; no historical folders or private source data are modified or committed.
- Whitespace, applicable hosted checks and independent exact-SHA reconciliation review pass before readiness.
Out of scope and follow-ups
B4 #60 and real frontend integration remain unchanged. Existing B2 #58 and B3 #59 close only after their delivery to main is verified.
Verification plan
Use git ancestry and tree comparisons, git diff --check, existing container-backed quality/API/ETL/frontend CI, and independent QA review of the recovery SHA. Do not add tests for a Git/doc reconciliation. Reuse prior local behavior evidence only when source trees are proven identical; rerun applicable hosted gates.
Dependencies and readiness
The reviewed backend code and exact-SHA QA for #61/#70/#72 are available. No implementation dependency is missing. Recovery is ready for isolated branch preparation; final merge is not authorized by the accident report.
Activity
DavidVFitzGerald commentedon Nov 15, 2026
QA: PASS
Reviewed recovery SHA:
cc69f1e030d5e439433f34dc59ce2c419cef9828, issue #81 / PR #82. Independent reconciliation review; QA changed no application files, tests or acceptance criteria and performed no merge, revert or history rewrite.main. It merges the preserved B2/B3 history into the main base. The preserved feature-branch mergeae0d9fehas exactly the reviewed B39e8fcc2tree, and the recovery retains all reviewed backend implementation.9e8fcc2are empty. Comparisons of frontend source/lockfiles, frontend workflow and Dev Container files against main basef790803are empty. Thus the recovery combines the verified backend with main's current frontend without new application changes.git diff --checkpasses and all four fresh hosted checks pass. Prior independent behavior evidence carries forward because the executable trees are identical; no redundant local suites or documentation-only tests were added.Read-only verification included:
All successful. Hosted exact-head checks: backend-quality, api-quality, etl-quality, frontend quality. These rerun the existing container-backed executable gates on the recovered combination; local QA was Git/document inspection only.
Previous detailed B2 QA and B3 QA remain applicable to the unchanged backend trees. No private source or processing metadata is included in this public evidence.
Next action: maintainer merges only PR #82 into main after review. Keep #58/#59 open until actual main delivery is verified. No additional B4 work, deployment or publication is authorized by this PASS.
DavidVFitzGerald commentedon Nov 15, 2026
Coordinator: READY FOR REVIEW
Recovery PR #82 targets
maindirectly. Branchfix/backend-main-delivery, delivered SHAcc69f1e030d5e439433f34dc59ce2c419cef9828, worktree/tmp/lca-diff-backend-recovery.Independent exact-SHA QA PASS and all four fresh hosted checks passed. Reviewed B2/B3 backend bytes and current main frontend bytes are preserved. The checkout is clean; no private source files, historical contents or new application behavior were changed.
Next action: maintainer merges only PR #82 into main. No branch retargeting or revert is needed. After the main merge is confirmed, verify delivery and close #81/#58/#59. B1 #57 was separately closed after its actual main merge was verified. No recovery merge has been performed by the coordinator. B4 remains unimplemented and the prior stop after B3 remains in effect.
DavidVFitzGerald commentedon Nov 15, 2026
Coordinator: delivery to main verified
The maintainer merged recovery PR #82 into
mainat9b0ebbaf07130ed0a8e8c964a1aca4f2e30b53ac. Its delivered headcc69f1e030d5e439433f34dc59ce2c419cef9828had independent QA PASS and all four required hosted checks passing.Verified that main contains the recovery commit and that API/shared/schema/ETL/runtime/test/lock/tooling/workflow files match independently QA-passed B3
9e8fcc2aedf6ac3f20bd9629946a8e56863f26db. Thus B2 #58, B3 #59 and recovery #81 are delivered and ready for closure. B1 #57 was already closed after its verified main merge.This closure does not claim real frontend integration, full-data release, production deployment or publication. The maintainer has now authorized resuming the remaining backend milestone B4 #60 in its own issue/PR and isolated worktree.